Description:

Boeing has taken responsibility for leading development of an ... WD Review. CD Ballot. Cosner. Things to Watch. Need to keep working on international support ... – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 19
Provided by: rayco4
Learn more at: https://step.nasa.gov
Category:
Tags: dynamics | fluid | status | wd

less

Transcript and Presenter's Notes

Title: Status of Fluid Dynamics AP


1
Status of Fluid Dynamics AP
  • January 17, 2001

2
Background
  • Boeing has taken responsibility for leading
    development of an ISO-STEP standard for archive
    and exchange of digital data in fluid dynamics
  • Initial Boeing decision taken in February 1998
  • Briefing to SC4/WG3 at their meeting in January
    1999
  • This effort is being led within Boeing by Ray
    Cosner
  • This effort is based on the existing CGNS
    standard for CFD data.

3
Background and Related Activities
  • CGNS was developed as a CFD data storage and
    exchange standard by NASA, Boeing, and (then)
    McDonnell Douglas
  • CGNS CFD Generalized Notation System
  • Work was performed 1994-99, largely funded by
    NASA
  • The CGNS Steering Committee was established to
    coordinate the further development of this
    standard.
  • CGNS is gaining support
  • Commercial vendors have committed to support
    Fluent, Adapco, Numeca, ICEM-CFD, Intelligent
    Light, Pointwise
  • Major aerospace organizations are participating
    Boeing, Rolls Royce (UK, US, GE), British
    Aerospace, USAF, NASA, UTRC
  • CGNS users in every ISO SC4/WG3/T9 P-member
    country
  • CGNS Steering Committee now operates as a
    subcommittee of the American Institute of
    Aeronautics and Astronautics (AIAA)

4
Differences between ISO-STEP and CGNS
  • ISO-STEP is based on
  • Strong link to Product Data Management
  • Record of all data sources, persistent links if
    possible.
  • Commonality and re-use of existing data
    structures to maximum extent possible
  • E.g., re-use data structures from AP203
    (geometry), AP209 (finite element analysis), and
    AP232 (technical data exchange)
  • ASCII data exchange
  • We will need to extend ISO-STEP to provide binary
    data exchange as an option

5
CGNS Registered UsersP-Member Countries
6
Strategy
  • Adapt CGNS as the kernel of an ISO standard for
    storage and exchange of digital data in fluid
    dynamics
  • Utilize current CGNS structure and concepts to
    the maximum extent that is practical
  • Use current CGNS user base as core supporters for
    the ISO Fluid Dynamics AP development
  • Utilize a two-stage strategy
  • First Establish an AP for CFD data
  • Build on existing CGNS, which is fairly mature
    for CFD
  • Second Extend the AP to other types of fluid
    dynamics data
  • Wind tunnel, flight test, hydrodynamics, etc.

7
Operating Relationships
ISO Standards Organization
CGNS Steering Committee
Fluid Dynamics Standards Initiative
  • Intellectual content of the CGNS standard (SIDS)
  • ADF libraries
  • Mid-level libraries
  • Map the CGNS content into the ISO process
  • Build international support
  • Integrate the fluid dynamics standard
    requirements with other ISO standards

We will work with on the existing CGNS Steering
Committee, and the users they represent, to build
international consensus for the proposed standard.
8
Scope (AP FD)
  • digital data on structured and unstructured grids
    describing steady or unsteady fluid dynamics
    flowfields
  • data describing the fluid dynamics model
    including grid description, grid
    inter-connectivity
  • boundary conditions, and modeling parameters
  • data from solutions of equation sets commonly
    used in fluid dynamics analysis
  • Navier-Stokes equations, Euler equations, linear
    and nonlinear potential flow equations,
    small-disturbance equations, boundary layer
    equations, and stream function equations
  • single-phase flow of a liquid or a gas
  • laminar flow, transitional flow, turbulent flow
    (direct representation of turbulence, or
    represented by Reynolds-averaged data)
  • incompressible or compressible flow
  • unsteady flow
  • perfect gas, or variable chemical composition
    (equilibrium flow, frozen flow, or finite-rate
    chemical reactions)

9
Scope (AP FD)
  • data regarding the exchange of energy by
    molecular transport including convection and
    conduction
  • rotating flowfields (e.g., turbomachinery)
  • inertial and rotating frames of reference
  • Newtonian transport laws
  • reference to product geometry
  • administrative information necessary to track the
    approval and configuration control of the
    analysis of a product

