Title: Jakarta Floods
1Jakarta Floods
Hongjoo Hahm World Bank JanJaap
Brinkman Deltares - Delft Hydraulics
The World Bank
2Jakarta flood management
- Part 1 The basics - Spatial Planning
- Part 2 The flood of February 2007
- Part 3 No-regret measures
- Part 4 Tide and High tide floods
- Part 5 Water specialist center, short-term
actions - Part 6 Actions and financing structure
The World Bank
3Part 1The basics Spatial planningWe live
in a changing world
The World Bank
4Total urban area (java-bali spatial plan) 2000
- 2025
5Total urban area (java-bali spatial plan) 2000
- 2025
6It is really happening Landuse, Jabodetabek
1992
2002
7It is really happening Urban area, G.
Pangrango 1992 - 2001
The World Bank
8Slow runoff Non-Urban
Land-use Rainfall runoff (Katulampa)
0.9
m3/s
0
400
Fast runoff Urban
m3/s
0
The World Bank
9Part 2Flood February 2007Hydrology
The World Bank
10Daily rainfall Feb 2
Feb 1 0700 Feb 2 0700
The World Bank
11Daily rainfall Feb 4
Feb 3 0700 Feb 4 0700
The World Bank
12Inflow Ciliwung Febr 2007Katu Lampa - Manggarai
17
16
15
14
13
12
10
11
9
8
7
6
6
5
4
3
2
1
Katu Lampa
The World Bank
13Flood February 2007Hydraulics Flood extent
- Unique
- Complete upstream-downstream flood modelling
framework now available for all major drainage
including all 13 rivers
The World Bank
14The World Bank
15The World Bank
16The World Bank
17West Banjir canal
18Part 3No-regret ST MeasuresRehabilitationRes
tore original-available design capacity-Dredging
-Dike improvement
The World Bank
191. Confirmation of Scope of Works
C River Embankment Rehabilitation
West Banjir Canal Longitudinal Section
The World Bank
1 August 2007
201. Confirmation of Scope of Works
C River Embankment Rehabilitation
Cengkareng Floodway Longitudinal Section
The World Bank
1 August 2007
211. Scope of Works
A Urgent Maintenance Dredging
22West banjir canaldesign
23No-regret ST MeasuresEast-Banjir Canal
The World Bank
24Cakung
WBC
EBC
Manggarai
- Stepwise approach
- Cipinang-Sunter-Buaran-Cakung
- (With increased Cipinang-Sunter capacity)
- Finish EBC-NE stretch
- Optimize Manggarai gate
- Connect with Ciliwung
Sunter
Cipinang
Ciliwung
25Increase capacity
26Increase capacity
27No-regret ST Measures EBC-CAK-CIL-Manggarai
Simulation 2007
The World Bank
28EBC-CAK-CIL-Manggarai
29(No Transcript)
30Part 4Tidal analysisHigh Tide floods
The World Bank
31Animation of tide in South China Sea
32Spring tide analysis
Astronomic tide
- Prediction based on analysed tidal constituents
Tanjung Priok - Only spring tides are plotted
- Upper plot 18.6 year cycle caused by eliptical
orbit moon - Lower plot semi-annual cycle presumably caused
by interaction diurnal and semi-diurnal
spring-neap cycle
Sea level anomaly
33Flood event June 2007
flooding reported at June 14, 10.00 pm
February 2007, not exceptional
- Increase in water level due to MSLA
- Spring tide (at semi-annual high)
The World Bank
34Future high spring tides
Next semi-annual high spring tide October 29,
November 26, December 24 -2007, January 21
Following semi-annual high spring tide June 4,
2008 ?Month with the highest average MSLA!
The World Bank
35November 26, 2007
36Subsidence
The World Bank
371980
Land-use change
2003
The World Bank
38Pluit 1989, 2007, 2025(Positive view)
Nov 1989
Nov 2007
Nov 2025
Pasar Ikan cm
Nov 26, 2007
Climate change Sea level rise
Critical level 2007
Oct 29, 2007
subsidence
40-60 cm
subsidence
40-60 cm
The World Bank
39Pluit 1989, 2007, 2025(Positive view)
Nov 1989
Nov 2007
Nov 2025
Pasar Ikan cm
Nov 26, 2007
Climate change Sea level rise
Sea level Nov 26
Oct 29, 2007
Critical level 2007
18.6 year cycle
subsidence
2025 80-100 cm increase
40-60 cm
subsidence
40-60 cm
The World Bank
40High tide floods 2007 Signs of a sinking
Jakarta
The World Bank
41Jadebotabek Water Resources Management Study
(JWRMS,1994)
The World Bank
42Part 5Strong knowledge baseShort-term
action
The World Bank
43Flood Hazard Mapping
- Still a lot of confusion!!
- Who is right?
- Who is going to solve this?
- Who dares to make decision?
- One storey from specialists required!
- Water knowledge center for DKI - Jabodetabek
The World Bank
44Part 5Actions and Financing mechanism
The World Bank
45ACTION PLAN
- Short Term
- Dredging / East Banjir Canal / Manggarai Gate
- Stop Ground Water Extraction (industrial)
- Early Warning System
- Strict Building Codes
The World Bank
46ACTION PLAN
- Medium Term
- Bulk Water Supply
- Stop Ground Water Extraction (household)
- Solid Waste Management
- Low Income Housing / Slum Improvement
The World Bank
47ACTION PLAN
- Long Term
- Water Quality
- Water Retention Basin / Catchment Area / Sea
Defense - Land Use and Spatial Planning
The World Bank
48Jakarta Floods
- Hongjoo Hahm
- World Bank
- JanJaap Brinkman
- Deltares Delft Hdraulics
Thank you!