Title: PRESENTATION ON INTRA


1
PRESENTATION ON INTRA STATE ABTBY GENERAL
MANAGER (SLDC) DELHI
2
INTRA STATE ABT IN DELHI
AS A FIRST IN THE WHOLE COUNTRY INTRA-STATE ABT
HAS BEEN IMPLEMENTED FOR DELHI w.e.f.
1-4-2007. AS PER THE ORDER OF DELHI
ELECTRICITY REGULATORY COMMISSIONDATED 31-3-2007

3
Why Intra State ABT
  • Intra-state ABT is a techno-economic
  • tool for bringing rational tariff structure for
    supply of electricity from State generators to
    the distribution Licensees.
  • It is a mechanism for enforcing discipline in
    the Grid.


4
Benefits of Intra State ABT
  • a) Benefits to the Power System
  • Brings about grid discipline by maintaining
    frequency in prescribed band (49.5 to 50.5 Hz).
  • Ensures optimum utilization of available
    generation capacities.
  • Enhances opportunities for Open access, and
    Trading of electricity.
  • Scope for encouraging competition among
    generators.


5
  • b) Benefits to the Generator
  • Encourages maximization of Generation during peak
    hours with incentives and discourages the same
    during off-peak hours with penalties linked with
    frequency.
  • Enables systematic scheduling in terms of long
    term, short term as well as day ahead, duly
    considering plant availability and maintenance.
  • Ensures better life of equipments due to
    efficient management of Demand Vs Supply. Thereby
    the Hidden Costs due to damage is avoided.
  • The three-part Tariff under ABT provides for
    proper recovery of fixed and variable costs of
    Generator.


6
  • c) Benefits to the Distribution Licensees
  • Economic efficiency dictates that the least cost
    power should be dispatched in preference to
    costly power (Merit Order Dispatch). ABT provides
    for the same.
  • Licensees can plan their requirement, both for
    peak and off peak demands.
  • Enables efficient Load Management through their
    own Area Load Dispatch Centers.


7
  • d) Benefits to the End Users
  • Enables open access, captive generation and
    trading of electricity.
  • Ensures quality and reliable power supply.
  • Scope for reduction in cost of power due to
    licensees opting for merit order dispatch in
    their scheduling.


8
Constituents of Intra-State System after
restructuring of DVB

DELHI VIDYUT BOARD

All the assets and liabilities of DVB are
acquired by GNCTD
All the liabilities of DVB are transferred to
Holding Company, entire Equity of Holding Company
is issued to GNCTD

Holding Co.
Government of National Capital Territory of Delhi
Distribution Licensees
Genco
Transco
BRPL
BYPL
NDPL
NDMC
MES
9
CONSTITUENTS OF INTRA-STATE ABT in DELHI
  1. BSES RAJDHANI POWER CO. LTD.
  2. BSES YAMUNA POWER CO. LTD.
  3. NORTH DELHI POWER CO. LTD.
  4. NEW DELHI MUNICIPAL COUNCIL.
  5. MILITARY ENGINEERING SERVICES.
  6. IP STATION.
  7. RPH STATION.
  8. GT STATION.
  9. PRAGATI STATION.
  10. BADARPUR THERMAL POWER STATION.

10
Power Allocation to Distribution Licensees
  • POWER PURCHASE AGREEMENTS HAVE BEEN
    ASSIGNED TO THE DISTRIBUTION LICENSEES BY THE
    ORDER OF DERC DATED 31.3.2007. THE SALIENT
    FEATURES OF PPA ASSIGNMENT ARE AS UNDER -
  • NDMC MES have been allocated 350 MW 50 MW
    respectively from the BTPS generating station as
    basic allocation.
  • Allocation from other Central Sector and State
    Sector has been assigned to BRPL, BYPL NDPL in
    line with their consumption pattern for the
    period 1.7.2002 to 28.2.2007.
  • 15 of BTPS (after allocation to NDMC and MES)
    DADRI NCTPS thermal) IPRPHPPCLGT has been
    considered as un-allocated share and is placed at
    the disposal of the Govt of NCT of Delhi.
  • In case the allocation of the un-allocated power
    is not made by the government the same would be
    allocated to the distribution licensees except
    NDMC and MES in proportion to the basic
    allocation.

