BAROID IDP - PowerPoint PPT Presentation

1 / 113
About This Presentation
Title:

BAROID IDP

Description:

BAROID IDP – PowerPoint PPT presentation

Number of Views:130
Avg rating:3.0/5.0
Slides: 114
Provided by: baroiddril
Category:
Tags: baroid | idp | acog

less

Transcript and Presenter's Notes

Title: BAROID IDP


1
BAROID IDP
2
MYSTERIES OF LIFE
WHAT IS DRILLING FLUID?
3
DRILLING FLUIDS
WATER AND.
4
DRILLING FLUIDS
ADDITIVES ADDED TO MAKE THE WATER WORK FOR
YOU! ADDITIVES THAT SUPPORT THE HOLE OR BREAK
DOWN THE SOIL.
5
SOIL TYPES
  • COARSE SOILS
  • SAND
  • GRAVEL
  • ROCK
  • FINE SOILS
  • CLAY
  • LOAM
  • SILT

6
SOIL TYPES
  • COLLAPSIBLE
  • SAND
  • GRAVEL
  • ROCK
  • COMPACTIBLE
  • CLAY
  • LOAM
  • SILT

7
SOIL TYPES
NEED TO SUPPORT COLLAPSIBLE SOILS
8
SOIL TYPES
NEED TO BREAK DOWN COMPACTIBLE SOILS
9
SOIL TYPES
WHAT SOILS DO YOU HAVE?
10
SOIL TYPES
SIMPLE! DO A COMPRESSION TEST WITH YOUR
HANDS. LOOK AT YOUR POTHOLES !
11
DRILLING FLUIDS
DO YOU NEED DRILLING FLUIDS?
12
DRILLING FLUIDS
YES!
13
DRILLING FLUIDS
DO YOU WANT TO INCREASE PRODUCTION?
14
DRILLING FLUIDS
DO YOU WANT TO REDUCE WEAR ON TOOLING?
15
DRILLING FLUIDS
THEN USING AND UNDERSTANDING MUD MIXES ARE
CRITICAL
16
DRILLING FLUIDS
EVERYDAY!
17
DRILLING FLUIDS
EVERY BORE!
18
DRILLING FLUIDS
NO SOLO AGUA!
19
DRILLING FLUIDS
WHY?
20
DRILLING FLUIDS
EVER LIFTED A SIDEWALK? OR CRACKED ASPHALT?
21
DRILLING FLUIDS
EVER HAD WATER RISE TO THE SURFACE AND BOIL OUT
AT LIP OF CURB GUTTER?
22
DRILLING FLUIDS
EVER SEEN THE CARRIAGE HEAD PULL BACK AFTER YOU
LET GO OF THE CONTROLS?
23
DRILLING FLUIDS
EVER PLAY TUG OF WAR WITH THE CONDUIT YOU ARE
PULLING IN?
24
DRILLING FLUIDS
EVER STICK THE CONDUIT?
25
DRILLING FLUIDS
HAS YOUR CONDUIT BEEN TOUGH TO PROOF OR BLOW
FIBER INTO?
26
DRILLING FLUIDS
EVER HIT A UTILITY?
27
DRILLING FLUIDS
90 OF HITS ARE ON PULLBACK. WHY?
28
DRILLING FLUIDS
DRILL ROD WANTS TO PULL BACK STRAIGHT THROUGH
EASIEST PATH!
29
DRILLING FLUIDS
THIS IS ALL CAUSED BY THE LACK OF THE RIGHT MIX
30
DRILLING FLUIDS
PLUS, THE RIGHT MIX WILL REDUCE THE TRIPS FOR THE
VACUUMS!
31
DRILLING FLUIDS
PLUS, THE RIGHT MIX WILL REDUCE THE FRICTION/GRAB
ON THE DRILL ROD!
32
DRILLING FLUIDS
THE BASIC 5 CHEMICALS IN CALIFORNIA
33
DRILLING FLUIDS
FYI. THERE ARE 60 PLUS CHEMICALS FROM BAROID
ALONE.
34
DRILLING FLUIDS
BOREGEL/QUICK GEL WHY BOREGEL?
35
DRILLING FLUIDS
IN COLLAPSABILE SOILS, SUPPORTS THE BORE HOLE
LIKE TRENCH SHORING
36
DRILLING FLUIDS
BASIC MIX (1) BAG PER 150 GALLONS OF WATER
37
Goal of fluids
SUPPORT STABILIZE BOREHOLE
38
SAND SOIL
39
WATER ON SAND
40
5 SECONDS LATER
41
BORE-GEL ON SAND
42
AFTER 30 SECONDS
43
AFTER 24 HOURS
44
DRILLING FLUIDS
CONDET 1 GALLON PER 100 GALLONS OF WATER
45
DRILLING FLUIDS
KEEPS CUTTINGS OFF TOOLING LIKE DIESEL ON
ASPHALT TOOLS.
46
DRILLING FLUIDS
HELPS KEEP CLAYS FROM RE-FORMING
47
CON-DET
48
DRILLING FLUIDS
POLYMERS POLY-BORE/EZ MUD
49
DRILLING FLUIDS
LUBRICATES CUTTINGS AND PRODUCT
50
DRILLING FLUIDS
BUT CAREFUL, A LITTLE POLYMER GOES A LONG
WAY! (1) CUP/1000 GALLONS
51
Poly Bore 1/2lbs to 2.4 lbs per 100 gallons
52
DRILLING FLUIDS
NO SAG (ONLY ON LONG, LARGE BORES, OR WHERE HEAVY
ROCK)
53
DRILLING FLUIDS
HELPS SUSPENSION INCREASES GEL STRENGTH
54
DRILLING FLUIDS
SODA ASH
55
DRILLING FLUIDS
HELPS CHEMCIALS MIX AND STAY
56
DRILLING FLUIDS
ph DO YOU MEASURE IT? DO YOU KNOW HOW? DO YOU
KNOW WHY?
57
DRILLING FLUIDS
EVER SEE THE MUD MIX SEPARATE IN THE TANK?
58
DRILLING FLUIDS
WHAT DO YOU THINK IT IS DOING IN THE HOLE? UNDER
PRESSURE!
59
DRILLING FLUIDS
DRILLING FLUIDS MIXES (AND STAYS MIXED) BEST WITH
pH OF WATER _at_ 8.0-9.5
60
DRILLING FLUIDS
RECIPES (JUST THE BASICS)
61
(No Transcript)
62
DRILLING FLUIDS
  • CLAY
  • SANDY/ROCKY
  • HARD PAN
  • LOAM

