Title: ROME, 01 december 2003


1
ESoCE-NET 2003INDUSTRIAL PANEL RTI A MAIN
SUPPLIER OF ALENIA FOR AIRBUS A380 PROGRAM
  • ROME, 01 december 2003

2
RTI INDUSTRIAL ASSOCIATION
  • The SICAMB and ILMAS, already involved on several
    aeronautical programs, signed on 2002 a
    Memorandum of Understading (M.O.A) with Alenia
    Aeronautica as MAIN SUPPLIERS for AIRBUS A380
    Upper Deck Floor Grid- Middle.
  • The two companies have formed a Joint Venture,
    defined RTI (Raggruppamento Temporaneo di
    Impresa), to satisfy the program requirements by
    integration and optimization of their own
    capabilities. SICAMB is the mandator of RTI.

3
RTI Responsabilty
  • RTI is fully responsable for design, material
    Procurement, manufacturing, control and technical
    support of assigned Work Package, for all planned
    airplane versions.

4
CONCURRENT ENTERPRISEALENIA-RTI
  • The efficent development of RTI activities is
    steadily guarantied by commonality and operative
    integration with ALENIA.
  • TOPICS
  • Common Program Management methods
  • Progress rewiews
  • Design common phase
  • Training , particularly concerning criteria and
    tools applied to configuration and data
    management (PDM/CDP)
  • Common Design tools (H/W Workstations IBM
    R6000 S/W CAD/CAM CATIA CAE NASTRAN)
  • NETWORK LINK (ISDN)

5
ALENIA-RTI PROGRESS REWIEW MEETING (PRM)
  • ALENIA organises a PRM every month, to evaluate
    the Supplier activities status and identifie
    major risk area that could affect the program
    shedule.

6
ALENIA-RTI PRM Agenda
  • 0. Introduction
  • 1. Organization
  • 2. Resource Plan
  • 3. Activities Plan
  • 3.1 Master Phasing Plan
  • 3.2 Interface with Alenia
  • 4. Engineering
  • 5. Manufacturing
  • 5.1 Industrial engineering-Documentation
  • 5.2 Industrial engineering -Tools
  • 5.3 Material Procurement
  • 6. Transport Plan.
  • 7. RTI Suppliers
  • 8. S/W, H/W and exchange data
  • 9. Quality
  • 10. Criticality ed Action Items

7
CONCURRENT ENTERPRISEENHANCEMENTS
  • The on-line access to ALENIA technical data
    management System could improve the correct and
    on-time distribution of the informations, with
    cost reduction.