10
Out of Scope (AP FD)
  • representations of geometry
  • gross flow in networks (e.g., piping and ducting)
  • the use that application programs may make of the
    data
  • the means by which application programs modify
    the data
  • the form in which the data is stored internal to
    an application
  • The validity, accuracy and completeness of the
    data for a particular purpose are determined
    entirely by the applications software

11
Out of Scope for the present
  • NOTE The following are outside the scope of
    this edition of this part of ISO 10303 but are
    expected to be within the scopes of later
    editions of this part
  • two- and three-phase flow
  • free surface flow
  • non-continuum flow (e.g., direct simulation Monte
    Carlo data)
  • data from non-analytical sources (e.g.,
    experimental simulation such as wind tunnel or
    water tank testing, and product test such as
    flight test or sea trials)
  • data regarding the exchange of energy by
    radiation
  • non-Newtonian transport laws
  • electro-magnetic interactions with a fluid
  • Plasmas MHD

12
Existing Documents
  • AP FD
  • Current draft of the AP for Fluid Dynamics
  • IR 5w Numerical Analysis and Support
  • IR 5s Mesh-Based Topology
  • Harmonizes overlap between CFD resources in 5w
    and EACM resources in 5x
  • Defines structured and unstructured meshes
  • Expect to be used by AP-FD (Fluid Dynamics),
    EACM, and Part 209
  • These documents will be restructured to conform
    to ISO objectives for modular standards
  • Draws on material from AP203, AP209, AP232, Part
    21, Part 50, others
  • Five new documents AP2xx, Part 1xx, Part 5a,
    Part 5b, Part 5x

13
Structure of the Fluid Dynamics Standard
EXISTING
AP2xx Fluid Dynamics Data
Part 209 Finite-Element Analysis
Part 203 Geometry
Usage Guide for AP2xx
NEW
Part 1xx CFD Models
Part 5a Mesh-Based Data
Part 5b Numerical Analysis
Part 5x Mesh-Based Topology
Part 50 Mathematical Constructs
Part 21 Clear-Text Encoding
Each of the new parts must be carried
individually through the approval process. The
lower-level parts will lead the way.
Extend to include binary data
14
Major EventsSince June 2000
  • Review draft ISO-STEP standard with CGNS Steering
    Team members (July 6-7, Seattle, WA)
  • General approval of then-current state some
    issues identified
  • Initial draft of standards documentation
    completed (Sept 2000)
  • Work mainly accomplished by Peter Wilson (Boeing
    Seattle)
  • Incomplete, but contains all technical content of
    CGNS SIDS as of August 2000
  • ISO meeting (October 16-20, Charleston, SC)
  • Presentation to Change Management Board
  • Focused on scope, component parts, schedule of
    the Fluid Dynamics AP
  • Technical Workshop (December 11-14, Seattle, WA)
  • Define the structure of the Fluid Dynamics AP
  • Continue defining the organization and content

15
ISO Organization
ISO
. . .
TC 184 Industrial Automation Systems and
Integration
TC 184
. . .
SC4
SC 4 Industrial Data
WG3 Product Modeling
WG4 Qualification Integration
WG2 Parts Library
WG8 Mfg. Mgmt Data
T9 Engrg Analysis
16
STEP Standards Development Life Cycle
Amendments or Technical Changes
6
International Standard
2003-4?
5
Final Draft International Std
4
Draft International Std
3
Committee Draft
June - Dec 2001
Industry Review Draft
Feb June 2001
2
New Work Item
Feb 2001
1
Preliminary Work Item
Nov 1999
17
Current Plans and Schedule
These plans are tentative, as Boeing budgets for
2001 have not been finalized.
2001 Q1
2002 Q1
2001 Q4
2001 Q3
2001 Q2
AP 2xx
Information Rqmts
WD Review
CD Ballot
ARM Validation Rpt
Interpretation
Part 1xx
WD Review
CD Ballot
CD Ballot
Part 5x
Part 5a
WD Review
CD Ballot
Part 5b
WD Review
CD Ballot
18
Things to Watch
  • Need to keep working on international support
  • Need to keep the current CGNS users engaged
  • Work with the CGNS Steering Committee to
    accomplish this

No problems visible that threaten success of this
project.
CGNS and ISO-CGNS documents are available at
http//www.cgns.org