63
DRILLING FLUIDS
QUESTION ALWAYS IS AFFECT TO SURROUNDING SOIL?
64
ANNULAR SPACE
EXCAVATION AFTER 24 HOURS
65
ANNULAR SPACE
EXCAVATION AFTER
7 DAYS
66
ANNULAR SPACE
EXCAVATION AFTER 14 DAYS
67
REAMERS / BITS
PERCEIVED TO BE CUTTING TOOLS
68
REAMERS / BITS
CHOOSE THE RIGHT CUTTING TOOLS
69
REAMERS / BITS
  • SECONDARY RESPONSIBILITY
  • Delivering Drilling Fluids
  • Mixing Drilling Fluids Soil

70
REAMERS / BITS
MIX SOIL WITH DRILLING FLUID TO FORM A FLOWABLE
SLURRY
71
TUFF BIT
72
SAND BIT
73
FLUTED REAMERS
74
BEAVERTAIL
75
KODIAK
76
MX Mixer
77
BITS REAMERS
THERE IS NO UNIVERSAL SOIL
78
BITS REAMERS
THERE IS NO UNIVERSAL DRILLING FLUID MIX
79
BITS REAMERS
THERE IS NO UNIVERSAL BIT OR REAMER
80
VOLUMES
THERE IS NO UNIVERSAL
VOLUME
(GALLONS PER FOOT)
81
VOLUMES
REAMER SIZE ² ? 25.5
GALLONS PER FOOT
(SOIL)
82
VOLUMES

