Cosmic test stand current status - PowerPoint PPT Presentation

About This Presentation
Title:

Cosmic test stand current status

Description:

1 chamber (dimension 1200) new HH old mezzanine. Acquisition type: Based on DAQ-1 with ... Scintillators and trigger signals are acquired using a TDC. Slow ... – PowerPoint PPT presentation

Number of Views:69
Avg rating:3.0/5.0
Slides: 3
Provided by: nbber
Category:

less

Transcript and Presenter's Notes

Title: Cosmic test stand current status


1
Cosmic test stand current status
  • 2 chambers in test
  • 1 chamber (dimension 1680) old electronics
  • 1 chamber (dimension 1200) new HH old mezzanine
  • Acquisition type
  • Based on DAQ-1 with CSM-0 and RIO2 processor
  • Scintillators and trigger signals are acquired
    using a TDC
  • Slow control
  • Monitor HV status
  • Gas flow
  • Chamber temperature via DCS

2
Cosmic test stand upgrade
  • 2 o 3 chambers in test
  • All chambers with final electronics
  • Acquisition type
  • Based on DAQ release testbeam 2004 with
    Concurrent Technologies CPU
  • We plan to use on chamber adapter and CSM-0
  • Slow control
  • Add environmental parameter (temperature,
    humidity and pressure) monitoring
Write a Comment
User Comments (0)
About PowerShow.com