11
Power Allocation Table
  • ON THE BASIS OF DERC ORDER DATED 31.3.2007,
    THE SOURCE-WISE ALLOCATION OF POWER TO THE
    DISTRIBUTION LICENSEES HAS BEEN COMPUTED AS UNDER
    FOR SCHEDULING PURPOSES -

  LICENSEES 'ALLOCATION IN ' LICENSEES 'ALLOCATION IN ' LICENSEES 'ALLOCATION IN ' LICENSEES 'ALLOCATION IN '  
SOURCE NDMC MES NDPL BRPL BYPL TOTAL
C. SECTOR 0 0 29.18 43.58 27.24 100
BTPS 49.65 7.09 12.62 18.85 11.78 100
IP 0 0 29.18 43.58 27.24 100
RPH 0 0 29.18 43.58 27.24 100
GT 0 0 29.18 43.58 27.24 100
PRAGATI 0 0 29.18 43.58 27.24 100
HIMACHAL 0 0 33.33 33.34 33.33 100
DVC 0 0 29.18 43.58 27.24 100
12
Details of Unallocated Quota of Power available
with Govt of Delhi
S. No. Description Formula Un-allocated power in MW
1. 15 of Balance power of BTPS after allocation of 350 MW to NDMC 50 MW to MES (705-350-50)15 46 MW
2. 15 of Dadri (Thermal) Capacity (756)15 113 MW
3. 15 of (IPRPHGTPPCL) (185135282330)15 140 MW
TOTAL TOTAL TOTAL 299 MW
13
Steps Taken By SLDC Delhi For Implementation of
Intra-State ABT
  • The Scheduling Dispatch procedures finalized
    with stake holders
  • on 31.3.2007.
  • All Distribution Licensees authorized SLDC to
    schedule available
  • resources as per the requirement of Grid in
    line with the IEGC
  • provisions section 6.5(5) which stipulates as
    under
  • The SLDCs may also give standing instructions
    to the RLDC such
  • that the RLDC itself may decide the drawal
    schedules for the States.
  • This ensures centralized scheduling for
    optimum utilization of available
  • sources to Delhi as a whole. This procedure
    has been in existence since
  • December 2002 i.e. the date of implementation
    of ABT in NR.


14
  • SCHEDULING GUIDELINES CONSTITUENTS
  • 1. While requisitioning power requirement
    ,minimum technical requirement to ensure the
    continuity of the generating stations and
    maximum availability should be taken care of by
    DISCOMs. The requisition from central sector gas
    stations should not be less than 70 of the
    respective availability capacity in normal
    conditions and 50 under emergency conditions.
    As far as Hydro and Nuclear stations are
    concerned, the entire availability would be
    utilized at all the times. However the storage
    capacity of Hydro stations is exploited by RLDC
    depending upon the requirement of the grid.
  • 2. Requisition for BTPS should not be less than
    80 due to size and age of the machines.
  • 3. PPCL cannot go beyond 80 due to pollution
    stipulations.
  • Full requisition should be there for IP and
    RPH considering their age and core generation.
  • 5. Due to size pollution stipulation for
    IPGCLs GT, it should not be less than 70.


15
PROCESS FOR SCHEDULING BY 1000 HRS ISGS shall
advise NRLDC the station wise MW and MWH
capabilities. BY 1000 HRS BTPS,GENCO and PPCL
shall declare the availability in 15 minutes time
block in terms of MW and MWH. BY 1100
HRS Entitlement of the state shall be posted by
NRLDC in their website www.nrldc.org for central
sector. BY 1100 HRS SLDC shall post the
GENCO,PPCL and BTPS availability in its website
www.delhisldc.org BY 1300 HRS NDPL,BRPL,BYPL,ND
MC and MES shall intimate the SLDC, source-wise
requirement of power for succeeding day in
terms in MW and MWH in 15 minutes time
block. BY 1500 HRS SLDC shall assess the
requirement of power from all sources and
intimate the same to NRLDC. BY 1700 HRS NRLDC
shall convey the net drawal schedule for Delhi
and posted in the website. BY 1800 HRS SLDC
shall post the provisional Drawal Schedule and
Generation Schedule of Generating stations within
Delhi based on the provisional Drawal schedule
of Delhi as a whole posted on the NRLDC
website. BY 1900 HRS GENCOs/Licensees shall
alter the schedule of generation /requirement
and intimate the same to SLDC for forwarding
the same to NRLDC for incorporation in final
drawal schedule of Delhi. BY 2200 HRS SLDC
shall inform the modification if any,for
incorporating in the final drawal schedule to
NRLDC. BY 2300 HRS NRLDC shall issue the final
drawal schedule of Delhi state along with other
states and posted in their website. BY 2330
HRS SLDC shall compute the drawal schedule of
DISCOMs and generation schedule of generating
stations within Delhi based upon the
availability from central sector stations
bilateral agreements entered into by various
distribution licensees for the next day.
Intra-day scheduling as per IEGC provisions is
also permitted.

