CV Experience - PowerPoint PPT Presentation

1 / 3
About This Presentation
Title:

CV Experience

Description:

Southern Loop after Chester Londonderry. Rate Design ... T&D lite var support; new transformer. Southern Loop Next. Dynamic VAR support for reliability ... – PowerPoint PPT presentation

Number of Views:18
Avg rating:3.0/5.0
Slides: 4
Provided by: bruceb52
Category:

less

Transcript and Presenter's Notes

Title: CV Experience


1
CV Experience
  • Alternatives to TD Upgrades

2
TD Alternatives
  • Southern Loop after Chester Londonderry
  • Rate Design
  • Special Contracts
  • Targeted DSM
  • TD lite var support new transformer
  • Southern Loop Next
  • Dynamic VAR support for reliability
  • DR/T (Energy Efficiency/Load Control/Generation)
    for capacity

3
Alternatives Cost/Availability
  • Top Down Analysis (location, location, location
    DSM least-cost)
  • Load Flow
  • DSM (Collaborative Screening Tool)
  • DG (Rough Cost Estimates)
  • Is all available DSM sufficient?
  • If not, add DG
  • Next Steps detailed DR assessments
Write a Comment
User Comments (0)
About PowerShow.com