Title: SPAWAR MODERNIZATION PROGRAM MANAGEMENT INFORMATION SYSTEM


1
SPAWAR MODERNIZATION PROGRAM MANAGEMENT
INFORMATION SYSTEM
  • BOB BUCKLEY
  • SPAWAR 04FA
  • DEPUTY FOR FLEET C4ISR IMPLEMENTATION
  • SPAWAR FMP POLICY PROCESS COORDINATION
  • (619) 524-7290
    BUCKLEYR_at_SPAWAR.NAVY.MIL

2
FMPMIS
APES/ GAITES
NAVAL VESSEL REGISTER
LOGISTICS
SHIP DATA ALT DATA MAINTENANCE DATA AVAILABILITY
DATA EQUIP/MATERIAL DATA ACTIVITY DATA CONTACT
DATA ILS DATA BAM GAMING
SHIP DATA
TYCOM AVAIL DATA
STARS
PROGRAM
EXECUTION
BUDGET DEVELOPMENT/GAMING ESCROW CHANGE ACCOUNTING
GENERAL BOOKKEEPING FUNDING DOCUMENT
GENERATOR OBLIGATION PLAN CONTROL
TRACKING EXPENDITURE TRACKING STARS ACCESS
3
SPAWAR MODERNIZATIONDATABASE
FMPMIS
SPAWAR FMPMIS MODULE
SSC INSTALLATION DATA MANAGEMENT
4
INITIAL CAPABILITIES(PHASE 1) (JUNE 99)
MASTER FMPMIS DB
WORK PLAN
TLS
AFLOAT WORK PLAN
SHORE WORK PLAN
JCF STAT
SAR STAT
LOGISTICS
SID STAT
BESEP STAT
EQUIP DICTIONARY DATA (MANUAL ENTRY)
EQUIP STAT
ILS STAT
TIME LINE SUMMARIES
PROGRAM
ACCESS DATABASE
EXECUTION
5
PHASE ONE STRUCTURE
SHIP_LIB_ SPA
WP
INSTL_STAT_ DESIGN
TLS
INSTL_STAT_ EQUIP
ACTY_LIB_ SPA
SHIP_ASSIGN
ALT_LIB_ SPA
INSTL_STAT_ FUND
INSTL_STAT_ SOFTWARE
INSTL_STAT_ ILS_DELIV
INSTL_STAT_ SITE_SURV
ALT_STAT
ALT_ILS_REQ
INSTL_STAT_ INBRIEF
INSTL_STAT_ SOVT
INSTL_STAT_ MATERIAL
INSTL_STAT_ TRAINING
EQUIP
INSTL_STAT_ WAIVER
INSTL_STAT_ PRODUCTION
INSTL_STAT_ VISIT_REQ
6
NEAR-TERM CAPABILITIES(PHASE 2) (Q1-00)
MASTER FMPMIS DB
FMPMIS SPAWAR MODULE
SSC INSTALL DATA MGMT
AFLOAT WORK PLAN
AFLOAT WORK PLAN
SHORE WORK PLAN
SHORE WORK PLAN
JCF STAT
SAR STAT
JTF MNGMT STATUS
LOGISTICS
LOGISTICS
SID STAT
BESEP STAT
EQUIP DICTIONARY DATA (MANUAL ENTRY)
EQUIP STAT
ILS STAT
TIME LINE SUMMARIES
PROGRAM
PROGRAM
EXECUTION
EXECUTION
7
MID-TERM CAPABILITIES(PHASE 3) (Q2-00)
MASTER FMPMIS DB
FMPMIS SPAWAR MODULE
SSC INSTALL DATA MGMT
SHIP DATA
AFLOAT WORK PLAN
CNO AVAIL DATA
SHORE WORK PLAN
TYCOM AVAIL DATA
JCF STAT
DB LIBRARY DATA
SAR STAT
JTF MNGMT STATUS
LOGISTICS
LOGISTICS
SID STAT
BESEP STAT
EQUIP DICTIONARY DATA (MANUAL ENTRY)
EQUIP STAT
ILS STAT
TIME LINE SUMMARIES
C4ISR BUDGET DEVEL
CNO N6
PROGRAM
PROGRAM
FUNDING DOCUMENTS
EXECUTION
EXECUTION
ACCOUNTING DATA
8
ULTIMATE FUNCTIONALITY(PHASE 4) (FUTURE)
MASTER FMPMIS DB
FMPMIS SPAWAR MODULE
SSC INSTALL DATA MGMT
SHIP DATA
AFLOAT WORK PLAN
CNO AVAIL DATA
SHORE WORK PLAN
TYCOM AVAIL DATA
JCF STAT
DB LIBRARY DATA
SAR STAT
SHIPALT PROGRAMMING
JTF MNGMT STATUS
SID STAT
LOGISTICS
LOGISTICS
ELECTRONIC JCF/SAR
BESEP STAT
EQUIP DICTIONARY DATA
EQUIP STAT
ALT STAT
ILS STAT
EQUIP STAT
TIME LINE SUMMARIES
ILS STAT
COMPL STAT
NON-SPAWAR WORK
C4ISR BUDGET DEVEL
CNO N6
PROGRAM
PROGRAM
FINANCIAL
FUNDING DOCUMENTS
EXECUTION
EXECUTION
ACCOUNTING DATA
9
MODULE REQUIREMENTSGENERAL
  • MUST BE WEB ACCESSIBLE
  • MUST BE COMPATIBLE WITH REHOSTED FMPMIS
  • SELECTED LIBRARY AND AVAILABILITY DATA TO BE
    DRAWN DIRECTLY FROM MAIN SYSTEM
  • EXCEPTING SPECIFIC DATA ELEMENTS SPAWAR DATA WILL
    NOT BE PASSED TO MAIN SYSTEM
  • SPM AND TYCOM ACCESS TO SPAWAR DATA GENERALLY
    LIMITED TO SPECIFIC REPORTS