16
DRAWAL SCHEDULES IN INTRA-STATE ABT
17
GENERATION SCHEDULES IN INTRA-STATE ABT
18
ABT BILLING METHODOLOGY
  • ABT is, basically, a three part tariff system
    consisting of the following components -
  • Fixed charges on monthly basis subject to
    adjustment on yearly basis.
  • Variable charges - on monthly basis.
  • Unscheduled inter-change (UI) charges. on
    weekly basis.

19
FIXED CHARGES
  • The Fixed Charges are to be paid to the
    Generating Source on the basis of allocation
    irrespective of the drawal provided the
    generating stations attain respective
    availability factor prescribed by the appropriate
    Regulatory Commissions. For Central sector
    Thermal and Gas Stations the availability factor
    is fixed at 80 whereas for Hydro Stations the
    availability factor (capacity index) is 90
    except few stations i.e. Tanda Talchar Thermal
    stations. The nuclear stations are not covered
    under the ABT.

VARIABLE CHARGES
  • The Variable Charges are to be paid to the
    Generating sources on the basis of scheduled
    allocation fixed by the Regional Load Despatch
    Centre keeping in mind the technical limits for
    regulation of generation. The limit is 70 of the
    maximum available capacity for thermal stations
    whereas that of Gas stations it is 60 in normal
    conditions and 50 in extreme emergency condition
    as fixed by RPC Forum.
  • As far as Hydro and Nuclear stations are
    concerned, the entire availability would be
    utilized at all the times. However the storage
    capacity of Hydro stations is exploited by RLDC
    depending upon the requirement of the grid.

20
UNSCHEDULED INTER-CHANGE (UI) CHARGES
  • The UI for a Generating Station shall be equal to
    its actual generation minus its scheduled
    generation. UI for States shall be equal to its
    total actual drawal minus its total scheduled
    drawal.
  • UI shall be worked out for each 15 minutes time
    block. Charges for all UI transactions are based
    on average frequency of the time block.
  • The UI Tariff structure as on 31.3.2007 is as
    under.

Average Frequency of time-block UI Rate (P/kWh)
----------------------------------------
----------------------------------- 50.5 Hz and
above 0.00 Below 50.50 Hz and upto 50.48 Hz
6.00 Below 49.04 Hz and upto 49.02 Hz 561.00
Below 49.02 Hz 570.00 Between 50.50 Hz and
49.82 Hz Linear in 0.02 Hz steps _at_ 6 P/kWh
for each step Below 49.82 Hz Linear in 0.02
Hz steps _at_ 9P/kWh for each step
21
AS PER THE INTRA-STATE ABT ORDER OF DERC THE
INTRA-STATE UI RATE WOULD BE THE RATE DECIDED BY
CERC AS ON 31.3.2007. THE RATES OF UI FOR THE
FREQUENCY BAND 49.0 Hz TO 50.5 Hz ARE AS UNDER

22
PROPOSED NEW UI RATES
  • CERC vide Press Release dated 7-4-2007 has
    proposed the New UI Vector for enforcing strict
    Grid discipline as given below

