Title: SOCOPSE


1
Source control of priority substances in
Europe Progress WP 4 EU-project within the
sixth framework program
Willy van Tongeren, TNO Brussels 29 August 2007

2
(No Transcript)
3
  • WP 4 Decision support system (DSS) for source
    control of priority substances
  • Objective
  • The objective is to develop a Decision Support
    System (DSS), including supporting tools for
    management of PSs in order to asses the
    effectiveness and (secondary) impacts of various
    measures (technological and management options)
    or combinations of measures and to come to the
    right selection.

4
  • WP 4 Main activities (TNO Partners !!!)
  • Set up a Framework (task 4.1 (,4.7 and 4.8))
  • General Framework (TNO IVL)
  • Program of requirements (4.0) (TNO IVL, all)
  • Develop Web application (IVL TNO)
  • Fill up the step by step plan
  • Input of WP2 (4.2) NILU
  • Input of WP3 (4.4 and 4.5) SOTON,
  • Other input (Several)
  • Add and make applicable additional tool
  • - Models (4.3) (SYKE, IVL)
  • - Methods (TNO, IVL)
  • - Costs (4.6) IVL, TNO)

5
  • WP 5 Results (1)
  • 1. Set up Framework
  • Framework with step by step plan
  • First Draft DSS Handbook, waiting
  • for first comment from partners
  • -Set up Web application (IVL)
  • Site visits

6
  • WP 5 Results (2)
  • 1c. DSS Requirements Site visits
  • Combined with preparation of the cases
  • Meuse 2 Water boards (Dommel, Brabantse Delta)
  • Danube ICPDR
  • Baltic sea planned 12 September (Eva, Jaap,
    Willy), (kind of workshop)
  • Llobregat river to be planned (October)

7
  • WP 5 Results (2)
  • 1c. Site visits (2)
  • General impression/ comment
  • Positive with respect to the project and the DSS
  • What is the added value
  • (existing DSSs and other information )
  • At the moment limited attention to (H)PS,
  • focus at N and P
  • Why these substances ?, becoming phased out !!

8
  • WP 5 Results (2)
  • 1c. Site visits (3)
  • Dommel (Arjan Kolkman Jan Joziasse, Willy van
    Tongeren
  • Good overview of PS, limited problems (Cd, Ni,
    Diuron, TBT)
  • Pesticides often regulated by (inter)national
    policy
  • Lot of PS measures at EU level, EU policy
  • Consultation structure with other stakeholders
  • Cost-effectiveness is not the only criterion
  • WFD-Guider and other instruments
  • Why no sophisticated tool ??

9
  • WP 5 Results (2)
  • 1c. Site visits (4)
  • Danube ICPDR (Igo Liska , Michaela Popovici ,
    , Jaroslav Slobodnik, Eva Brorstrom, Willy van
    Tongeren)
  • Very positive about the set-up of the DSS
  • Links with earlier projects (Moneris, Unido
    (sound technology, models)
  • Also attention asked for non-technological issues
  • Cost of Industrial measures are very important
    but hard to get
  • Attention for risk assessment is asked
  • Overview of Legal framework, both EU and national
  • Set up a training program for users of the DSS
  • Need for indicators of monitoring the effect of
    measures
  • End 2007 new set of data available
  • Depending on the developments more base line
    scenarios are needed.
  • Interested in case study
  • Possible candidates for PAG, travel costs ??.
    Also interested in workshop

10
  • WP 5 Results (2)
  • 2. Fill up the step by step plan
  • Limited input, big deal depending on results WP2
    and 3

11
  • WP 4 Results (3)
  • Add and develop additional tool
  • Models (4.3)
  • Methods TNO
  • Costs (4.6) TNO

12
  • WP4 Planning
  • - Month 12 First version DSS for discussion at
    GA, with SAG ??
  • - Month 15 Additional data available from WP 2
    and WP 3 and additional tools
  • - Month 20 First operational version for
    application in
  • case studies
  • - Month 21-30 Further improvement during case
    studies