FRS Technology Assessment Step 2 - PowerPoint PPT Presentation

About This Presentation
Title:

FRS Technology Assessment Step 2

Description:

FRS Technology Assessment Step 2 Common Traffic Scenarios Phil Platt, Nikos Fistas AGCFG 3/WGC11 ... European Organisation for the Safety of Air Navigation ... – PowerPoint PPT presentation

Number of Views:125
Avg rating:3.0/5.0
Slides: 14
Provided by: fist150
Category:

less

Transcript and Presenter's Notes

Title: FRS Technology Assessment Step 2


1
FRS Technology Assessment Step 2 Common
Traffic Scenarios
  • Phil Platt, Nikos Fistas
  • AGCFG 3/WGC11
  • 18-19 September 2006, Brussels

European Organisation for the Safety of Air
Navigation
2
Content
  • Communication requirements
  • Need for common set of scenarios
  • Definition of test volumes
  • Characteristics of the scenarios
  • Application of the scenarios
  • Next steps

3
Communication Requirements
  • The communication requirements are defined by 4
    basic characteristics
  • coverage area
  • numbers of aircraft
  • communication traffic (ATS and AOC)
  • The COCR provides information on requirements
    using service volumes which are based on sectors
  • Phase 1 - size as today
  • Phase 2 - 3 times sector size of today

4
Common scenarios for technology assessment
  • The coverage volume of specific technologies is
    dependent on their characteristics
  • frequency band
  • modulation
  • data rate
  • transmitter power/receiver sensitivity
  • ..
  • The requirements has to be defined in such a way
    that the technology can be assessed
  • a set of scenarios are being developed for use
    in the technology assessment
  • they can be used in the most relevant way for
    each technology
  • Aimed at meeting Phase 2 requirements

5
Basic Test Volumes
  • Initial set are based on 3 basic geometrical test
    volumes have been defined from the COCR for high
    density worse case situation in Phase 2

Volume (nm3)
Height Range
Dimensions
Shape
Service Volume
26
0 5000ft
10NM diameter
Cylinder
Airport
7691
5000ft FL245
49NM x 49NM
3D rectangle
TMA
10132
FL245 FL450
55NM x 55NM
3D rectangle
ENR
6
Additional Test Volumes
  • The COCR service volumes are based on
    operational sectors
  • variety of shapes and densities
  • not necessarily matched to technology capability
  • The need to evaluate how a technology would be
    implemented in larger volumes as these affect
    infrastructure choices and/or spectrum needs
  • Therefore additional test volumes are being
    created for
  • Larger TMA type test volumes
  • Larger ENR type test volumes
  • Whole of ECAC - based on likely terrestrial
    coverage

7
Sets of test volumes
10NM
Airport
5000ft
Ground
TV2.2
TV2.1
75NM
49NM
TMA
FL245
5000ft
Ground
ENR
8
ECAC test volume
9
ECAC test volume
  • The ECAC test volume has been defined as the
    sectors likely to be in coverage of a terrestrial
    system
  • en route sectors
  • TMA sectors
  • Total PIAC derived from SAAM

10
Air/Air Test Volume
  • COCR defines 3 ranges for a/a broadcast - 5NM,
    60NM and 200NM

11
Traffic Scenarios
  • For each test volume, a traffic scenario is being
    developed giving
  • Number of aircraft in the test volume (derived
    from SAAM data)
  • Capacity requirements
  • Uplink and downlink ATS and AOC capacity
    requirements per aircraft in respect of
  • Air-Ground addressed transactions
  • Air-Air addressed transactions
  • Air-Ground broadcast transactions
  • Air-Air broadcast transactions
  • COCR does not identify requirements for a/a
    addressed or a/g broadcast

12
Sharing of Traffic Scenarios
  • An Excel file is being created containing the key
    parameters that will define the set of scenarios
  • The file format is being defined but will include
  • aircraft numbers
  • communication requirements - a/g, a/a - addressed
    and broadcast - in the test volumes
  • The file will be made available to support
    assessment of technologies

13
Next steps
  • Completion of the parameters for the set of test
    volumes
  • calculation of communications requirements in
    large volumes
  • Distribution of the file for technology
    assessment
  • file planned to be completed by early-October
Write a Comment
User Comments (0)
About PowerShow.com