Average Frequency of time-block UI Rate (P/kWh)
----------------------------------------
----------------------------------- 50.5 Hz and
above 0.00 Below 50.50 Hz and upto 50.48 Hz
6.00 Below 49.52 Hz and upto 49.50 Hz 345.00
Below 49.02 Hz 745.00 Between 50.50 Hz and
49.82 Hz Linear in 0.02 Hz steps _at_ 6 P/kWh
for each step Between 49.80 Hz and
49.52 Hz Linear in 0.02 Hz steps _at_ 9P/kWh
for each step Between 49.50 Hz and 49.02
Hz Linear in 0.02 Hz steps _at_ 16P/kWh for
each step
COMMENTS ARE INVITED BY CERC BY 23rd APRIL 2007
ON THE ABOVE PROPOSAL FOR REVISION OF UI VECTOR.
23
IF THE PROPOSAL OF CERC IS IMPLEMENTED THE RATES
FOR UI FOR THE FREQUENCY BAND BETWEEN 49.0 Hz
50.5 Hz WOULD BE AS UNDER

24
Intra State UI Pool Account
SLDC has been mandated by the DERC order dated
31.3.2007, Para No. 18(3) to maintain the
Intra-State UI Account which states as under
  • SLDC Shall act as the Nodal Agency for
    collection and Distribution of UI charges as far
    as intra-state ABT is concerned. As regards
    regional ABT, a settlement mechanism shall
    immediately be worked out together by the STU,
    SLDC and Discoms (who are represented in the RPC)
    in consultation with NRLDC.


25
UI SETTLEMENT MECHANISM IN INTRA-STATE ABT
  • At Inter state level the Unscheduled
    interchanges of central sector and Inter regional
    sources are determined with reference to their
    schedule at the point of injection but those of
    SEBs with reference to their ex-periphery
    schedule. Datum for working out UI not being same
    for all entities, this results in UI MISMATCH
    which is equalised by averaging the two ON DAILY
    BASIS.
  • The above adjustment is required to equalize
    payable UI amount to receivable UI amount so that
    UI pool account is maintained as a Zero balance
    account.


26
METHODOLOGY FOR ZERO BALANCING THE UI POOL
ACCOUNT AT INTER-STATE LEVEL
  • UI AMOUNT IS DRAWN FOR ALL THE UI POOL MEMBERS
    ON ACTUAL BASIS.
  • FROM THE UI ACCOUNT AMOUNT RECEIVABLE MEMBERS AND
    AMOUNT PAYABLE MEMBERS TO THE POOL IS SEPERATELY
    DRAWN OUT.
  • AMOUNT PAYABLE AND RECEIVABLE WILL NOT MATCH
    BECAUSE FOR GENERATORS THE UI IS DRAWN OUT BASED
    ON INJECTION SCHEDULE AT GENERATOR PERIPHERY
    WHEREAS FOR STATES THE SAME IS BASED ON DRAWAL
    SCHEDULE AT STATE PERIPHERY.
  • AS PER THE CERC STIPULATION THE UI POOL ACCOUNT
    SHOULD BE A ZERO BALANCE ACCOUNT.
  • AT RPC LEVEL THE UI MISMATCH i.e. THE DIFFERENCE
    BETWEEN UI PAYABLE RECEIVABLE IS EQUALIZED BY
    AVERAGING THE TWO ON DAILY BASIS. HOWEVER THE UI
    OVER HVDC AND OTHER INTER-REGIONAL LINKS IS
    RETAINED WITHOUT ANY ADJUSTMENT.
  • THE UI MIS-MATCH IS CALCULATED ON DAILY BASIS AND
    APPORTIONED TO ALL UI POOL MEMBERS IN THE RATIO
    5050 TO THE PAYING AND RECEIVING MEMBERS IN THE
    RATIO OF THE ORIGINAL UI AMOUNT DRAWN OUT.
  • 7. A CASE STUDY BASED ON THE ABOVE METHODOLOGY
    FOR 19-3-2007 UI ACCOUNT ISSUED BY NRPC IS SHOWN
    IN THE NEXT SLIDE.


