Title: San Antonio Closing Report
1Project IEEE P802.15 Working Group for Wireless
Personal Area Networks (WPANs) Submission Title
San Antonio Closing Report Date Submitted 18
November, 2004 Source Robert Poor Company
Ember Corporation Address 343 Congress Street,
Boston MA USA Voice1 617 951-1231, FAX 1
617 951-0999, E-Mailrpoor_at_ieee.org Re
Contribution for 15-04-0037-00-004b
PAR Abstract TG4b Closing Report Purpose Rep
ort to 802.15 Closing Plenary Meeting, 19
November, 2004 Notice This document has been
prepared to assist the IEEE P802.15. It is
offered as a basis for discussion and is not
binding on the contributing individual(s) or
organization(s). The material in this document is
subject to change in form and content after
further study. The contributor(s) reserve(s) the
right to add, amend or withdraw material
contained herein. Release The contributor
acknowledges and accepts that this contribution
becomes the property of IEEE and may be made
publicly available by P802.15.
2TG4b Scope
- TG4b will define enhancements and corrections
to the existing standard. The revised standard
will be backward compatible with IEEE
P802.15.4-2003. - The considered enhancements shall be limited to
- A method for shared time-base distribution.
- Support for new frequency allocations for Europe,
China, and Japan. - Extension of 2.4GHz derivative modulation
yielding higher data rates for the lower
frequency bands. - Mechanism for communicating the revision level.
- The considered corrections are
- Resolving ambiguities.
- Removing unnecessary complexity, such as making
GTS support optional and eliminating BUSY_RX,
BUSY_TX, and FORCE_TRX_OFF from the PHY
enumerations. - Resolving issues such as long association time
for non-beacon networks, inflexible security use,
adding support for multicast, reducing MAC
overhead and MAC header compression. - Ref IEEE 15-04-0037-00-004b
3TG4b Purpose
- The purpose of this revision is to extend the
market applicability of IEEE 802.15.4-2003 and to
remove ambiguities in the standard.
Implementations of the current approved standard
have revealed potential areas of improvements.
Additional frequency bands are being made
available in various countries that are
attractive for this application space. - Ref IEEE 15-04-0037-00-004b
4Objectives Accomplishments
Discuss, Review, Organize and Edit existing MAC proposals Comment database 15-04-0234-17-004b Resolved 22 out of 24 comments.
Discuss, Review, Organize and Edit existing PHY proposals PHY plan 15-04-0673-00-004b PSSS, COBI both optional sub-GHz PHYs
Discuss, Review, Organize and Edit existing Security proposals Security Comments 15-04-0540-07-004b Adopted 9 of the refinements.
Prepare Task Group motion for draft approval Deferred to Montery.
Prepare Working Group motion for draft approval Deferred to Montery.
Revise Project Plan Updated schedule in 15-04-0237-04-004b
Other Documents Minutes in 15-04-0644-00-004b Version Mechanism 15-04-0668-00-004b Beacon Scheduling 15-04-0667-00-004b