Title: CNES program status


1
CNES program status
  • Prepared by E. Thouvenot, CNES
  • August 2007

2
CNES Strategy in Oceanography
  • Contribute to operational outcome of altimetry
      TOPEX/POSEIDON gt JASON1 gt JASON2/OSTM
    gtJASON3 ERS 1 2 gt ENVISAT gt SENTINEL3
    CORIOLIS, MERCATOR/COO/ECOMF, ...
  • Continue research activities for future
    altimetry missions/instruments (AltiKa,
    WSOA, Water,)
  • Contribute to space measurements of other ocean
    physical parameters
  • - salinity SMOS, CNES contribution to ESA
    project
  • - directional wave spectrum (SWIM/CFOSAT)
    - ocean colour (SSO or GEO)
  • Prepare ocean applications of ORFEO (Cosmo
    SkyMed/Pleiades) mainly coastal applications

3
CNES involvment in altimetry
Reference mission Ocean Large scale
Complementing mission mesoscale, ice
Earth reference system
1990
experiment
ERS-1 (ESA) Altimeter algorithm
TOPEX/POSEIDON (CNES/NASA) Launcher DORIS
POSEIDON Mission Center
ERS-2 (ESA)
2000
ENVISAT (ESA) DORIS Altimeter Processing Archive
distrib.
Jason-1 (CNES/NASA) Satellite bus DORIS
POSEIDON Control Mission Center
2005
HY-2 (CNSA) DORIS ?
Jason-2 / OSTM (CNES/NASA/EUMETSAT/NOAA) Satellit
e bus DORIS POSEIDON Control Mission Center
ALTIKA/SARAL (CNES/ISRO) Altimeter, radiometer,
DORIS, Lra Process, archive distrib.
PLEIADES (CNES) DORIS
2010
CRYOSAT2 (ESA) DORIS
SALP Altimetry and precise positioning service
operational
MERCATOR assimilation, forecast CNES / SHOM /
METEOFRANCE / IFREMER / CNRS / IRD
4
Status of altimetry missions/activities
  • TOPEX/POSEIDON
  • Stopped after more than 13 years of ocean
    observations
  • Jason1/TOPEX tandem mission success !
  • ENVISAT
  • excellent synergy with Jason1 (T/P and ERS
    complementarity further improved)
  • DORIS
  • 5 DORIS receivers simultaneously in flight
    earth reference system strengthened
  • MERCATOR
  • inter Agency structure for the implementation of
    an oceanographic forecasting center in Europe in
    the mid term (GMES Marine Core Service)
  • AltiKa Implementation phase approved. Launch
    possible from end-2009.
  • SALP/SSALTO/AVISO multi-mission ground segment
  • Next Step possible contribution(s) to
    HY-2A/Water/SENTINEL3/JASON3 (TBD)

5
AVISO Data user teams
6
Jason1
  • Qualified in orbit
  • Operational mission underway
  • Products distributed routinely
  • CNES operations funded through SALP
  • Required lifetime 3 years (achieved in
    december, 2004)
  • Extended mission 5 years (achieved in december,
    2006)
  • Extension agreement for 5 more years of operation
    signed between CNES NASA on december, 2006

7
Jason2/OSTM
  • Cooperative Framework between NOAA/NASA/EUMETSAT/C
    NES
  • basic mission, continuation of Jason1 (Core
    Mission)
  • Technological passengers to enhance DORIS
    performance (CARMEN2/LPT, T2L2)
  • 4-party MoU
  • CNES/EUMETSAT agreement
  • LPT CNES/JAXA MoU
  • Launch date june 15, 2008

8
SARAL/AltiKa
  • Program approved on december, 2005
  • Altimetric Gap filler between ENVISAT SENTINEL3
  • Research oriented mission - new, higher
    frequency, greater performance - potential new
    applications on ice, land, coast areas
  • but with a consolidated architecture
    conventional altimeter
  • Cooperative framework CNES/ISRO
  • Initially, AltiKa wa supposed to be embarked on
    OCEANSAT3 mission (with other ocean-dedicated
    sensors)
  • However, delay on OCEANSAT3 schedule
  • May/June 2006 CNESISRO proposition to embark
    AltiKa payload with Argos3, on a new platform,
    named SSB (Small Satellite Bus), which is
    presently being developed by ISRO.
  • July2006/November2006 CNESISRO technical
    studies to assess the feasibility ok
  • Confirmation of CNESISRO cooperation on this new
    baseline obtained on December 2006 SARAL
    mission (Satellite with ARgos ALtika)
  • CNES/ISRO MOUs signed in february, 2007
  • Tentative launch date end-2009/early-2010
  • Data policy the same as JASON missions
    (through CNES/ISRO RAs)

9
AltiKa performance
Large improvement wrt current altimetry missions
- altimetric noise 3 times better on ocean-
very good coastal and inland (rivers, lakes)
performance - main limitation of AltiKa
non-operationality for rain rate gt several mm/h
(5 to 10 of time depending on the geographic
area), however not a constraint when associated
to JASON2
Comparison of tracking performance on western
Corsica coastline -AltiKa alone (at
left) -AltiKa DIODE/DORIS (at right)
10
Status of altimetry programs
11
Next Steps
  • HY-2A CNES/CNSA discussions underway
  • Payload Dual frequency altimeter, nadir
    3-frequency radiometer, 5-frequency scanning
    radiometer, scanning scatterometer,
    DORIS/GPS/LRA
  • Orbit SSO 6am-6pm, 14 days (after 1-year
    geodetic mission)
  • Launch 2009
  • JASON3
  • NOAA/EUMETSAT cooperation with EC, CNES NASA
    (TBC) contributions
  • CNES in-kind contribution Proteus platform and
    project team equivalent to JASON/OSTM (i.e. about
    one third of European part of the program)
  • Launch end-2012
  • WATER (or SWOT) CNES/NASA discussions underway
  • Ku/C nadir altimeter (SRAL) Ka-band wide-swath
    SAR-altimeter
  • Phase 0 in 2007 (CNES/JPL)
  • Cooperation scheme TBD
  • Launch 2013-2016 timeframe
  • and contributions to ESA/EC missions Cryosat2,
    Sentinel3 (TBD)

12
Future mission with a new parameter measured from
Space SMOS Soil Moisture and Salinity
Mission
13
SMOS Soil Moisture and Salinity Mission
  • ESA Mission Earth Explorer Opportunity
    Mission
  • Cooperation between ESA / CDTI / CNES
  • Science Objectives
  • - Soil Moisture
  • - Ocean surface salinity
  • Phase C/D in progress
  • Launch 2nd semester 2008
  • CNES IFREMER will develop the CATDS (L3/L4
    processing center)