SVT 4/5 operation CDF meeting 1/16/2003 - PowerPoint PPT Presentation

About This Presentation
Title:

SVT 4/5 operation CDF meeting 1/16/2003

Description:

... lots of hard software work to implement: patterns, simulation, ... time increase ... Study&optimize: 4/5 has even more free parameters than 4/4 - try ... – PowerPoint PPT presentation

Number of Views:13
Avg rating:3.0/5.0
Slides: 10
Provided by: riccardo66
Category:
Tags: cdf | svt | meeting | operation | study | time

less

Transcript and Presenter's Notes

Title: SVT 4/5 operation CDF meeting 1/16/2003


1
SVT 4/5 operationCDF meeting 1/16/2003
  • G. Punzi for the SVT group

2
  • SVT had a test run after Christmas with 4/5
    operation and standard physics table (155818)
  • Uses all 5 SVXII layers allowing 1 miss
  • Standard mode (4/4) require 4 hits on a fixed
    set of 4 layers
  • Separate test of 3/3 (recover 3-layer wedges)
    (155918)
  • Expect efficiency improvement and less need for
    SVT config changes with changing SVX conditions.
  • 4/5 mode is part of the SVT design, yet took lots
    of hard software work to implement patterns,
    simulation, download code(Roberto, Bill,
    Jahred...)

3
Impact on trigger timing
  • SVT execution time increase 7µs
  • due to increased number of candidate track fits
    (compatible with expectations)
  • limited impact on overall L2 40µs ? 47µs
    (17)
  • No significant effect with the current L1 rate
    limitation
  • but we are looking at ways to control this anyway
  • Optimize patterns
  • Cut on strip noise

4
Impact on trigger rates
5
Resolution
  • Resolution uniform between combinations -
    slightly worse when L0 is missing
  • 3-layers larger I.P. tails 28 vs 17 (small
    number of wedges)

(µm)
6
Efficiency
  • Expect track efficiency improvement 1.4 for the
    2/3 of wedges with 5 active layers ? 1.25
    overall
  • Measurements of track eff. and S/B underway

Eff. Gain (for tracks with 4 good hits)
(?/a4)1-(1-a5)55(1-?)a5
Patt. Coverage (4-comb.)
7
D0 yield x1.70.1 (L3 tracks) (Roberto)
4/4
379 nb-1
4/5
471 nb-1
8
D0 yield x1.460.01 (full reco)(Stefano)
1.55
9
Plans
  • Analyze SVT calibration run taken last week
    (being produced)
  • Studyoptimize 4/5 has even more free parameters
    than 4/4 - try to get maximum benefit with
    minimal side effects.
  • Further L3 rate reduction by Si tracking will be
    important (Marco,Rolf x2 reduction)
  • Look forward to starting up with a new improved
    hadronic trigger after the shutdown
Write a Comment
User Comments (0)
About PowerShow.com