Title: TTA Activities on IMT-Advanced standardization


1
TTA Activities on IMT-Advancedstandardization
Global Standards Collaboration (GSC) 14
DOCUMENT GSC14-PLEN-050
FOR Presentation
SOURCE TTA, Korea
AGENDA ITEM 6.1
CONTACT(S) Daejung Kim(kdj_at_tta.or.kr)
  • DJey KIM (kdj_at_tta.or.kr)
  • TTA

2
Highlight of Current Activities
  • ITU-R WP5D invited technology submission for
    IMT-Advanced standards.
  • 3GPP and IEEE presented their intention to submit
    LTE-Adv. and IEEE 802.16m during past WP5D
    meetings through initial submission at Feb. WP5D
    meeting.
  • 3GPP submitted detailed technology description at
    June WP5D meeting.
  • 13 evaluation groups were registered as
    independent evaluation groups in order to
    evaluate candidate technologies against IMT-Adv
    minimum requirement.
  • Detailed evaluation will be discussed in 7th
    8th WP5D meetings in accordance with ITU-R WP5D
    schedule.

3
Highlight of Current Activities
  • TTA are actively involved in the IMT-Adv
    submission and evaluation activities.
  • TTA endorsed LTE-Advanced submission as an
    organization partner of 3GPP at June WP5D meeting
  • TTA also supports IEEE 802.16m technology for
    IMT-Advanced candidate technology.
  • TTA registered as independent evaluation group,
    and provided technical contributions to WP5D
    e.g., C-code implementation of channel model, and
    clarification of channel model.
  • TTA has actively participated in CJk-B3G
    collaboration.
  • AWF and 3GPPs collaboration were agreed as work
    scope.
  • SIG on Evaluation was established.
  • 10 Joint contributions were made toward WP5D so
    far

3
Geneva, 13-16 July 2009
4
Proposed Strategic Direction
  • It is very important for ITU-R WP5D to manage the
    IMT-Advanced standardization process on time.
  • Broadband networks are demanded for high-capacity
    services on newly identified spectrum at WRC-07.
  • Based on timely IMT-Adv. Work completion, WRC-11
    preparation can be smooth
  • This concludes that IMT-Advanced standardization
    process should be maintained in a transparent and
    efficient manner.
  • The progress of works should be well documented
  • The works of proponents and evaluation groups
    should be well organized.

5
Challenges
  • The difference of evaluation results
  • Multiple evaluation methods are specified for
    different perspectives of evaluation for
    IMT-Advanced RIT or SRIT.
  • ITU-R M.2135 didnt specify every details on
    evaluation methodologies with consideration of
    different conditions required by different
    technologies.
  • The different understanding or implementation of
    evaluation methodology described in the Report
    ITU-R M.2135 by different evaluation groups.
  • It is difficult to calibrate evaluation
    methodologies among evaluation groups taking into
    account time and resource.
  • The ambiguity of consensus building(Step7)
  • After compliance assessment with minimum
    requirements at Step 6, consensus building and
    decision (step7) will begin. However, there is no
    clear definition guideline on how to achieve
    objectives of consensus building.

6
Next Steps toward IMT-Adv. Standardization
  • The efficient work under IMT.RADIO
  • Although scope and work plan for IMT.RADIO was
    proposed at the previous WP5D meeting, there are
    still different views.
  • However, TTA is of view that IMT.RADIO is needed
    for an interim document to smoothly connect
    evaluation discussion to ITU-R M.IMT.RSPEC
    development.
  • Therefore, TTA would like to propose that
    IMT.Radio should be developed towards a new
    IMT-ADV document under current workplan in order
    to facilitate consensus building process, while
    comprised of the summary of discussion on the
    evaluation of each candidate RIT/SRIT

7
Supplementary Slides
8
FIGURE A2-1 (IMT-ADV/2-E) Schedule for the
development of IMT-Advanced radio interface
Recommendations
9
IMT-Advanced development process (ITU-R WP5D)
Steps ofIMT-Advanced process Work aspect Responsible Group Note
Step 1 Issuance of circular letter Ad Hoc Circular Letter Completed
Step 2 Development of candidate RIT/SRITs Proponents External to ITU
Step 3 Reception of the RIT/SRIT proposals Acknowledgement of receipt Radiocommunication Bureau SWG Coordination
Step 4 Evaluation of candidate RIT/SRIT External Evaluation Group External to ITU
Step 5 Review and coordination of outside evaluation activities WG-TECH SWG Coordination is the focal point for internal and external coordination
Step 6 Review and access compliance with minimum requirements WG-TECHSWG-EVAL
Step 7 Consideration of evaluation results, consensus building and decision WG-TECH SWG Coordination is the focal point for internal and external coordination
Step 8 Development of radio interface Recommendation(s) To be determined Decision will be made at later meeting