1SIMTEC 2008 04/JULHO/2008
2INSTALED CAPACITY
As of December 31st, 2006
NUCLEAR 3,0
NATURAL GAS 4,0
MINERAL COAL 1,8
OIL DERIVATIVES 2,4
HYDRO 75,7
OTHERS (including Biomass) 4,1
IMPORTS 9,0
Source Ministry of Mines and Energy
3ENERGY DEMAND
Historic al
Projected
High Demand Scenario
Base Case Scenario
Low Demand Scenario
Source Ten Year Expansion Plan of EPE
(subsidiary of the Ministry of Mines and Energy)
4REGULATED X DEREGULATED MARKET
Overview
Total Energy Consumption of SIN1 (Jan/08)
50.819 MW
- Deregulated Market
- Consumption Jan/08 13.213 MW
- Energy Sellers
- Conventional Sources
- Renewable Sources
- Energy Buyers
- Conventional consumers
- A4 Consumers.
26
74
- Regulated Market
- Consumption Jan/08 37.606 MW
- Energy Sellers
- Conventional Sources
- Renewable Sources
- Energy Buyers
- Utility Companies.
1- Interconnected System.
5ENERGY SUPPLY DEMAND
Balanço Histórico entre Demanda e E. Assegurada
Físico
(inclui ANDE)
55.0
50.0
45.0
40.0
35.0
30.0
GW médios
25.0
20.0
15.0
10.0
5.0
-
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
31.8
31.8
31.8
32.7
33.0
33.7
34.1
34.9
37.2
38.9
39.9
43.2
46.5
49.3
50.8
50.5
51.6
50.0
Oferta
26.5
27.9
28.3
29.9
31.3
33.3
35.0
37.2
38.6
39.8
41.6
38.4
40.3
42.4
44.5
46.5
48.3
50.6
Demanda
6Bioelectricity is sugarcanes next frontier
7BREAKDOWN OF SUGARCANES ENERGY
Energy equivalent of 1 tonne of sugarcane 1.2
oil barrel
Source UNICA
8BENEFITS OF BIOELECTRICITY
- Experience and know how
- Plants are self-sufficient in energy
- Reduced construction period
- Construction in 24-30 months
- Renewable and clean energy
- Low environmental impact
- Provide carbon credits
- Synergy with hydro production pattern
- Bioelectricity is produced during the dry season
- Smaller projects and broader range of investors
- Eliminate risks of delay and construction
problems. - Strengthen the national equipment industry and
create jobs - Location close to main load centers
í
í
Sources PSR, Cogen, Unica. Elaboration Unica.
9Growing Role of Bioelectricity
Source UNICA, COGEN.
10Sugarcane Industry Expansion Areas
11(No Transcript)
12Resumo Potências e Investimentos Planejados
13CONCLUSION
Better Remuneration to Incentive Cogeneration
Energy
14THANK YOU !
PEDRO ISAMU MIZUTANI COO