Airborne Programme - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

Airborne Programme

Description:

Experimental 4D Flight Management System (EFMS) Airborne Human Machine ... FREER Flight. AFMS/AATMS. Avenue. 10. Open issues for the future. Data Link Bandwidth ... – PowerPoint PPT presentation

Number of Views:33
Avg rating:3.0/5.0
Slides: 14
Provided by: ebai8
Category:

less

Transcript and Presenter's Notes

Title: Airborne Programme


1
Airborne Programme
  • by
  • E. Bailey, Airborne Project Leader
  • EUROCONTROL

2
Projects
  • Experimental 4D Flight Management System (EFMS)
  • Airborne Human Machine Interface (AHMI)
  • Air/Ground Integration via Data Link

3
EFMS AHMI Functionality
  • EFMS
  • Prediction of 4D trajectories
  • Trajectory negotiation with ATC over data link
  • 4D Guidance
  • Support advanced Airborne HMI
  • AHMI
  • Interactive Navigation Display
  • Graphical editing of trajectories

4
Project History
  • Activities of the Research Establishments
  • Arrival Managers - CENA, DLR
  • 4D Descents - DERA
  • Automated ATC - EEC
  • Conflict Detection - NLR
  • Advanced Cockpit Displays - DERA, NLR
  • GARTEUR Concept
  • Requirement for Experimental 4D FMS
  • Birth of PHARE

5
Difficult points to be resolved1. Generic FMS
AHMI
6
Difficult points to be resolved2. Software
Engineering
  • Aeronautical engineers ? software engineers
  • Dispersed development sites
  • Software development tools
  • Common programming language
  • Need for software integration team
  • Software engineers ? aeronautical engineers

7
Difficult points to be resolved3. Integrated ATM
?
  • Lack of system design
  • Air, Ground and Comms. projects developed
    independently
  • Lack of understanding between players
  • Air, Ground and Comms. developers incognisant of
    each others operational requirements, procedures
    and capabilities

8
Difficult points to be resolved4. Data Link
  • Requirement
  • Flexible, high bandwidth data link
  • Available
  • Rigid data structure and protocols
  • complex data structures for air and ground
    interfaces
  • low bandwidth data link
  • poor performance
  • Essential to minimise the amount of data
    transmitted

9
Success !
  • Demonstrated concept of an Air/Ground Integrated
    ATM system
  • Demonstrated capability of aircraft to predict,
    negotiate and fly 4D trajectories
  • Demonstrated Advanced AHMI concepts
  • Spin-off to other programmes
  • FREER Flight
  • AFMS/AATMS
  • Avenue

10
Open issues for the future
  • Data Link Bandwidth
  • Current applications for D/L require low/medium
    bandwidth
  • Need to define user requirements for the longer
    term
  • Benefits of 4D Navigation ?
  • Time control Air or Ground ?
  • Increased capacity and reduced delays ?
  • Cost?
  • Implementation Plans
  • 5 year development 7 year notification
  • 2012 earliest

11
How further work will be undertaken.
  • Develop close links between Navigation,
    Communication and ATC domains
  • CBA
  • Fast time simulations
  • Real time simulations
  • Safety studies
  • Pre-operational Trials
  • Arrival Departure Managers
  • RNAV procedures in TMA
  • ARINC 702A developments

12
Acknowledgements
  • Scientists/engineers of the RD Establishments
  • In Particular
  • Ronald Verhoeven, NLR - AHMI Project Manager
  • Reg Harlow, DERA - Major contributor
  • Bob Maddock, Eurocontrol - EFMS Production
    Manager
  • Roland Rawlings, Eurocontrol - Father of the EFMS
    Project and Airborne Programme

13
Airborne Programme
  • by
  • E. Bailey, Airborne Project Leader
  • EUROCONTROL
  • next
Write a Comment
User Comments (0)
About PowerShow.com