Title: Assumptions


1
Assumptions
  • Availability of troops equip
  • FALD ability
  • Engrs used in supervisory role and use local
    labour force for works
  • SIG will be more cooperative if Force is able to
    prov job creation

2
Situation
  • Selong susceptible to flooding four year cyclical
    high expected in 90 days
  • Inland port
  • UNICEF / OXFAM producing water
  • No long term mil assistance to be expected
  • Quick impact projects already in the area by SRSG
  • No known external mil spt prov to SIG

3
Situation
  • Security problem predominantly criminal in nature
  • Roads generally impassable
  • Power plants down due to lack of equip
  • Hosp has broken down sewerage
  • 200,000 people at risk if flooding comes
  • No law order
  • Crops destroyed due to flooding
  • No water aval
  • Some HA agencies intending to pull out due to
    lawlessness

4
Humanitarian CONOPs
  • Mil requirements predominantly for security
    priority
  • Security, road construction, sewage repair for
    hospital
  • Food, health, shelter, water sanitation prov by
    UN humanitarian agencies and NGOs
  • HA already in place, log pipeline operable
  • Probable future task if flooding arises will be
    assistance in distribution by road and air from
    air and sea ports
  • HA see themselves as the lead agency in this op

5
Mission Tasks
  • Prov safe secure environment allow HA to prov
    spt to locals
  • Be prep to prov mil spt in spt of HA coord as a
    result of flooding in Selong province
  • Be prep to prov engr spt for road construction in
    spt of HA acty
  • Be prep to prov air assets for SAR and reloc
  • Be prep to prov shelter in spt

6
CONOPS
  • Selong HA assistance will be subsidiary to main
    security ops. Provision of secure environment
    will be primary requirement for HA acty
  • Could be primary if FALD unable to prov
    capability IAW your priority need to advise your
    priority of requirements
  • Dealing with Selong province could be good PR for
    remainder of TERPAN as it will show that Force is
    here for the benefit of the people of TERPAN

7
Administration
  • Lack of fol capability in force structure
  • Engr capability limited to Force capability no
    capacity to assist in HA as per their requirement
  • mobility incl smaller river patrol capability
  • FALD may not be able to provide capability to
    UNMIT priority

8
Command Control
  • HA Coordinator will be lead agency
  • Mil elm to be coord by HAC but remain under mil
    comd
  • Security task to be primary mil function in
    Selong with secondary tasks

9
Recommendations
  • HOC
  • overall coord meetings, sectoral (functional)
    coord meetings, sy coord meeting (info sharing)
  • Mil capabilities
  • Force structure does not spt force spt incl
    shelter, mobility incl smaller river patrol
    capability, C2 aspects
  • Priority of requirements
  • Security reduce lawlessness impacts on ROEs
  • Ground Troops
  • River patrol
  • Air tpt, SAR
  • Medical
  • Road construction

10
Recommendations
  • Disengagement requirement of CIVPOL to sustain
    law order
  • Milestones, measures of effectiveness to enable
    run down of mil ops
  • Troops in spt vs OPCON to HA coord, MCDA
    Guidelines prov means nec principles for mil spt