27
SAMPLE CASE FOR 19TH MARCH 2007
ACTUAL UI AMOUNT FOR PAYEE AND RECEIVING
CONSTITUENTS

28
METHODOLOGY FOR ZERO BALANCING THE UI POOL
ACCOUNT AT INTER-STATE LEVEL
  • MIS-MATCH BETWEEN THE PAYABLE AND RECEIVABLE
    AMOUNT FROM THE UI ACCOUNT IS (903.0818-820.2534)
    82.8285 LACS RUPEES.
  • THIS DIFFERENCE IS DIVIDED EQUALLY BETWEEN THE
    TWO i.e. PAYING RECEIVING ENTITIES IN THE
    RATIO 5050 AMOUNTING TO 41.41423 LACS RUPEES
    EACH.
  • SINCE NO INTER-REGIONAL LINK IS AMONGST THE
    RECEIVING UTILITES 41.41423 LACS IS DIVIDED
    AMONGST ALL THE RECEIVING UTILITIES IN
    PROPORTION TO THEIR UNADJUSTED UI AMOUNT.
  • AMONGST THE PAYING UTLITIES EXCLUDING THE
    INTER- REGIONAL LINKS THE AMOUNT OF 41.41423 LACS
    IS CREDITED TO ALL IN PROPORTION TO THEIR
    UNADJUSTED UI AMOUNT.
  • THE ADJUSTED ACCOUNTS ARE DISPLAYED IN THE NEXT
    SLIDE.


29
ADJUSTED UI ACCOUNT FOR PAYEE AND RECEIVING
CONSTITUENTS

30
In Intra State ABT also the UI account should
be a Zero Balance Account which indicates UI
payable/receivable to/from the Regional UI pool
account should be equal to the UI
receivable/payable in the Intra-State UI pool
Account.The following mechanism is proposed
1. STU/SLDC shall draw-out the Intra-state UI
account in same principle as that of
Inter-state UI account.2. As mentioned in case
of inter-state level the Unscheduled
interchanges of Generating stations within
Delhi are to be determined with reference to
their schedule at the point of injection but for
Distribution Licensees with reference to their
ex-periphery ( at the licensees periphery)
schedule. 3. The amount payable / receivable
to the Regional pool account would then be
equated on the basis of Intra-state ABT amount.
METHODOLOGY FOR ZERO BALANCING THE UI POOL
ACCOUNT AT INTRA-STATE LEVEL


31
SAMPLE CASE FOR INTRA-STATE ABT SETTLEMENT
ACTUAL UI AMOUNT FOR PAYEE AND RECEIVING
CONSTITUENTS

32
METHODOLOGY FOR ZERO BALANCING THE UI POOL
ACCOUNT AT INTER-STATE LEVEL
  • MIS-MATCH BETWEEN THE PAYABLE AND RECEIVABLE
    AMOUNT FROM THE UI ACCOUNT IS (536.268-505.000)
    31.268 LACS RUPEES.
  • THIS DIFFERENCE IS DIVIDED EQUALLY BETWEEN THE
    TWO i.e. PAYING RECEIVING ENTITIES IN THE
    RATIO 5050 AMOUNTING TO 15.634 LACS RUPEES
    EACH.
  • AMONGST THE RECEIVING UTILITES 15.634 LACS IS
    DIVIDED AMONGST ALL THE RECEIVING UTILITIES IN
    PROPORTION TO THEIR UNADJUSTED UI AMOUNT.
  • AMONGST THE PAYING UTLITIES EXCLUDING THE
    INTER- STATE ACCOUNT THE AMOUNT OF 15.634 LACS IS
    CREDITED TO ALL IN PROPORTION TO THEIR
    UNADJUSTED UI AMOUNT.
  • THE ADJUSTED ACCOUNTS ARE DISPLAYED IN THE NEXT
    SLIDE.


33
ADJUSTED UI ACCOUNT FOR PAYEE AND RECEIVING
CONSTITUENTS

34
ACCOUNTING METHODOLOGY FOR MONTHLY ENERGY ACCOUNTS
  • FOR GENERATING STATIONS WITHIN DELHI
  • SLDC SHALL COMPUTE
  • A) STATIONWISE AVAILABILITY BASED ON THE DECLARED
    CAPACITY BY GENERATING STATIONS ON REAL TIME
    BASIS AS PER THE PROVISIONS OF IEGC. (IEGC
    STIPULATES
  • TO DISCOURAGE FRIVOLOUS REVISIONS, RLDC (IN
    DELHIS CASE, SLDC) MAY, AT ITS SOLE DISCRETION,
    REFUSE TO ACCEPT SCHEDULE / CAPABILITY CHANGES OF
    LESS THAN TWO (2) PERCENT OF THE PREVIOUS
    SCHEDULE / CAPABILITY).
  • THESE WOULD BE COMPILED ON MONTHLY AND
    CUMMULATIVE FINANCIAL YEAR BASIS IN PERCENTAGE.

