Title: ASPROVA


1
ASPROVA
  • DEREK FRYFOGLE
  • CURTIS LANE
  • TONY LOVELL
  • TOM ROGERS
  • MIKE SIMENC

2
Data Entry B.O.M.
  • Data entry is in the form of a B.O.M. pick list
    of parts needed
  • Use existing B.O.M. or create new products by
    adding, deleting, copying, or recreating new
    materials
  • Use the chart to edit data from the item table,
    parts table, and resource capacity table.

3
Scheduling Parameters
  • Designate various dispatching rules
  • Lot size
  • EDD
  • FIFO
  • Choose a weighted scale to assign importance to
    each job
  • Resource priorities
  • Load leveling
  • Optimization functions

4
Scheduling Parameters
  • Designate finite/infinite capacity
  • Direction of scheduling around the bottleneck
  • Forward loaded
  • Backward loaded
  • Middle loaded
  • Ability to install Poke-Yoke instructions in
    case of job delays

5
Setup Constraints
  • Creates changeover sensitive schedule
  • According to Production
  • According Man Power
  • Parallel machines
  • Selects what jobs can be run on machines in
    parallel
  • Utilizing Man Power in parallel

6
Material Availability
  • Quick representation of on-hand inventory levels
  • Calculates the feasibility of current jobs being
    scheduled
  • Maintains a safety stock and minimum inventory
    level

7
Resources Available
  • Tracks all tangible and intangible resources
    being consumed in production
  • Humans
  • Machines
  • Tools/Electric Power
  • Quantifies all resources being expended on a
    standardized scale
  • Calculates feasibility of jobs being scheduled

8
Inventory Graph
  • Run Chart to display
  • Production and Consumption
  • Shipping and Receiving
  • Actual and Safety Stock inventory levels
  • Monitoring inventory levels
  • Supermarket
  • WIP at each station
  • Finished goods inventory

9
Production Monitoring
  • Gantt Chart displays
  • Jobs on each resource
  • Processing time
  • Due date
  • Expediting Jobs
  • Drag and drop
  • Shifts jobs to adjust to constraints

10
Production Monitoring
  • Lot by lot progress
  • Job cycle time
  • Resources used
  • Takt time remaining
  • Late jobs
  • Increase production
  • Modify start time

11
Production Monitoring
  • Load Leveling Chart
  • Time period
  • Resource groups
  • Job orders
  • Production according to the level schedule
  • Shortages
  • Overages
  • Overtime necessities

12
Production Monitoring
  • Lead Time Histogram
  • Distribution of waiting times for jobs in the
    system
  • Takt time according to customer demand
  • Visual display of what products are causing delays

13
Performance Measures
  • Tardiness Chart
  • Alerts of jobs scheduled to be completed late
  • Drag and Drop to reschedule
  • Recalculates schedule

14
Performance Measures
  • Lateness Histogram
  • Lots completed early or late according to due
    date
  • Waiting Histogram
  • Distribution of lots waiting in system
  • According to item produced or the resource used

15
Applications To Dynalab
  • Scheduling
  • Assign weighted priority to product according to
  • P Q R analysis
  • Finite capacity cap on product pushed into system
  • Reduce WIP at SMT, Slide Line, AOI, and Coating
  • Middle loaded scheduling around shifting
    bottlenecks
  • Daily observation of bottleneck process

16
Applications To Dynalab
  • Setup Constraints
  • Allows similar board scheduling on SMT
  • Reduce setup time on parts prep area
  • Allocate proper man power at the correct time
  • Material/Resource Availability
  • Greater understanding of inventory on-hand
  • Rapid response reordering system from suppliers

17
Applications To Dynalab
  • Production Monitoring
  • Lot Gantt Chart allows the tracking of smaller
    batch size process to reduce WIP
  • Load Level Chart shows min and max levels of
    production that should be performed daily
  • Lead Time Histogram locate the biggest
    bottleneck area buffer to reduce WIP

18
Applications To Dynalab
  • Tardiness Chart
  • Rapidly locate what jobs need to be expedited
  • Use as a metric for production improvement
  • Lateness and Waiting Histogram
  • Locate what areas create the largest queue
  • Jobs are delayed in the system
  • Create SPC charts to define performance measures
    and customer satisfaction

19
Questions
  • Contact Information
  • Tony Lovell
  • Lovell.28_at_osu.edu
  • Derek Fryfogle
  • Fryfogle.1_at_osu.edu
  • Tom Rogers
  • Rogers.382_at_osu.edu
  • Mike Simenc
  • Simenc.3_at_osu.edu
  • Curtis Lane
  • Lane.175_at_osu.edu