F08 72 OUTGRESPFirst Contingency Outage
Response for SIUC
  • Client SIUC Physical Plant Engineering Services
  • Team Members Rudy Probst, EE
  • Kyle Moore, EE
  • Terry Campanella, PM, EE/CpE
  • Clint Frederick, EE
  • Phil Craig, EE
  • Tanner Jones, EE
  • Faculty Advisor Dr. Constantine Hatziadoniu
  • Client Contact Steve Lazorchak, PE

2
Outline of Topics
  • Executive Summary Rudy
  • Description, Options, and Justification Kyle
  • Mechanical Considerations Subsystem Terry
  • System Protection Subsystem Clint
  • Universal Transformer Subsystem Phil
  • Summary Tanner

3
Executive Summary
  • Issue Major transformer failure Summer 2008
    causing a major outage
  • Project Reduce outage time
  • Typically SIUC reacts to failure instead of
    preparation

4
Executive Summary
  • Expectations
  • Feeder diagram for fault protection
  • Emergency transformer
  • Mechanical restrictions
  • Outage plan
  • Outcome
  • Simulation of feeder diagram
  • Transformer recommendation
  • Recommendations to reduce outage time

5
Executive Summary
  • Results
  • Feeder diagram not as accurate as desired
  • On time
  • On budget
  • Estimated cost to implement 92,000
  • Time to implement Estimated 8 months
  • Cost of study 0

6
Options Investigated
  • Do nothing
  • Purchase 1 transformer
  • Purchase 2 transformers
  • Mobile transformer
  • 3 banked single-phase transformers
  • Form consortium to share costs

7
Option Chosen
  • Purchase two transformers
  • Covers both 480V and 208V transformers
  • Covers most indoor transformers on feeder 7
  • Investigate consortium option
  • Many other institutions have similar issues
  • Coverage against failure of two transformers with
    same secondary voltage

8
Subsystems Flowcharts
  • Implementing recommendations
  • Will reduce outage time at least eight hours
  • Saves money after five uses of each transformers

9
Cost and Time to Implement
  • Costs
  • Two 46,000 transformers
  • Storage facility
  • Time
  • Analyze, confirm, and design replacement 20
    man-hours
  • Finalize contracts to build eight man-hours
  • Prepare storage area unknown
  • Develop plan to replace transformers 58
    man-hours

10
Mechanical Considerations
  • Engineering C 2 transformers
  • No clear pathway to the surface
  • Tunnels covered with desks, coal samples,
    chairs, file cabinets, etc.
  • Will have to avoid steam piping and ledges

11
Replacement Location
  • Limited by breaker handles
  • Block pathway to open area of electrical room
  • Wide open space at backside of electrical room
  • Need cabling to avoid access locations
  • Nails in ceiling limit ability to run cabling

12
Limiting Factors
13
Problems at Arena
14
Ideal Tunnel
15
Actual Tunnel
16
System Protection
  • Ensure that replacement transformers and the
    electrical system will be properly protected
    against fault currents
  • Chose feeder seven to do a protection study
  • Built a model in EasyPower
  • System data

17
System Protection
  • Replaced the present transformers with our
    specified replacement transformers
  • 1000 kVA 12,470 V ? 4160 V ? / 480 V Y
    Z 4.5
  • 1000 kVA 12,470 V ? 4160 V ? / 208 V Y
    Z 4.5
  • Ran the simulation

18
Time-Current Characteristic Curve
19
Universal Transformer
  • Must be electrically and mechanically compatible
  • Several options considered
  • Fourteen of fifteen transformers 208 V or 480 V
    secondary voltage
  • Thirteen of fifteen transformers rated 1000 kVA
    or less
  • Most outdoor transformers are non-critical

20
Mobile Transformer
  • Determined to be non-feasible
  • Cable length to transformer location presents
    problems
  • Voltage drop
  • Safety hazards
  • Security of power system

21
Summary
  • Reduce outage periods
  • Save money for SIUC
  • Recommend database for all power equipment at
    SIUC
  • Estimated cost to implement 92,000
  • Time to implement estimated 8 months

22
Summary - Acknowledgements
  • Steve Lazorchak
  • Damon Adams
  • Rob Estes
  • Justin Harrell
  • Rick Martin
  • Joe Wolfe
  • Keith Field
  • Mrs. Purcell
  • Dr. Hatziadoniu
Write a Comment
User Comments (0)
About PowerShow.com