National Bridge Inventory Coding Guide Update - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

National Bridge Inventory Coding Guide Update

Description:

Portland, Maine. 2. Current Status. Received over 2000 comments on the October 2006 version ... Must be necessary to operate federal bridge programs (HBP, NBIP) ... – PowerPoint PPT presentation

Number of Views:25
Avg rating:3.0/5.0
Slides: 9
Provided by: steven613
Category:

less

Transcript and Presenter's Notes

Title: National Bridge Inventory Coding Guide Update


1
National Bridge InventoryCoding Guide Update
  • Pontis Users Group Meeting
  • September 5-6, 2007
  • Portland, Maine

2
Current Status
  • Received over 2000 comments on the October 2006
    version
  • FHWA team is
  • Reviewing comments and updating document
    concurrently
  • Preparing responses to all comments
  • Scaling back proposed changes

3
Change Justification
  • Must be necessary to operate federal bridge
    programs (HBP, NBIP)
  • Must be necessary to ensure bridge safety
  • Must be necessary for FHWAs stewardship and
    oversight responsibilities
  • Must be necessary to be responsive to Congress

4
Summary of Changes
  • Delete substructure material/design items
  • Delete charts and quantitative descriptions from
    deck, super, sub and culvert condition ratings
  • Formatsimilar item field size as 95 Guide
  • Keep load rating date
  • Keep Scour Plan of Action item

5
Summary of Changes
  • Use rating factor for Structural Evaluation
  • Use 0-9 scale for appraisal items calculated by
    Edit/Update
  • Refer to BIRM to minimize commentary
  • Use mm/dd/yyyy format for Inspection dates
  • Use 1995 Guide criteria for under records

6
Summary of Changes
  • Keep Deck Geometry item separated
  • Deck roadway width item
  • Deck overclearance item
  • Keep Underclearance item separated
  • Roadway Hz UndrClr item
  • Railroad Hz Undrclr item
  • Roadway Vt. UndrClr item
  • Railroad Vt. UndrClr item

7
FHWA Plan of Action
  • Complete proposed Specifications
  • Complete responses to comments on the October
    2006 version
  • Continue evaluation of changes
  • Present document to AASHTO T-18 September 2007
  • Develop an implementation strategy and timeline
    with T-18 (On hold)

8
Questions
  • Larry ODonnell
  • (708) 283-3502
  • larry.odonnell_at_fhwa.dot.gov
  • (lodonnell_at_fhwa.dot.gov)
Write a Comment
User Comments (0)
About PowerShow.com