Description:

concrete plinth at the lower floor part of the building. fill up the cellar. floor extension frame over the trench. Beam line radiation shielding support over the ... – PowerPoint PPT presentation

Number of Views:56
Avg rating:3.0/5.0
Slides: 8
Provided by: hepun
Category:

less

Transcript and Presenter's Notes

Title: Infrastructure and layout:


1
Infrastructure and layout status and plans
Yury Ivanyushenkov Applied Science
Division, Engineering and Instrumentation
Department RAL
MICE-UK Meeting, September 6, 2005
2
MICE hall preparations
3
MICE phase I initial
4
MICE phase I final
5
MICE hall preparations To-do list
  • Floor levelling
  • concrete plinth at the lower floor part of the
    building
  • fill up the cellar
  • floor extension frame over the trench
  • Beam line radiation shielding support over the
    trench.
  • Staircases modification
  • the staircase on the ISIS linac side of the
    building
  • the staircase on the ISIS control room side
  • Holes in the roof and the north wall
  • in the roof for ventilation ducts
  • in the wall for hydrogen vents

6
MICE hall preparations To-do list (2)
  • Hydrogen system RD area
  • hydrogen extract hood and vent lines
  • part of mezzanine floor
  • part of magnetic shielding wall
  • The rest of magnetic shielding walls.
  • Beam-line radiation shielding.

7
MICE hall preparations Status and plans
  • General layout is completed.
  • Discussion with RAL civil engineers has started
  • -gt work will be done by the external company
  • Programme of hall modification is being prepared