Fiber Allocations Preliminary Design Review - PowerPoint PPT Presentation

1 / 23
About This Presentation
Title:

Fiber Allocations Preliminary Design Review

Description:

Triple Jacket/ Double Armor. 12-fiber cable from trunks to antennas. 17 splice locations ... 7,000. Splice Boxes $636,000. Double Armor Cable. Next Topic ... – PowerPoint PPT presentation

Number of Views:42
Avg rating:3.0/5.0
Slides: 24
Provided by: donw6
Learn more at: http://www.aoc.nrao.edu
Category:

less

Transcript and Presenter's Notes

Title: Fiber Allocations Preliminary Design Review


1
Fiber Allocations Preliminary Design Review
  • December 5, 2001

2
Fiber Allocations
IF 120 Gbps WDM 1
LO - 2.048GHz, 512 MHz, 128 MHz 1
MCB Ethernet 2
Battery Back-up communication 1
Telephone Digital System 2
Total Lit Fibers per Antenna 7
12 Fibers Installed per Pad, 5 spares
3
Fiber Routing
4
Burial Depth
  • LO system requires phase stability.
  • Stability determined by fiber thermal expansion
  • Expansion determined by ground temperature
  • Limit fiber expansion to ______ LO cycles / day.
  • Highest transmitted LO frequency is 2GHz.
  • Wavelength of 2 GHz in fiber is 10 cm.
  • Limit fiber expansion to _____cm / day

5
Fiber Thermal Expansion
  • Average annual temp. variation at 1 m 17.4 C.
  • Coefficient of expansion of fiber 18 x 10-7
    /C.
  • DL (18 x 10-7 /C)(17.4 C)(22 km)
  • 68 cm annually
  • Average fiber expansion is estimated to be less
    than the equivalent of 7 cycles over 180 days.

6
LO Characteristics_at_ 2.048 GHz
7
Fiber InstallationPreliminary Design Review
  • December 5, 2001

8
Cable Wrap
  • Riser Grade Cable

9
IF Signal Path
10
Cable Cross Section
11
Basic Cabling Plan
C5
Splice Box
C6
12 Fibers ea. antenna
60 Fibers
710 m
C7
C8
B5
C9
B6
60 Fibers
2.8 km
B7
B8
B9
A5
A6
60 Fibers
8.1 km
A7
A8
A9
12
Fiber Cable Plan
  • 13 Trunk Cables from CB out to the Array.
  • 60, 72 and 96 fiber cables.
  • Triple Jacket/ Double Armor.
  • 12-fiber cable from trunks to antennas.
  • 17 splice locations
  • All standard single-mode fiber.

13
EVLA Fiber Cable Plan
14
Fiber Acceptance
  • Every fiber to be tested at delivery.
  • Installation Specification.
  • Every fiber to be tested after installation.
  • Acceptance specification to be developed.

15
Splice Locations
West Arm North Arm East Arm
DW6 DN2 DW1
DW7 CN5 DE4
CW7 BN6 CE5
AW5 AN5 BE5
BetweenAW5/AW9 BetweenAN5/AN9 AE5
Between AE5/AE9
16
Splice Box
17
Antenna Pad Enclosure
18
Antenna Junction Box
19
Cable Grounding
  • Bonded to ground at every connection.
  • Bonded with 6 AWG copper, minimum.
  • Bonded to antenna ground, control building
    ground, or a ground rod.

20
Cable Burial Plan
  • Trenched by NRAO G. Stanzione
  • Spliced and terminated by NRAO R. Latasa
  • Buried one meter depth, minimum.
  • Cable identified with marker tape.
  • Splices identified with a concrete monument.
  • Armor grounded at each splice or termination.

21
Estimated Cable Cost
Double Armor Cable
12 Fiber Cable 0.68 / ft
60 Fiber Cable 1.98 / ft
72 Fiber Cable 2.22 / ft
96 Fiber Cable 2.60 / ft
22
Cable Costs( Excluding Grounding and other
miscellaneous parts )
Double Armor Cable 636,000
Splice Boxes 7,000
Antenna Pad Enclosure 27,000
Control Building MDF ( Term. Closet ) 7,000
Total Cost ( excl. misc. ) 677,000