Title: Subdetector production status


1
Sub-detector production status
  • Yuan-Tzu Ting/Yue-Lan Lin/Frank Yang
  • CSIST
  • Jan 11, 2006

2
TTPD QM2 production status
  • All the board level function test have been
    finished last March
  • Crate level function test/ESS/EMI has been
    performed by Daniel from U.of Geneva, Philipp and
    Lucio from INFN Perugia from last July 4 to July
    22
  • TVT is under-arrangement.

3
T-crate FM/FS status
  • 20 TBS(S9068) and 40 TPSFE(S9067) PCB
    manufacturing will be finished at the end of this
    February.
  • CSIST has received the production documentation
    from TDR2 designer for 108 pieces PCB and PCA.
  • No any further production message from TBP
    (lower and upper T-crate) and JINFV2 designer.

4
UUPD QM2 production status
  • All the board level function test have been
    finished last Nov.
  • Florian, Mike and Andy from U. of karlsruhe come
    to CSIST to perform the QM2 Crate level function
    test , ESS/EMI from last mid. Aug. to Sep.2
  • TVT is under-arrangement.

5
UGSCM production status
  • Six Flash memory chips have been installed on all
    Six USCM last Nov.14
  • Two OTP chips have been soldered on two
    USCM(QM1,QM2) last Nov.21
  • Two adapter boards and two USCM(QM1,QM2) have
    been assembled on two UGSCM , Coating ESS
    process has been finished last Dec.30

6
UGSCM
7
ECAL QM1 production status
  • EIB_A_T,EIB_A_NT,EIB_B_T,EIB_B_NT PCA
    production has been finished last Oct.7.
  • EIB_A_T,EIB_A_NT,EIB_B_T,EIB_B_NT board level
    function test has been finished by Sylvie, Glenn
    and Nadia in CSIST from last Oct.11 to 14.

8
ECAL QM1 board level function test at CSIST
9
DC/DC converter FM/FS production
  • 9 S9051, 10 S9054, 11 S9056 PCA have been
    finished.
  • 4 S9051, 16 S9053,4 S9053U,20 S9055, 11 S9057E
    PCB have been finished, the PCA will be finished
    at the end of this Feb.
  • 10 S9048, 27 S9051, 12 S9053, 9 S9057 PCB will be
    finished at the end of this Feb, the
  • PCA will be finished at the end of this March.

10
DC/DC converter FM/FS production (Cont.)
  • The FM/FS production documentation are all
    received on last July 6
  • CSIST has finished all different types PCA
    engineering development( Stencil file
    programming, pick place file programming, PCA
    engineering drawing )
  • CSIST have received all missing components.

11
TOF QM2 production status
  • New SDR2 Gerber file according to the layout rule
    has been received on Sep.TEM in CSIST.
  • After reviewing the Layout, CSIST people have
    modified the Gerber file and sent to the designer
    to check.We are waiting the go signal from
    Guido to do the PCB production.
  • No any other Gerber file received till now.

12
TOF QM2 production status
  • SDR2,SPT2,SFET2,SFEA2,SBP PCA will be ready in
    three months after receiving the Gerber files.
  • S crate fasteners already go for production

13
Conclusions
  • The QM2 production doc. for TOF needs to be
    delivered to CSIST gradually from now on.
  • The QM2 production doc. for TTCE needs to be
    delivered to CSIST gradually from now on.
  • The FM/FS production doc. for UUPD needs to be
    delivered to CSIST gradually from now on.
  • The FM/FS production doc. for TBP/JINFV2TPD
    needs to be delivered to CSIST gradually from now
    on.
  • UUPD,TTPD TVT schedule and test location need
    to be decided this TEM.