Title: Fiber Allocations Preliminary Design Review
1Fiber Allocations Preliminary Design Review
2Fiber Allocations
IF 120 Gbps WDM 1
LO - 2.048GHz, 512 MHz, 128 MHz 1
MCB Ethernet 2
Battery Back-up communication 1
Telephone Digital System 2
Total Lit Fibers per Antenna 7
12 Fibers Installed per Pad, 5 spares
3Fiber Routing
4Burial Depth
- LO system requires phase stability.
- Stability determined by fiber thermal expansion
- Expansion determined by ground temperature
- Limit fiber expansion to ______ LO cycles / day.
- Highest transmitted LO frequency is 2GHz.
- Wavelength of 2 GHz in fiber is 10 cm.
- Limit fiber expansion to _____cm / day
5Fiber Thermal Expansion
- Average annual temp. variation at 1 m 17.4 C.
- Coefficient of expansion of fiber 18 x 10-7
/C. - DL (18 x 10-7 /C)(17.4 C)(22 km)
- 68 cm annually
- Average fiber expansion is estimated to be less
than the equivalent of 7 cycles over 180 days.
6LO Characteristics_at_ 2.048 GHz
7Fiber InstallationPreliminary Design Review
8Cable Wrap
9IF Signal Path
10Cable Cross Section
11Basic Cabling Plan
C5
Splice Box
C6
12 Fibers ea. antenna
60 Fibers
710 m
C7
C8
B5
C9
B6
60 Fibers
2.8 km
B7
B8
B9
A5
A6
60 Fibers
8.1 km
A7
A8
A9
12Fiber Cable Plan
- 13 Trunk Cables from CB out to the Array.
- 60, 72 and 96 fiber cables.
- Triple Jacket/ Double Armor.
- 12-fiber cable from trunks to antennas.
- 17 splice locations
- All standard single-mode fiber.
13EVLA Fiber Cable Plan
14Fiber Acceptance
- Every fiber to be tested at delivery.
- Installation Specification.
- Every fiber to be tested after installation.
- Acceptance specification to be developed.
15Splice Locations
West Arm North Arm East Arm
DW6 DN2 DW1
DW7 CN5 DE4
CW7 BN6 CE5
AW5 AN5 BE5
BetweenAW5/AW9 BetweenAN5/AN9 AE5
Between AE5/AE9
16Splice Box
17Antenna Pad Enclosure
18Antenna Junction Box
19Cable Grounding
- Bonded to ground at every connection.
- Bonded with 6 AWG copper, minimum.
- Bonded to antenna ground, control building
ground, or a ground rod.
20Cable Burial Plan
- Trenched by NRAO G. Stanzione
- Spliced and terminated by NRAO R. Latasa
- Buried one meter depth, minimum.
- Cable identified with marker tape.
- Splices identified with a concrete monument.
- Armor grounded at each splice or termination.
21Estimated Cable Cost
Double Armor Cable
12 Fiber Cable 0.68 / ft
60 Fiber Cable 1.98 / ft
72 Fiber Cable 2.22 / ft
96 Fiber Cable 2.60 / ft
22Cable Costs( Excluding Grounding and other
miscellaneous parts )
Double Armor Cable 636,000
Splice Boxes 7,000
Antenna Pad Enclosure 27,000
Control Building MDF ( Term. Closet ) 7,000
Total Cost ( excl. misc. ) 677,000