12 REAMER
12 x 12 144 144
? 25 6 GAL/ FT
83
VOLUMES
  • Sample 12 reamer requires
  • 6 gallons per foot x 10 rod 60 gallons
  • (needed per rod)
  • 30 gpm Pump x 2 minutes 60 gallons

Note Most pumps are rated _at_ water viscosity
84
VISCOSITY
VISCOSITY CUP MARSH FUNNEL
85
DRILLING FLUIDS
DO YOU MEASURE?
86
DRILLING FLUIDS
IF YOU DONT MEASURE VIS, THEN HOW DO YOU KNOW
YOU HAVE THE RIGHT MIX?
87
DRILLING FLUIDS
HOW TO MEASURE
88
DRILLING FLUIDS
MAXIMUM VISCOSITY FOR MUD PUMPS?
89
DRILLING FLUIDS
65 VIS MAXIMUM!
90
DRILLING FLUIDS
Over 40 Vis up to 65 Vis
91
DRILLING FLUIDS
IF YOU DONT MEASURE VIS, THEN HOW DO YOU KNOW
YOU ARE NOT EXCEEDING PUMP?
92
DRILLING FLUIDS
IF YOU DONT MEASURE VIS, THEN HOW DO YOU KNOW
YOU HAVE THE RIGHT MIX TO SUPPORT THE HOLE FROM
COLLAPSE?
93
OVERALL VIEW
FACTORS TO DETERMINE HOW MUCH WHEN YOU NEED
CHEMICALS TO ASSIST
94
OVERALL VIEW
  • Distance
  • Diameter
  • Ground
  • Time

95
DRILLING FLUIDS
BEND RADIUS AND MUD MIXES
96
DRILLING FLUIDS
IF YOU DONT USE MUDS, YOU WILL OVERSTEER DRILL
ROD ON PULLBACK!
97
DRILLING FLUIDS
IF YOU DONT USE MUDS, YOU WILL OVER TORQUE
DRILL ROD ON PULLBACK!
98
DRILLING FLUIDS
HOW DO WE BREAK A WIRE? DRILL ROD IS NO DIFFERENT!
99
DRILLING FLUIDS
IF YOU DONT USE MUDS, ESPECIALLY GOING FROM SOFT
TO HARD FORMATIONS YOU WILL OVERSTEER DRILL ROD
ON PULLBACK!
100
CASE HISTORY
MONDAY MORNING
  • CONTRACTOR MAKES PILOT BORE
  • STARTS BACKREAM WITH PRODUCT
  • PULLS IN 70 FEET
  • GETS STUCK
  • HUMPS HIGHWAY
  • SPENDS REST OF DAY EXTRACTING TOOLS

101
CASE HISTORY
Solution
102
CASE HISTORY
START WITH
THE
DRILLING SQUARE

103
THE DRILLING SQUARE
SOIL I.D.
FLUID
VOLUME

FLOW
BITS / REAMERS
104
CASE HISTORY
If you make drilling chemicals work for you,
you will be successful. If you dont, you will
lose money, you will stick bores, you will wear
out tooling. Your choice. Drilling fluids



105
DONT LIKE YOUR WORK TRUCK?
106
Dont Get It Overloaded
107
USE THE PROPER TOOLS
108
DONT LIKE YOUR JOB?
109
ACCEPT HELP
110
DRILLING FLUIDS
Contacts S. Ca. 800.491.9004 Central
800.350.2595 N. Ca. 800.510.6262 www.calditchwitc
h.com
111
DRILLING FLUIDS
DRILLING FLUID FORMULATOR
112
BAROID IDP
CONSTRUCTION APPLICATIONS
113
BAROID IDP
Gary Williams
Office
661-822-8072
Cell
661-345-9301
gary.williams_at_halliburton.com
Write a Comment
User Comments (0)
About PowerShow.com