1FITA premission seminar CROATIA Brussels, 25
November 2011
2WATROPEC before the start
- 26 28 March 2008
- FITA (Flanders International Technical Agency)
mission
3WATROPEC before the start
- 26 28 March 2008
- FITA (Flanders International Technical Agency)
mission
4WATROPEC Project framework
- Bi-lateral agreement Croatia Flanders
- Co-operation program Flanders and Croatia
(2008-2010)
5WATROPEC before the start
- May 2008
- follow-up visit Croatian Water
- July August 2008
- local beneficiaries?
- January 2009
- Belgian Embassy proposed new potential partners
EcoTech ? local beneficiaries - 5 March 2009
- Project proposal introduced to the
Flanders/Belgian government - 26 June 2009
- Minister Environment, Nature and Energy signed
6WATROPEC Project paperwork
- Total budget 222 k EUR
- Financial support Flanders
- Flanders Government 140 k EUR
- Promotors 47 k EUR
- Financial support Partners
- Minimum 15
- In kind ? confirmation letters
7WATROPEC the project in general
- Financed by the Flanders region,
- Environment, Nature and Energy Department.
- Water Treatment Optimization with Ecological
Criteria (WATROPEC). - Started 16 July 2009, 18/24 months
- total budget is 221.679,-
- 140.172,- is contributed by the Flemish
Government. - In the middle of the EU pre accession
- (Urban Water Directive, Water Framework
Directive...). - Case studies and training
- transfer of know-how, experiences
Not what to do, not how to do ...
8Croatian partners for dissimination
- CROATIAN WATER
- CROATIAN WATER POLLUTION CONTROL SOCIETY
- (HDZV)
- - University of Split
- (Prof. Roko Andricevic)
9WATROPEC issue description
- Water Framework Directive
- water management at the level of a river basin
- the surface waters should obtain a good
ecological quality - Wastewater treatment installations will reduce
the pollution - Efficiency - Evaluation
10WATROPEC issue description
Schematic overview of the integral system under
study
11WATROPEC Project planning (original)
what has changed
12WATROPEC Project phases
- Phase 1 inception.
- Phase 2 data collection
- Opaija (see comment)
- Varazdin
13Monitoring Campaign
14Biological measurements hand net samples
1528 Sampling locations
16Sorting macroinvertebrates
17Biological assessment
Identification and counting of macroinvertebrates
18Field Protocols
19Technical information sheets
20Biological assessment
Biological water quality map for the monitoring
21WATROPEC project conclusions
- Very good cooperation
- Model prediction improves the quality of the
decisions. - Studies without the integrated modelling approach
can not give this information (results). - This results can be directly used to achieve the
goals of the European Water Framework Directive. - the basis for further cooperation and projects
was laid down
22Futher cooperation
Not what to do, not how to do ...
- the basis for further cooperation and projects
was laid down for new projects - Meeting needs of Tourism Industry
- (Istria, Kvarner Bay/Opatija ... And many other
sites) - Optimize costs of WWTP
- Energy use / electricity
- sludge production and quality (stabilization)
related to better means of sludge management like
biogas plants, production
23(No Transcript)