35
  • THE SOURCEWISE ALLOCATION WOULD ALSO BE DRAWN
    OUT BY SLDC BASED ON DERC ORDER ON TIME TO TIME
    ON MONTHLY AND CUMMULATIVE FINANCIAL YEAR BASIS
    IN PERCENTAGE.
  • SCHEDULED ENERGY FOR THE MONTH DRAWN OUT FROM
    DAILY IMPLEMENTED SCHEDULES PREPARED ON 15
    MINUTES TIME BLOCKS.
  • D) INCENTIVE ENERGY ON MONTHLY BASIS AND
    CUMMULATIVE FINANCIAL YEAR BASIS PAYABLE BY THE
    DISTRIBUTION LICENSEES SHALL BE COMPUTED FOR THE
    ENERGY SCHEDULED FROM THE STATIONS BEYOND THE
    TARGET PLF FIXED FOR INCENTIVE PURPOSE FIXED BY
    THE APPROPRIATE COMMISSION.

36
  • 2 FOR CENTRAL SECTOR
  • AFTER ISSUANCE OF NRPC ACCOUNTS IN RESPECT OF
    ISGS AND OTHER SHARED GENERATING STATIONS, SLDC
    SHALL COMPUTE FOLLOWING
  • SOURCE WISE ALLOCATION OF THE SOURCES ON
    MONTHLY AND CUMULATIVE FINANCIAL YEAR BASIS IN
    PERCENTAGE AS SHOWN BELOW

  LICENSEES 'ALLOCATION IN ' LICENSEES 'ALLOCATION IN ' LICENSEES 'ALLOCATION IN ' LICENSEES 'ALLOCATION IN '  
SOURCE NDMC MES NDPL BRPL BYPL TOTAL
C. SECTOR 0 0 29.18 43.58 27.24 100
BTPS 49.65 7.09 12.62 18.85 11.78 100
IP 0 0 29.18 43.58 27.24 100
RPH 0 0 29.18 43.58 27.24 100
GT 0 0 29.18 43.58 27.24 100
PRAGATI 0 0 29.18 43.58 27.24 100
HIMACHAL 0 0 33.33 33.34 33.33 100
DVC 0 0 29.18 43.58 27.24 100
B) SOURCEWISE SCHEDULED ENERGY TO EACH
DISTRIBUTION LICENSEES BASED ON THE DAILY
IMPLEMENTED SCHEDULES. C) SOURCEWISE
INCENTIVE ENERGY FOR THERMAL AND GAS STATIONS ON
MONTHLY BASIS AND CUMMULATIVE FINANCIAL YEAR
BASIS. CENTRAL SECTOR GENERATING STATIONS AND
GENERATING STATIONS WITHIN DELHI SHALL RAISE
BILLS ON MONTHLY BASIS BASED ON THESE ACCOUNTS
ISSUED BY SLDC.
37
3 CENTRAL SECTOR TRANSMISSION CHARGES
  • FOR TRANSMISSION CHARGES BILL, NRPC ISSUES THE
    WEIGHTED AVERAGE PERCENTAGE SHARE OF CENTRAL
    SECTOR GENERATING CAPACITY BASED ON WHICH
    TRANSMISSION CHARGES ARE PAYABLE TO PGCIL.
  • THESE CHARGES WOULD FURTHER BE BIFURCATED AS PER
    SLDC COMPUTATION OF CENTRAL SECTOR ALLOCATION TO
    DISTRIBUTION LICENSEES IN DELHI.
  • AT PRESENT, NO CENTRAL SECTOR TRANSMISSION
    CHARGES ARE APPLICABLE TO NDMC AND MES AS BOTH
    ARE NOT ALLOCATED ANY POWER FROM CENTRAL SECTOR
    STATIONS AS PER THE DERC ORDER.

