Maheswaram Mandal, Ranga Reddy District: GIS Asset Management, power availability assessment and los - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

Maheswaram Mandal, Ranga Reddy District: GIS Asset Management, power availability assessment and los

Description:

Assisted in pilot HVDS implementation for 2 transformers ... Separate Transformers for non-agricultural loads ... Reduction in failure rate of transformers ... – PowerPoint PPT presentation

Number of Views:67
Avg rating:3.0/5.0
Slides: 23
Provided by: Sne66
Category:

less

Transcript and Presenter's Notes

Title: Maheswaram Mandal, Ranga Reddy District: GIS Asset Management, power availability assessment and los


1
Maheswaram Mandal, Ranga Reddy District GIS
Asset Management, power availability assessment
and loss reduction options
T. Radha Krishna Reddy , GECE January 21, 2003
2
Objectives
  • To bridge the policy gap between the water and
    energy sectors
  • To provide accurate and current data on
    distribution system
  • To improve the quality and reliability of power
    supply

3
Activities
  • Geographic information system and asset
    management system
  • Pumpset survey
  • Technical loss estiamtion
  • HVDS upgrade
  • Method for technical loss reduction
  • Refurbishment of network

4
Approach
  • Regular (daily) interaction with APCDCL from
    assistant engineer to director technical level
  • Standard software (PowerNet application) utilized
  • Completed and validated GIS asset inventory data
    maps shared with APCDCL field staff
  • Assisted in HVDS project formulation for farmer
    and utility demonstration
  • Assisted in pilot HVDS implementation for 2
    transformers

5
Status Of Existing Electrical Network
  • No of 11kV feeders
    2
  • No of Distribution Transformers 89
  • 11kV line
    52.51km
  • LV line
    154.79km
  • No of Agricultural Pumpsets(8/02) 1203
  • 11kV Voltage Drop
    10.32
  • Energy Loss (Technical)
    16.20
  • Technical and Commercial Losses( total) 33.56

6
Quality of Power Supply
  • No of 11kV feeders
    2
  • No of 11kV feeders with voltage drop with in
    permissible limits 0
  • Total no of LV feeders
    111
  • No of LV feeders with voltage drop with in
    permissible limits 39
  • No of Pumpsets
    1203
  • No of Pumpsets with voltage drop within
    permissible limits 71

7
Existing Voltage Profile at Pumpsets
8
Case Study Sample from both feeders
9
Causes for High Voltage Drop
  • Lower size of Conductor
  • Long LV lines
  • Low Power Factor
  • Unauthorized Customers
  • Un-authorized additional loads by existing
    customers
  • Non Standard Joints in the line, particularly at
    the tension points.

10
Revisiting the Vicious Cycle
11
Impact of Low Voltages
Efficiency of Pumpset falls by 1.5 for 5 drop
in Voltage
12
Works Proposed in the Project
  • High Voltage Distribution System
  • Strengthening of 11kV network
  • Refurbishment of 11kV network

13
Basic Design Parameters of HVDS
  • One transformer for 2 to 4 pumpsets
  • Separate Transformers for non-agricultural loads
  • Maximum length of LV line is 300 meters
  • Independent AB cable for each pumpset direct
    from transformer

14
Advantages of HVDS
  • Technical loss will be reduced due to reduction
    in LV line lengths(I2R)
  • Reduction in Commercial losses since it is
    difficult to tap from AB cable (elimination of
    unauthorized customers and theft)
  • Pumpset efficiency will be improved due to better
    voltages

15
Advantages of HVDS
  • No need to use Voltage stabilizers, which results
    in improvement in power factor
  • Reduction in failure rate of transformers
  • Reliability of supply will be improved since any
    fault in HV system will be immediately known at
    the Substation / Controlling Officer.
  • Voltage fluctuations will be avoided

16
Works proposed in The project
17
Comparison of network After Conversion to HVDS
and optimization
18
Maheswaram Mandal Consumer Benefits
Voltages at customer premises
Unauthorized Pumpsets
19
Study Wise Peak Power loss and Energy Loss Both
Feeders
20
Financial benefits
Total Ag Services recorded 1203, unauthorized
services 508 Total other services recorded
1250
21
Cost Benefit Analysis