Detector activities after the IB upgrade - PowerPoint PPT Presentation

About This Presentation
Title:

Detector activities after the IB upgrade

Description:

Virgo Activities. New high power laser. N. Mann. FS monolithic suspension activities ... Man power is an issue: Many persons are involved in both ... – PowerPoint PPT presentation

Number of Views:57
Avg rating:3.0/5.0
Slides: 16
Provided by: michel242
Category:

less

Transcript and Presenter's Notes

Title: Detector activities after the IB upgrade


1
Detector activities after the IB upgrade
  • Michele Punturo

2
What we must do
  • 0 priority
  • commissioning
  • 1 priority
  • Items to be implemented
  • Acoustic shielding in the laser lab
  • Improvement of the cleanliness procedure in the
    towers
  • New coil drivers
  • (MC LC windows?)
  • Items to be investigated
  • MC end mirror
  • Better substrate
  • Heavier payload
  • BS mirror
  • Larger mirror
  • Reduce scattered light
  • Eddy current dissipation
  • New electronics
  • Thermal compensation Phase camera
  • New quadrant centering devices (galvanometers)

3
Virgo Activities
  • New high power laser
  • N. Mann
  • FS monolithic suspension activities
  • M.Punturo

4
Acoustic Shielding in the LL
  • Reduce the cross talk between the acoustic
    channel and the dark fringe
  • All the racks with fans displaced during the
    shutdown
  • A coverage of the laser table and of the external
    injection bench is under design
  • Two offers received
  • 30 k
  • 16 k
  • A third company contacted
  • Offer in few days
  • Implementation
  • End of winter, beginning of spring
  • As soon as an executive design will be available
    it will be shown in a detector meeting

5
Cleanliness improvement in the tower
  • Wednesday, past week
  • When the NI problem occurred I prepared
    (16/04/2003) this list of rules
  • Keep the mirror clean
  • Remove the dust particles through an ionized air
    jet after the integration and tuning procedures
  • Inject, during the venting only dray air
  • Warm up the mirror, to reduce the probability of
    condensation on it
  • Some of them havent been respected
  • Need to patch the problem now (cleaning
    intervention)
  • Need to solve the problem in the future
  • Control of the moisture
  • Ionized warm air flux (need of infrastructure
    upgrade, already indicated in the urgent
    purchases in the October 2005 Detector Meeting in
    Naples)

6
Actuation Noise
G.Losurdo
7
New coil drivers
  • New coil drivers have been designed by INFN Pisa
    EGO support to solve the actuation noise
    problem
  • Two different sections
  • High power section for lock acquisition
  • Low noise section for linear regime
  • The two sections are driven by two independent
    DACs
  • Full production of new coil drivers in one year
  • Prototypes already installed in the end towers
    (EM contamination)
  • Simplified solution in the input towers
    (switchresistor)
  • Simplified solution in the BS tower

8
NEW end MC mirror
  • The losses in the MC are 846 ppm (F.Bondu)
    instead of 115 ppm
  • Defects and contamination in the curved MC mirror
  • This mirror must be replaced

9
Small or large MC mirror?
  • Two new small substrates have been sent to GS
    Lumonics (Raffaele, could you confirm?)
  • The possibility to use a large substrate must be
    investigated
  • Better control of the payload
  • almost standard geometry
  • Herasil substrate available
  • Movement mechanics complicated
  • Optics Mechanics studies must be started now

10
New BS?
  • Stray light is evident in the BS
  • With the higher injected power the problem should
    be enhanced
  • Larger BS needed
  • New substrate (wedge) to be realized

11
Eddy current FUTURE problem
  • Virgo design
  • M0.017 A m2
  • Stainless Steel RM
  • sRM1.4106W-1m-1
  • Qeddy1.8108
  • Current design
  • M0.05 A m2
  • Aluminum RM
  • sRM3.2107W-1m-1
  • Qeddy9.4105

Experimental test (VIR-NOT-PER-1390-27 (1996),
VIR-NOT-PER-1390-80 (1997), Rev.Sci.Instr. 69,
2777 (1998))
12
Magnetic Field Now
steel support
Aluminum RM
Macor support
coil
magnet
post
mirror
13
With Iron Hat
14
Test in Clean Room
15
Conclusions
  • In parallel to the commissioning activities many
    detector activities are foreseen (and many more
    are needed)
  • Man power is an issue
  • Many persons are involved in both commissioning
    and detector
Write a Comment
User Comments (0)
About PowerShow.com