Title: FLIWAS
1FLIWAS
FLood Information and WArning System
the right information at the right place at the
right time to make the right decision
Ludolph Wentholt STOWA
2NOAH Project Partners
Cooperation with
PZH ?
(Redesign) HIS
Delfland
DWW
VIKING
Erftverband
- Ierland
- OPW (Office of Public Works
- DCC (Dublin City Council)
3GOAL
Optimize the exchange of information during
(threatening) high water situations within and
between water management and calamity management
organizations
4Intermezzo 1
5FLIWAS core/base/comfort
- FLIWAS CoreGeneric components (e.g.
communication with databases, internal and
external communication, import provider, plan
module and web mapping) - FLIWAS BaseEnd user functions for German
project region - FLIWAS ComfortFull functionality of FLIWAS
6FLIWAS
FLIWAS Core
7FLIWASTimetable development and implementation
8Web-based system
- No client side installation
- Any PC, Laptop or even palm top
- Internet (or intranet) access needed
- Optimized for
- MS Internet Explorer Version 7
- Mozilla Firefox Version 2
9BASE-FLIWASVisual prototype
- Web-GIS is an important component of BASE-FLIWAS
- Access to arbitrary GIS Layers
- Possibility of importing additional GIS Layers
(e.g. communal GIS Data) - Every user can create points of interest on the
map
10Hydrological Information
- Hydrological information imported from existing
providers - User preferences user gets just relevant
information - Access to water-level information via map or
list
112D-flooding scenario
- 2D-flooding scenarios can be displayed and can be
visualized as a movie - In Baden-Württemberg operational predictions for
flooded areas can be displayed
12Communication
- FLIWAS internal messaging system (messaging,
message confirmation, log file of the
communication during an mission) - Gateway to email receiving and sending
- Forewarding of FLIWAS messages as email oder sms
possible - Interface to FAX (als PDF) possible
-
13Message confirmation
14Organisation and user management
- Organisations contain roles and functions that
a person or organisation has to take.
Functionaries in organisations have specific
rights for using FLIWAS data and applications. - Organsiations may have sub organisations
- Organisational hierarchy can be visualized
15(No Transcript)
16Ressources
- Ressources can be several types of information
- File e.g. Word-Files, PDF-Files, images...
- Article Documents created with FLIWAS. Provides
rich layout facilities. - Location Locations with relevance desaster
management, can be displayed in the map - Contact External contact data
- Depots Adminitration of auxiliaries
17Ressource File e.g. word-files, PDF-files or
images
18Emergency plans
- The core application of FLIWAS All other
applications provide data for the emergency plans.
19Selection of an emergency plan
Emergency plans Each Organisation can create
one or several emergency plan (e.g. a plan for
each each monitored object)
20Actions
Overview of the actions of emergency plan Plan 1
21Evaluation
22Evaluation
Log file of all action during a mission
23Evaluation Status of an emergency plan and its
actions can be shown for any time in the past
24Evaluation Viewing past water level information
25Future of FLIWAS
- After the exercise
- Participation of other waterboards and
Rijkswaterstaatdiensten - Enlarging the project to safety regions,
provinces en communities - Development of additional functionality
- Extra modules functionality for coast and dike
analysis - International cooperation
26Future of FLIWAS
- JONAS Anchor FLIWAS in crisismanagement
- Using FLIWAS at different levels (action,
operational, strategic) - Multidisciplinary exercises
- Attention for improvement communication
government ??public during floods - Prospects for implementation (score-card)
- Development knowledge centre
- River and coast
27Future of FLIWAS
- Attention for evacuation
- Link with other initiatives (Taskforce Flood
Management, national large scale exercise in
November 2008) - Publication scientific and popular
- Fix results for further use by other
organisations - Training material and user guides
28Intermezzo 2
Wenn man die Flut nicht verhindern kann, sollte
man zumindest gut darauf vorbereitet
sein! NOAH! WWW.FLIWAS.EU
29Thank You
Questions?
30(No Transcript)
31Implementation FLIWAS
- Commitment Fliwas Waterboards in the Netherlands
- Dutch Rivers High water in 1993 and 1995
- Development GDH Automatic Calamity Plan for
High Water - Partner in NOAH (international experiences)
- FLIWAS International development
- Working groups for implementation and excercise
32Implementation FLIWAS
- Main functions for Waterboards
- Automatic measurements waterlevel
- Defining actions, linked to waterlevels, for
- Structural works and dike watch
- Organisation
- Communication
- Monitoring actions (watch dog)
33Implementation FLIWAS
- Aims for Waterboards
- High water situation clearly presented in graphs
and maps - Improvement management high water and flood
- Support for maintaining structural works during
high water - Support for communication internal, with partners
and with public - Tool for cooperation and collaboration with
partners (safety regions, provinces, communities,
government)
34Implementation FLIWAS
- Implementation steps
- Projectplan Implementation
- Test Fliwas modules
- Hard- and software operational
- Conversion data into Fliwas
- Training
- Exercise
- Evaluation
35Flood exercise FLIWAS River Maas
When will it be held? Who will participate? Why
will we exercise? What and where? How and with
what? What will be done with the results?
36Flood exercise FLIWAS River Maas
When? Spring 2008
37Flood exercise FLIWAS River Maas
Who? Waterboard Rivierenland Waterboard Roer en
Overmaas Waterboard Aa en Maas Institute for
Inland Water Management and Waste Water
Treatment, Directorate-General for Public Works
and Water Management Rijkswaterstaat Dienst
Limburg Rijkswaterstaat Dienst Zuid-Holland
38Flood exercise FLIWAS River Maas
Why? To get full scale information and warnings
at the right time in and between organisations by
using FLIWAS.
- Information about
- facts (measurements)
- dilemmas
- assistance (emergency measures)
- communication strategie
- predictable actions for structural works, dikes
and organisations
39Flood exercise FLIWAS River Maas
- What and where?
- Action-level,
- operational level
- (and strategic level) in
- Tiel
- Den Bosch
- Sittard
- Lelystad
- Maastricht
- Rotterdam
- Evaluators at every location
- High water on River Maas
40Flood exercise FLIWAS River Maas
-
- To communicate and work following the internal
calamityplans - Not outside, only at the office
- Operational systemtest FLIWAS to use FLIWAS to
gather information, to monitor and share it. - Different phases of alert and alarm
- To make situation reports
How and with what ?
41Flood exercise FLIWAS River Maas
- What will be done with the results?
- Evaluation symposium
- Improving FLIWAS
- Update calamityplans
- Enlarge cooperation
- Preparing following steps