U.S. Army Modularity Program - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

U.S. Army Modularity Program

Description:

Masterplan integrated with on-going operations. Prefabricated structures ... Integration with Installation masterplan. Sensible schedule. Sensible programming. ... – PowerPoint PPT presentation

Number of Views:86
Avg rating:3.0/5.0
Slides: 12
Provided by: jennyb9
Category:

less

Transcript and Presenter's Notes

Title: U.S. Army Modularity Program


1
U.S. Army Modularity Program
  • Dwight DurhamNovember 4, 2004 Washington, DC

2
Taji, Iraq Case Study
3
Taji Installation
4
Taji Utilities
5
Taji, Iraq Case Study
  • Bed down facility for 4th Infantry Division
  • Accommodations for 12,500 personnel
  • Grass roots project, no existing infrastructure
  • Six (6) month schedule
  • Masterplan integrated with on-going operations
  • Prefabricated structures
  • Phased construction and occupancy
  • Utilities phased to meet requirements

6
Taji Lessons Learned
  • Operations need to drive the masterplan
  • Detail design to start after masterplan approval
  • Procurement should drive design
  • Design to what is available and within schedule
  • Design to minimize O M requirements
  • Fast track approach requires concurrent
  • Procurement
  • Design
  • Construction
  • O M

7
Modularity Needs
  • Fast track program
  • Adaptable / flexible facilities for universal use
    (type of unit)
  • Facilities adaptable to architectural styles of
    each installation
  • Facilities designed for flexible use
  • Administration, warehousing / logistics,
    maintenance
  • Facilities that will outlast budgeted life cycle

8
Family and Bachelor Housing
  • Residential Communities Initiative enables
    private resourcing
  • Army sets the standards
  • Private sector finances, designs, builds,
    maintains
  • Facilities are a long-term solution
  • Program is no cost to the Army
  • Plan for the procurement / development cycle

9
Grass Roots Project Needs
  • Masterplan
  • Utilities
  • Environmental Permitting
  • Road Infrastructure
  • Security

10
Keys to Success
  • Clearly define operational needs
  • Army agreement on functional needs
  • Integration with Installation masterplan
  • Sensible schedule
  • Sensible programming. Design to budget
  • Plan for an EIS
  • Plan for utilities capacity and delivery
  • Adequate transportation network

11
Keys to Successful Contracting
  • Contractor with proven expertise
  • Contractor who can deliver local content
  • Award on value, not lowest cost
  • Excellence in schedule and cost management
Write a Comment
User Comments (0)
About PowerShow.com