mile stone 200 phase. from production start to middle summer 2002 ( L3: W. Beaumont) ... Can have consequences for the mechanics of the cold box ... – PowerPoint PPT presentation

Number of Views:17
Avg rating:3.0/5.0
Slides: 8
Provided by: dirkm4
Category:
Tags: activities | cold | long | module | stone | term | test

less

Transcript and Presenter's Notes

Title: Module Long term test activities


1
Module Long term test activities
University Antwerp CMS tracker L2 L3 meeting,
CERN, 11-12 June 2001
2
List of responsibilities
  • 1. Production tasks
  • Long term test of modules
  • mile stone 200 phase
  • from production start to middle summer 2002
  • ( L3 W. Beaumont)
  • long term petal test
  • from summer 2002 until end of production
    together with IIHE Brussels (P.Vanlaer,
    W.Beaumont, C.Vander Velde)
  • It is not foreseen for the moment to have petal
    long term test and module long term test at the
    same time. With the available man power and
    infrastructure we can handle this if needed.

3
Infrastructures
  • 28 m2 Class 10.000 clean room (September 2001)
    (module testing and storage , diagnosis)
  • Ultra dry air facility 200 l/h for cold
    box(September 2001) Now with nitrogen.

Storage
  • for incoming modules Cupboard.
  • long term storage for tested modulesNot defined
    yet. Reserved 3m2 for this( CHF 2500)

Instrumentation
  • test setup see list.
  • Microscope

4
Long Term Test Setup items
5
Human resources
  • Senior Physicists
  • V. Zhukov (0.5 FTE) 1)data quality checks , data
    base
  • investigation of possible failures
  • Engineers
  • W. Beaumont ( 0.4 FTE) 1)
  • supervision , logistics
  • investigation of possible failures
  • E. de Langhe
  • operation and maintenance of test system
  • Technicians
  • Open position (1 FTE )
  • operation of test station, data logging and
    module handling.
  • 1) Not including general development and
    maintenance of the long term test setup software.

6
Money resources
  • No core money will be requested to complete the
    foreseen module long term setup.

Status test setup and activities
  • Long term module test
  • Setup is running with prototype cold box and
    "alpha" version of the software.
  • Connections to database in advanced phase
  • Finalizing software.
  • Ready to do long term module test for one or two
    module with the existing system when UTRI boards
    available
  • Procurement of standard items before September
    2001 .

7
Concerns
  • No modules available to commissioning the test
    setup. Grounding problems can be a problem. Hope
    experience with the system test setup at CERN
    will give hints how to tackle the problems
  • Designs transportation plates, boxes are not
    frozen in detail. Can have consequences for the
    mechanics of the cold box
  • Delivery of cold box for 10 modules can be
    delayed
  • Control of our CAEN HV system (old controller )