Dir G DG Research - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

Dir G DG Research

Description:

Assuring process transparency, traceability of produced parts, shop floor automation /security ... CA /SSA: April 24, and September 16, 2003 (single stage) Budget ... – PowerPoint PPT presentation

Number of Views:38
Avg rating:3.0/5.0
Slides: 9
Provided by: Christoph513
Category:
Tags: ca | dir | future | research | shop

less

Transcript and Presenter's Notes

Title: Dir G DG Research


1
6th Framework Programme Future of IMS
  • Dir G - DG Research
  • Warszawa, 20go stycznia 2003

2
IMS in FP6
  • IMS continues in FP6, but not with a separate
    call as in FP5
  • Explicitly mentioned in the FP6 Specific
    Programme Integrating and strengthening the
    European Research Area
  • in particular within
  • Priority Area 2 - Information Society
    technologies, and
  • Priority Area 3 - Nanotechnologies and
    nanosciences, knowledge-based multifunctional
    materials, new production processes and devices

3
Work Programme priority 2 Products and
Services Engineering 2010 Shared initiative
between priorities 2, 3
  • Challenges
  • Methodologies, tools, work environments for the
    conceptualisation, design, make of products and
    services /delivery, product support, servicing,
    EoL
  • Integration of miniaturised devices and related
    software into intelligent end-products
  • Value creation processes in manufacturing
    /knowledge /information flow between suppliers
    and users /novel approaches to customisation,
    logistics, maintenance
  • Holistic product design /development and
    distribution tools and methods

4
Work Programme priority 2 Products and
Services Engineering 2010 - continued Shared
initiative between priorities 2, 3
  • Global standardisation initiatives
  • Inter-enterprise business processes (planning,
    scheduling, co-ordination)
  • Assuring process transparency, traceability of
    produced parts, shop floor automation /security

5
Manufacturing , products and service engineering
in 2010 Shared initiative between priorities 2
3
  • Knowledge communities in production
    technologies /to support dynamic organisations,
    inter-enterprise operability, and necessary
    standardisation /advances in virtual production,
    supply chain and life-cycle mgmt, decision-aid
    systems, rapid manufacturing

6
Manufacturing , products and service engineering
in 2010 Shared initiative between priorities 2
3
  • Joint call
  • IPs and NoEs ? projects with strong international
    cooperation added value are encouraged IP /NoE
    may have an extensible IMS module covering all
    (or part of) the project
  • Specific Support Actions (SSA) and Coordination
    Actions (CA) e.g. to cluster existing national
    /international projects( see detail in note
    page)

7
Manufacturing , products and service engineering
in 2010 Shared initiative between priorities 2
3
  • Joint call (see ad-hoc Guide for Proposers)
  • DeadlinesIP /NoE April 24, 2003 (1st stage)
    September 16, 03 (2nd stage) CA /SSA April 24,
    and September 16, 2003 (single stage)
  • Budget25 M (of which 20 M for the new
    instruments) pre-allocated from priority 2 35
    M (of which 25 M for the new instruments) from
    priority 3

8
International CollaborationAction carried out
jointly between priority 2 and 3
  • Support coordination of international research
    activities
  • benchmarking of research activities and policies
    in the field of IMS
  • stimulation of knowledge communities, support to
    IMS enlargement
  • support to the development of an international
    engineering curriculum
Write a Comment
User Comments (0)
About PowerShow.com