Title: Salvatore Chiarelli
1Contact Information
Salvatore Chiarelli Director Of Physical Plant
UVM 284 East Avenue, Burlington VT
05405 (802)656-1072 (802)656-1075
fax schiarel_at_uvm.edu http//www.uvm.edu/uvmppd
2What I Expect To Share With You Today
- Some general information about the Physical Plant
- Issues of mutual interest.
- OUR MISSION
- To maintain facilities, perform related services
and provide responsible stewardship of the
University of Vermonts physical assets in
support of the Universitys mission.
3Items of Interest From SGAAnti-Idling
Policy, if there is not one, plans to create
Plans to reduce the Carbon Foot
PrintRelationship with the wood chip burning
facility that is down near the intervale
4Great Staff In PPDThey Do All The Work And
Deserve All The Credit
5Physical Plant Department 2009About 190
Employees
- Heat/Chilled Plant
- HVAC
- CPR Shop
- Custodial
- Plumbing
- Electric Shop
- Asbestos/Lead
- Recycling/Solid Waste
- Administration
- Service Operations
- Material Management
- Grounds
- Energy Management
- Zone Maintenance Shops
6Some Responsibilitiesof Physical Plant(What do
we get involved in)basically, everything
7HVAC Repair Practices
8Electrical Issues
9Innovation And Technology
10Grounds Work
11At Times Taking On Other Roles
12DisclaimerNone Of The Previous Pictures Were
Taken At UVM
They Were Actually Taken At Dartmouth
13Energy Management
- Pro-active
- Working with departments
- Eco-Reps Program
- 1 Million/year energy loan
- More proactive in repairs
- Working with utilities
- Real time metering
- Get message out to students/faculty/staff
- Rebates equate to about 10 of each dollar
invested - Condensate return 90
14Energy Management Continued
- Steam trap maintenance
- Central Steam system
- Back up fuel is .25 Sulfur (voluntarily)
- Central chilled water plant
- LEED Certifications
- Preventive Measures (maintenance, inspection)
- Control systems 70,000 points on campus
- Many lighting upgrades
- High efficiency motors
- Delta V Boiler Controls
- Steam lines
- Davis Center Dashboard
- Camus Growth 15, reduction in steam demand by
approximately 10 - Enernoc
- Many others
15(No Transcript)
16Utilities Master Planning
17Plant Controls System Delta V
18Central Chilled Water Plant
19Load Shed/Response
Utility Tracking
20Life Safety Systems
Sprinkler Valves Blue Lights Elevator
Phones Exterior Doors General Safety In Rooms
21Emergency Blue Lights
22Questions