Plans for the 2004 CSC Beam Test - PowerPoint PPT Presentation

About This Presentation
Title:

Plans for the 2004 CSC Beam Test

Description:

Plans for the 2004 CSC Beam Test. Darin Acosta, Jay Roberts. 16 March 2004. CMS Week ... Use fully functional XDAQ-based event builder and run control ... – PowerPoint PPT presentation

Number of Views:72
Avg rating:3.0/5.0
Slides: 15
Provided by: darina6
Learn more at: http://www.phys.ufl.edu
Category:
Tags: csc | beam | jay | plans | test

less

Transcript and Presenter's Notes

Title: Plans for the 2004 CSC Beam Test


1
Plans for the 2004 CSC Beam Test
  • Darin Acosta, Jay Roberts

2
Beam Test Goals
Shown at January EMU meeting
  • Base goal
  • Set up pre-production system and repeat prior
    tests using 25 ns structured beam
  • New CCB design
  • Additional goals
  • Test TMB2004 with RAT
  • Use new DDUDCC (FED) developed by OSU
  • Use fully functional Track-Finder system
    (self-triggering)
  • Use fully functional XDAQ-based event builder and
    run control
  • Use new crate controller developed by OSU
  • Add an ME1/2 chamber in order to have 3-chamber
    test (for SP)
  • Swap ME1/1 in for ME1/2
  • Mount an endcap RPC on ME1/2, connect Link board
    to RAT, record RPC data in TMB
  • Add a small block of iron absorber between
    (15x15x30 cm?) to validate OSCAR/ORCA simulation

3
Test Beam Schedule
4
May/June Beam Test Schedule
  • Two periods
  • Asynchronous beam May 18 ? June 1
  • CSC only at X5A for May 18 ? May 25
  • CSC Tracker at X5A for May 26 ? June 1
  • Synchronous beam June 7 ? 14
  • CSC Tracker at X5A
  • Muon studies with absorber best done during first
    week
  • Well need a stand to move it in and out of beam
  • Integrate new chambers during first period as
    well
  • Electronics tests have priority during second
    period

5
2003 CSC Beam Test _at_ X5A
?/?
Two support stands constructed and available
  • Tested two ME n/2 chambers in June and September
  • Demonstrated successful operation of electronics
    in a synchronous 25 ns beam, including
    synchronous transmission through the optical
    trigger links to the Track-Finder

6
Possible 3-Chamber Configuration
  • ME1/2 ME2/2 ME3/2
  • Adds ME1/2 to previous beam test configuration
  • Requires 1 new stand
  • Could flip ME3/2 with respect to ME2/2 to emulate
    mounting on disks

7
Possible 3-Chamber Configuration
  • ME1/1 ME3/2 ME4/2
  • Adds ME1/1 to previous beam test configuration
  • Requires 1 new stand
  • Could run with ME1/2 as well for 4-chamber
    configuration?

8
Chamber Proposal
  • Run with ME 1/1 ME 1/2 2 ? ME n/2
  • Uses existing stands for two 10? chambers
  • Assemble one new stand for ME 1/1 and one for ME
    1/2
  • Stands need wheels for rotation and to roll out
    of beam
  • Ability to change impact angle desirable
  • Explore option of mounting an RPC to ME 1/2 for
    TMB connection
  • Acquire peripheral crate electronics to run at
    least 3 chambers simultaneously
  • Well need spares, so could we do all 4 chambers?
  • Are two peripheral crates possible?
  • Better from the point of view of the Track-Finder
  • Need two MPCs, two VME crate controllers, two 9U
    crates
  • Gas, HV, LV for all 4 chambers (including ME1/1)
  • DAQ system to configure and collect data from all
    4

9
CSC Cosmic Ray Test Facility
  • Currently testing the ME 2/1 ME n/2
    configuration at the UF cosmic-ray test stand
  • Plan to start integration of software/hardware
    for TB2004 during the week of March 29

10
Status of New Electronics
  • New CCB (Rice)
  • Will be ready for testing in Florida by March 29
  • Discrete logic implementation and TTCRq (QPLL)
    support
  • TMB2004 (UCLA)
  • Not yet available, expect 30 or more soon
  • 4 ? TMB2003 will be made compatible with TMB2004
  • Software changes for TMB2004 are expected to be
    small
  • DDUDCC (Ohio State)
  • Layout about completed
  • Produced (tested?) by end of March
  • New VME controller for peripheral crate (Ohio
    State)
  • Also ready by end of March
  • Track-Finder
  • Sector Processor (UF) and Muon Sorter (Rice)
    tested and ready

11
Track-Finder Self-Trigger
  • The Sector Processor has been fully tested since
    last beam test
  • Track-finding is now possible
  • Alignment offsets to wiregroup data will be added
    to emulate muons coming from collision point in
    beam test
  • Full readout of inputs and outputs for tagging
    mode
  • A Level-1 Accept signal will be generated based
    on the presence of a track
  • Goes onto bussed backplane to CCB, then out
    front-panel
  • Can be used to self-trigger the CSC system

12
Slow Control Monitoring
  • Would be desirable to test DCS prototype during
    beam test and monitor some quantities (LV,
    temp,)
  • We ran half-blind last year
  • R.Clare thinks this should be possible
  • Track-Finder will have LCT and L1 Track counters,
    as well as link error counters
  • At the very least, these will be periodically
    read out and stored in a separate file for rate
    measurements
  • We should think about having histograms produced
    in near real-time to judge quality of data

13
Manpower Preparations
  • Institutes contributing electronics or chambers
    must have at least one expert available at CERN
    during tests
  • Chambers should be moved late April or early May
  • CERN FAST site Dubna
  • Florida plans
  • In addition to Levchenko and ISR team, several
    physicists to arrive beginning May 6
  • Engineers arrive before 25 ns run
  • Rice plans
  • Several physicists to arrive beginning early May,
    engineer by 25 ns run
  • Dubna
  • Physicists and technician available
  • Others ?

14
September/October Beam Test?
  • Goals are ambitious for June!
  • Use September test beam cycle to finish anything
    not accomplished in June?
  • Move to H2?
  • Could effectively have a slice test with HCAL,
    ME1/1, and DT
  • We use a similar Run Control and DAQ system
    already
  • ME1/1 wants to participate, but that implies
    already we are involved! (peripheral crate,
    software)
  • Logistics and visa issues?
  • HCAL/DT test goals already oversubscribed?
  • First beam test with DT Track-Finder
  • CSC manpower burn-out?
  • Anyway, this years test beams will be the last
    for several years
Write a Comment
User Comments (0)
About PowerShow.com