ADWEC Electricity Water Demand Forecast 2006 -
2020
Mr Keith Miller Head of Planning Studies
Department
Abu Dhabi Water and Electricity Company(ADWEC)
MEED 3rd Middle East Power and Desalination12th
13th March 2006Hilton Hotel, Abu Dhabi, UAE
Telephone 971 (2) 694 3816 Fax 971 (2)
642 5773keithmiller_at_adwec.ae
www.adwec.ae
2
Presentation Overview
  • Purpose of presentation
  • Present ADWECs latest demand forecasts
    Examine the impact of the new Mega Projects on
    the electricity and water demand forecasts.
  • Outline new IWPP capacity requirements
  • The new Mega Projects will create more IWPP
    projects enhance Privatisation.
  • All of the material contained in the presentation
    is new, none of
  • it has been released outside of ADWEC / ADWEA
    before.

3
ADWEC and Law Number 2 of 1998
  • ADWEC is the single buyer and seller of
    electricity and water.
  • ADWEC is responsible for
  • Electricity Water Demand Forecasting.
  • Electricity Water Capacity Planning.
  • ADWECs legal duties are fulfilled via
  • Annual Electricity Water System Demand
    Forecast.
  • Annual Statement of Future Capacity Requirements.

4
Article 30 of Law Number 2 of 1998
  • Requires ADWEC to
  • ensure that, at all times, all reasonable
    demands for water and electricity in the Emirate
    are satisfied.
  • To satisfy Law Number 2s requirements ADWEC
    preparesannual forecasts of electricity and
    water demand.
  • ADWECs Demand Forecasts are used to prepare
  • ADWEC Statement of Future Capacity Requirements
  • TRANSCO 5 Year Planning Statement
  • Bulk Supply Tariff, ADWEA Budget and Other
    Planning.

5
Demand Forecasting Process
Transmission Code Procedure
Distribution Companies (AADC ADDC)submits
Demand Forecast to TRANSCO / ADWEC (week 24)
TRANSCO submits Transmission Losses Forecast to
ADWEC(week 28)
ADWEC independently assesses submitted data and
prepares System Demand Forecasts (week 48)
ADWEC Statement of Future Capacity Requirements
TRANSCO 5 Year Planning Statement
BST, Budget and Other Planning
6
ADWEC Electricity and Water Demand Forecasting
Regions
Abu Dhabi Region
Al Ain Region
Western Region
The sum of regional peaks is not equal to the
system peak because of timing differences.
7
Recent Developments
  • Changes in land ownership laws during 2005
  • Releasing of surplus oil revenues for major
    infrastructure developments and mega projects.
  • Result Development Boom

Development Boom will require significant
quantities of extra electricity and water
capacity over and above the normal developments
assumed in past ADWEC demand forecasts.
8
New Projects in Abu Dhabi
Sadiyat Island
AD Tourist Club
Mina Zayed
Central Market
Break Water
Massnoua Island
Fish Market
Abraj
Airport
Al Raha Beach
Al Reem Island
Plot 4
Khalidiya Complex
Al Raha Gardens
Airport Site
Mangrove Park
Plot C1 in Z9
(200 Villas) P3ABetween Bridges
256 Buildings Mohd Bin Zayed City
ICAD
9
Major Changes to Demand Forecasts
  • Inclusion of Mega Demand Projects - Al Raha
    Beach
  • - Al Raha Gardens
  • - Mina Zayed Port
  • - Al Reem Island
  • - Industrial City of Abu Dhabi extension
  • - Sadiyat Island
  • - etc
  • Al Ain Water Demand inclusion of new information
    - Private Department - New villas -
    Consumption rates etc
  • Extension of demand forecast horizon from 2015
    to 2020
  • Development of 208 locality Water Demand Model.

10
Uncertainties
  • ADWEC has developed three electricity and water
    demand forecasts
  • High Forecast
  • Base / Most Likely Forecast
  • Low Forecast
  • Uncertainties remain however, for example
  • Timing / size of known Mega Projects
  • Number of new expatriates living in mega
    projects
  • Unannounced new Mega Projects timing / size (e.g.
    Lulu Island)
  • ALDAR has 33 unannounced projects
  • HCSEZs Special Economic Zones plans and worker
    cities.

11
ADWEC Electricity Demand Forecasts(Mega Projects
Assumptions)
1. High Demand Forecast 33.25 Demand /
Diversity Factor (post District
Cooling) Developers Time Schedules Potential
Population Substitution from Existing Population
5 Maximum Annual Mega Projects Population
from Existing Population 10 2. Base Demand
Forecast 28.5 Demand / Diversity Factor (post
District Cooling) Developers Time Schedule 1
Year Delay Potential Population Substitution
from Existing Population 16 Maximum Annual
Mega Projects Population from Existing Population
20 3. Low Demand Forecast 23.125 Demand /
Diversity Factor Developers Time Schedule 2
Year Delay Potential Population Substitution
from Existing Population 20 Maximum Annual
Mega Projects Population from Existing Population
30
12
Unannounced New Projects
  • Since ADWEC Demand Forecast was finalised some
    further
  • demand projects have been proposed
  • 239 MW of a definite new project in 2009.
  • 1500 MW of possible new projects from 2010/11
    onwards.
  • Sorouh Lulu Island approved by UAE President
    6/3/2006
  • (luxury residential, leisure, hotels, commercial
    cultural)
  • HCSEZs Special Economic Zones plans and worker
    cities.
  • ALDAR has 33 unannounced projects.

13
Developers Connected Load Data (MW)
Mega Projects Only
  • Above Connected Load data are the Developers
    Estimates not ADWECs.
  • Developers Project date estimates are invariably
    optimistic, actual timing is likely to be delayed
    by 1 2 years, for example.
  • Peak Demand will likely lag Connected Load
    because of lag associated with moving in etc.
  • Relationship between Peak Demand and Connected
    Load depends on Demand Diversity Factors.
  • ADWEC has used District Cooling adjusted Demand /
    Diversity Factors of 33 (High), 28.5 (Base) and
    23 (Low).

14
Base Electricity Demand Forecast
2005 System Peak 4455 MW
Mega Projects (MW)
System Peak Demand Forecast (MW)
15
ADWEC Electricity Demand Forecast 2006 - 2020
16
Electricity Peak Demand Forecast
17
Electricity Peak Demand Forecast
18
Electricity Peak Demand Forecast
19
Electricity Peak Demand Forecast
20
Electricity Peak Demand Forecast
21
ADWEC Water Demand Forecast 2006 - 2020
22
Water Peak Demand Forecast
23
Water Peak Demand Forecast
24
Water Peak Demand Forecast
25
Water Peak Demand Forecast
26
ADWEC Required Capacity Forecast 2006 - 2020
27
Electricity Capacity v Demand
28
Water Capacity v Demand
29
Conclusions
  • Mega Projects have significantly increased
    demand.
  • Electricity demand has been shifted 5 years
    forwards.
  • High demand creates more IWPP opportunities for
    investors.
  • Additional IWPP capacity will be required in
    2009 / 2010.
  • Higher IWPP capacity requirements will aid
    privatisation.
  • Demand / capacity requirements beyond 2012 are
    uncertain, ADWEC will update its forecasts at
    the end of 2006 when more information becomes
    available.

30
THANK YOU
31
Presentation Outline
  • Purpose
  • ADWEC
  • Demand Forecasting Process
  • Recent Developments
  • Uncertainties
  • Developers data
  • Electricity Demand Forecast
  • Water Demand Forecast
  • Capacity Forecast
  • Conclusions
Write a Comment
User Comments (0)
About PowerShow.com