Title: Warmte en kracht produktie vanaf biomassa
1Warmte en kracht produktie vanaf biomassa
Vakgroep Toegepaste Mechanica Faculteit
Toegepaste Wetenschappen J. De Ruyck jdruyck_at_vub.a
c.be
2Best use of biomass ??
- As construction material ?
- For pure heat production ?
- For combined heat and power production ?
- For electric power production only ?
- For transport (liquid fuels) ?
- Which technology ?
3 4Candidate technologies ?
- Extensive search for hard projects
- Below 2 MWe only cogeneration, heat driven
- Investment cost per kW thermal major criterion
600-700 euro per kWth - Global efficiency major criterion 90-110 LHV
- Electric efficiencies 12-25
5Candidate technologies ?
- Collected data for 65 sites/projects
- Start year
- Type of fuel
- Power output
- Electric/thermal efficiency
- Total investment cost
- CO,SOx, NOx, dust emissions
6Candidate technologies cost ?
7Candidate technologies efficiency ?
8Candidate technologies emissions versus cost ?
9Candidate technologies ?
- Selected systems
- Stirling engine, 5-30 kWe range
- Fixed bed gasifier/piston engine, 300-600 kWe
- Organic Rankine Cycle, 500-1500 kWe
- Conventional steam cycle, gt 1000 kWe
10Selected systems investigation
- Extended questionnaires, site visits
- More detailed information about
- Technology
- Costs
- Grid connection
- Fuel handling
- Part load conditions
- Lifetime
- Residues, noise, size
11Stirling engine (Harz, Austria)
12Stirling engine (Harz, Austria)
- Not yet commercially available, but several
promising demonstrations units - Problems mainly fouling and vibration, noise
- 25 engine efficiency (from engine heat to power)
- 12 electric, 86 total efficiency
- Asynchronous, no transformer, 380V direct on grid
- Startup times 1 to 5 hours
- Ability for load following unknown, not enough
experience
13Fixed bed gasifier (Xylowatt REGAL unit, Belgium)
14Fixed bed gasifier (Xylowatt REGAL unit, Belgium)
- Commercially available, 5 plants in preserial use
- Problems unknown..
- 25 electric 75 total efficiency
- Asynchronous, no transformer, 220V direct on grid
- Startup times 5-20 minutes !
- Ability for load following none, no part load
operation
15ORC (Turboden TIRANO Italy)
16ORC (Turboden TIRANO Italy)
17ORC (Turboden TIRANO Italy)
- Succesfull commercial operation, total of more
than 50 000 hours operation - High availability (ORC 98), minor problems with
boiler, pumps,.. - 15 electric near 100 total efficiency
(condensing boiler !) - Asynchronous, no transformer, 400V direct on grid
- No gear box direct turbine connection (not
possible with synchronous generator) - Startup times 2 hours to 5 days (due to
refractory lining) - Good part load behaviour (turndown ratio 30)
18ORC (Turboden TIRANO Italy)
19ORC (Turboden TIRANO Italy)
20Conventional steam cycle (Puulaakso, Finland, 1
MWe)
21Conventional steam cycle (Puulaakso, Finland, 1
MWe)
- Succesfull commercial operation, most common
technology - High availability, no information about problems
- 10 electric near 87 total efficiency
- Synchronous, grid connected, stand alone possible
- Startup times ½ hour to ½ days (refractory)
- Good part load behaviour (turndown ratio 30)
22?