38
  • THE TRANSMISSION CHARGES APPORTIONMENT OF
    DISTRIBUTION LICENSEES WOULD BE AS UNDER

39
4 STATE SECTOR TRANSMISSION CHARGES
  • FOR STATE SECTOR TRANSMISSION CHARGES, BILLS
    SHALL BE ISSUED BY STU BASED ON THE ALLOCATION OF
    STATE SECTOR GENERATING CAPACITY TO THE
    DISTRIBUTION LICENSEES BASED ON THE CHARGES FIXED
    BY DERC.

40
SCHEDULING EXPERIENCE
In scheduling dispatch of power there no major
hurdle except the fact that there is a mismatch
between requirement availability of NDMC and
MES due to entire requirement has been booked to
single source i.e. BTPS. When all machines of
BTPS are on bars these utilities are left with
surplus power whereas if machines are down there
is a shortage and over-drawal by both the
utilities.
41
CASE STUDY FOR NDMC
The following table indicates that the scheduling
done by SLDC in case of NDMC and MES is most
economic as mandated by the law (EA 2003 Section
32.2.(e)) which indicates The State Load
Despatch Centre shall be responsible for
carrying out real time operations for grid
control and despatch of electricity within the
State through secure and economic operation of
the State grid in accordance with the Grid
Standards and the State Grid Code.
42
CASE STUDYFOR MES
Due to single source allocation to MES the vital
utility is facing shortages due to outage of
units at BTPS which is evident from the
scheduling profile for 01-04-2007 as indicated
hereunder
This scenario has also happened in case of NDMC
when Unit No. 5 1 at BTPS were out due to the
similar constraints.
43
Disposal of Surplus Power and Availing additional
requirement to meet the peak demand.
  • SLDCs role as per IEGC clause 4 of Annexure 1
    is only as a facilitator not a trader/broker
    for identifying buyer/seller for arranging
    scheduled inter-change within the region or
    across the regional boundary.
  • For arriving at the Drawal Schedule of
    Distribution Licensees they are required to
    indicate the quantum of power from their share
    to be booked for sale. They are not able to
    match their individual schedule with the total
    requirement. The example is as shown in the next
    slide.

44
Disposal of Surplus Power
SLDC faced difficulties in scheduling purposes
for power transfer of Delhi to UPPCL and Delhi
to TPTCL during off-peak hours. In both the deals
BRPL was the co-ordinator and has to give the
agreed aggregate requirement of the buyers i.e.
to the tune of 400 550 MW in case of UPPCL
and upto 200 MW in case of TPC. Finally SLDC has
to apply the own logic to draw out the drawal
schedules of the states as was done in case of
UPPCL deal effective from 5-4-07.
Utilities Quantum indicated at Delhi Periphery by BRPL in MW Quantum finalized by SLDC at Delhi Periphery in MW Percentage Share as finalized by SLDC
BRPL 170 137 34.25
BYPL 90 72 18.0
NDPL 115 93 23.25
NDMC 100 80 20.0
MES 22 18 4.5
TOTAL 497 (against the requirement of 400 MW) 400 100
The same percentage share has been applied to TPC
deal also.
45
Availing the additional Power to meet the peak
Demand
On behalf of Discoms DTL has committed 750 MW
off-take from MP during July to October07 the
corridor booking is required to be done by 19th
April07 for July transaction and 19th May07 for
August transaction, etc. SLDC requested all
Distribution Licensees to book the corridor as
per the individual requirement. It was also
advised in case no agreement for individual
agreement is arrived the ratio of CPSU allocation
made to Distribution Licensees be applied for
booking the corridor. The individual quantum as
per CPSU allocation are as under
Utilities Share of CPSUs Quantum to be booked as per CPSU allocation in MW
BRPL 43.58 327
BYPL 27.24 204
NDPL 29.18 219
Total 100.00 750
Note NDMC MES demand is likely to be met
from the allocation of BTPS i.e. 49.65 and
7.09 capacity allocation from BTPS
respectively.
These co-ordination activities should be done by
DPPG instead of SLDC.