10
MODULE REQUIREMENTSGENERAL (cont.)
  • SINGLE POINT DATA ENTRY
  • AUTOMATIC DATA BACKUP

11
MODULE REQUIREMENTSSECURITY
  • SYSTEM LEVEL
  • SAME DEGREE OF SYSTEM AND DATA SECURITY IN MODULE
    AS IN MAIN SYSTEM
  • DATA IN MODULE NOT DIRECTLY ACCESSIBLE FROM MAIN
    SYSTEM EXCEPT AS DETERMINED BY SPAWAR
  • DATA
  • CREATE/ READ/ UPDATE/DELETE AUTHORITY FOR
    INDIVIDUAL DATA ELEMENTS OF THE MODULE UNDER
    CONTROL OF AND ADMINISTERED BY SPAWAR

12
MODULE REQUIREMENTSSIMILAR TO MAIN SYSTEM
  • MUST BE ABLE TO STORE DATA ON SHIPS, ALTERATIONS
    AND EQUIPMENT
  • MUST BE ABLE TO PROGRAM ALTS
  • MUST BE ABLE TO GAME AND FORMULATE INSTALLATION
    BUDGETS OVER MULTIPLE FISCAL YEARS
  • MUST BE ABLE TO MANAGE APPROVED INSTALLATION
    FUNDING INCLUDING GENERATION OF ASSOCIATED
    DOCUMENTS
  • STANDARD AND ADHOC REPORTING

13
MODULE REQUIREMENTSDIFFERENT FROM MAIN
SYSTEMALTERATIONS
  • MUST RECOGNIZE VARIOUS C4ISR CONFIGURATION
    ALTERATION TYPES INCLUDING SHIPALTS, TRANSALTS,
    SHORE ACTIVITY ALTS, AIRCRAFT ALTS, VAN ALTS,
    FIELD CHANGES, ENGINEERING CHANGES, SOFTWARE
    CHANGES, ETC.
  • MUST IDENTIFY SPAWAR C4ISR ALTERATIONS TO BE
    ACCOMPLISHED ON SHIPS, SHORE SITES, AIRCRAFT AND
    VANS
  • MUST PROVIDE ELECTRONIC SCCP/SAR
    DEVELOPMENT/TRACKING

14
MODULE REQUIREMENTSDIFFERENT FROM MAIN SYSTEM
ALTERATION APPLICATIONS
  • MUST BE ABLE TO INDICATE ALTERATION REQUIREMENTS
    FOR -
  • FUNCTIONS
  • INDIVIDUAL SHIPS/SITES
  • CLASSES OF SHIPS/SITES
  • TASK GROUPS
  • BATTLE FORCES
  • FLEETS
  • MUST BE ABLE TO INDICATE THESE REQUIREMENTS OVER
    MULTIPLE FISCAL YEARS

15
MODULE REQUIREMENTSDIFFERENT FROM MAIN SYSTEM
AVAILABILITIES AND SCHEDULING
  • MUST BE ABLE TO INDICATE CNO, SPM AND TYCOM
    AVAILABILITIES
  • SCHEDULING FOR ACCOMPLISHMENT OF EVENTS DURING
    TYCOM AVAILS TO BE ENTERED DIRECTLY IN MODULE

16
MODULE REQUIREMENTSDIFFERENT FROM MAIN SYSTEM
HEADQUARTERS EQUIPMENT MANAGEMENT
  • MUST PROVIDE ABILITY FOR PMW MANAGEMENT OF
    EQUIPMENT ACQUISITION DATA
  • MUST PROVIDE ABILITY FOR PMW TO GENERATE
    EQUIPMENT BUDGET MANAGEMENT DOCUMENTATION (P1,
    P2, P3, ETC.) AND NC 50/60 SHEETS
  • MUST BE ABLE TO PROVIDE/TRACK A MATCH OF
    EQUIPMENT ACQUISITION WITH INSTALLATION
    REQUIREMENTS

17
MODULE REQUIREMENTSDIFFERENT FROM MAIN SYSTEM
STATUS TRACKING
  • MUST PROVIDE ABILITY TO TRACK STATUS OF -
  • SHIPS
  • SAR DEVELOPMENT
  • ILS CERTIFICATION
  • DESIGN DEVELOPMENT
  • INSTALLATION CONTROL DRAWINGS
  • PLANNED CONFIGURATION BASELINES
  • SHIP INSTALLATION DRAWINGS
  • INTEGRATED BILLS OF MATERIAL
  • INSTALLATION SPECIFICATION
  • EQUIPMENT AVAILABILITY
  • ALTERATION ACCOMPLISHMENT

18
MODULE REQUIREMENTSDIFFERENT FROM MAIN SYSTEM
REPORTS
  • MUST BE ABLE TO PROVIDE REPORTS FOR -
  • TASK GROUP/BATTLEGROUP MAKE-UP OVER MULTIPLE
    FISCAL YEARS
  • C4ISR ALTERATION COMPLETION STATUS FOR ALL SHIPS
    OF A TASK GROUP/BATTLEGROUP
  • FISCAL YEAR WORK PLANS
  • TIME LINE SUMMARIES