Title: CNES program status
1CNES program status
- Prepared by E. Thouvenot, CNES
- August 2007
2CNES Strategy in Oceanography
- Contribute to operational outcome of altimetry
 TOPEX/POSEIDON gt JASON1 gt JASON2/OSTM
gtJASON3 ERS 1 2 gt ENVISAT gt SENTINEL3
CORIOLIS, MERCATOR/COO/ECOMF, ... - Continue research activities for future
altimetry missions/instruments (AltiKa,
WSOA, Water,) - Contribute to space measurements of other ocean
physical parameters - - salinity SMOS, CNES contribution to ESA
project - - directional wave spectrum (SWIM/CFOSAT)
- ocean colour (SSO or GEO) - Prepare ocean applications of ORFEO (Cosmo
SkyMed/Pleiades) mainly coastal applications
3CNES involvment in altimetry
Reference mission Ocean Large scale
Complementing mission mesoscale, ice
Earth reference system
1990
experiment
ERS-1 (ESA) Altimeter algorithm
TOPEX/POSEIDON (CNES/NASA) Launcher DORIS
POSEIDON Mission Center
ERS-2 (ESA)
2000
ENVISAT (ESA) DORIS Altimeter Processing Archive
distrib.
Jason-1 (CNES/NASA) Satellite bus DORIS
POSEIDON Control Mission Center
2005
HY-2 (CNSA) DORIS ?
Jason-2 / OSTM (CNES/NASA/EUMETSAT/NOAA) Satellit
e bus DORIS POSEIDON Control Mission Center
ALTIKA/SARAL (CNES/ISRO) Altimeter, radiometer,
DORIS, Lra Process, archive distrib.
PLEIADES (CNES) DORIS
2010
CRYOSAT2 (ESA) DORIS
SALP Altimetry and precise positioning service
operational
MERCATOR assimilation, forecast CNES / SHOM /
METEOFRANCE / IFREMER / CNRS / IRD
4Status of altimetry missions/activities
- TOPEX/POSEIDON
- Stopped after more than 13 years of ocean
observations - Jason1/TOPEX tandem mission success !
- ENVISAT
- excellent synergy with Jason1 (T/P and ERS
complementarity further improved) - DORIS
- 5 DORIS receivers simultaneously in flight
earth reference system strengthened - MERCATOR
- inter Agency structure for the implementation of
an oceanographic forecasting center in Europe in
the mid term (GMES Marine Core Service) - AltiKa Implementation phase approved. Launch
possible from end-2009. - SALP/SSALTO/AVISO multi-mission ground segment
- Next Step possible contribution(s) to
HY-2A/Water/SENTINEL3/JASON3 (TBD)
5AVISO Data user teams
6Jason1
- Qualified in orbit
- Operational mission underway
- Products distributed routinely
- CNES operations funded through SALP
- Required lifetime 3 years (achieved in
december, 2004) - Extended mission 5 years (achieved in december,
2006) - Extension agreement for 5 more years of operation
signed between CNES NASA on december, 2006
7Jason2/OSTM
- Cooperative Framework between NOAA/NASA/EUMETSAT/C
NES - basic mission, continuation of Jason1 (Core
Mission) - Technological passengers to enhance DORIS
performance (CARMEN2/LPT, T2L2) - 4-party MoU
- CNES/EUMETSAT agreement
- LPT CNES/JAXA MoU
- Launch date june 15, 2008
8SARAL/AltiKa
- Program approved on december, 2005
- Altimetric Gap filler between ENVISAT SENTINEL3
- Research oriented mission - new, higher
frequency, greater performance - potential new
applications on ice, land, coast areas - but with a consolidated architecture
conventional altimeter - Cooperative framework CNES/ISRO
- Initially, AltiKa wa supposed to be embarked on
OCEANSAT3 mission (with other ocean-dedicated
sensors) - However, delay on OCEANSAT3 schedule
- May/June 2006 CNESISRO proposition to embark
AltiKa payload with Argos3, on a new platform,
named SSB (Small Satellite Bus), which is
presently being developed by ISRO. - July2006/November2006 CNESISRO technical
studies to assess the feasibility ok - Confirmation of CNESISRO cooperation on this new
baseline obtained on December 2006 SARAL
mission (Satellite with ARgos ALtika) - CNES/ISRO MOUs signed in february, 2007
- Tentative launch date end-2009/early-2010
- Data policy the same as JASON missions
(through CNES/ISRO RAs)
9AltiKa performance
Large improvement wrt current altimetry missions
- altimetric noise 3 times better on ocean-
very good coastal and inland (rivers, lakes)
performance - main limitation of AltiKa
non-operationality for rain rate gt several mm/h
(5 to 10 of time depending on the geographic
area), however not a constraint when associated
to JASON2
Comparison of tracking performance on western
Corsica coastline -AltiKa alone (at
left) -AltiKa DIODE/DORIS (at right)
10Status of altimetry programs
11Next Steps
- HY-2A CNES/CNSA discussions underway
- Payload Dual frequency altimeter, nadir
3-frequency radiometer, 5-frequency scanning
radiometer, scanning scatterometer,
DORIS/GPS/LRA - Orbit SSO 6am-6pm, 14 days (after 1-year
geodetic mission) - Launch 2009
- JASON3
- NOAA/EUMETSAT cooperation with EC, CNES NASA
(TBC) contributions - CNES in-kind contribution Proteus platform and
project team equivalent to JASON/OSTM (i.e. about
one third of European part of the program) - Launch end-2012
- WATER (or SWOT) CNES/NASA discussions underway
- Ku/C nadir altimeter (SRAL) Ka-band wide-swath
SAR-altimeter - Phase 0 in 2007 (CNES/JPL)
- Cooperation scheme TBD
- Launch 2013-2016 timeframe
- and contributions to ESA/EC missions Cryosat2,
Sentinel3 (TBD)
12Future mission with a new parameter measured from
Space SMOS Soil Moisture and Salinity
Mission
13SMOS Soil Moisture and Salinity Mission
- ESA Mission Earth Explorer Opportunity
Mission - Cooperation between ESA / CDTI / CNES
- Science Objectives
- - Soil Moisture
- - Ocean surface salinity
- Phase C/D in progress
- Launch 2nd semester 2008
- CNES IFREMER will develop the CATDS (L3/L4
processing center)