Monitoring and reporting 1 man year/a (total administration 2,5) ... for small schemes and minor activities impact assessment is enough ... – PowerPoint PPT presentation

Number of Views:14
Avg rating:3.0/5.0
Slides: 5
Provided by: iirist
Category:

less

Transcript and Presenter's Notes

Title: PowerPointesitys


1
The Finnish Three Instrument Package
Monitoring boundaries
4,1 TWh/a (4,6 TWh/a 2003)
Voluntary agreements 1997-gt
Energy Audits 1992-gt
Subsidies 1992 EAs 1998 EEIs
0,5 TWh/a
1,5 TWh/a
Total effect 5,0 TWh in 2002 (not 6,1)
2
Monitoring Energy Audits
1,5 TWh (2002)
1,5
Annual Report on EAP since 1994
Energy Audit Clients
  • Analysis on the EAs
  • EA volumes (31 building types)
  • EE measures (30 categories)
  • Saving potentials and investments
  • Implementation status of measures
  • Impact assessment of the EAP
  • Data available for all kind of analysis

Energy Audit reports 400/year
Subsidy applications 100/year
Follow-up questionnaire 1995, 1996, 1999 2000 -gt
via VA
15 Regional EED Centres
EA Database since 1994
Motiva The Operating Agent
  • Content
  • 5.800 buildings
  • 30.000 EE measures
  • 350-400.000 individual
  • numbers

EAP Resources - Monitoring and reporting 1 man
year/a (total administration 2,5) - One follow-up
on implementation status 2 man months - System
development cost approx. 50 k
3
Monitoring Voluntary Agreements
4,1
Annual VA Scheme Report
400 Enterprises and Municipalities
Annual VA Branch Reports
Annual reporting 600/year
Accession phase data
  • Analysis on the VAs
  • Total consumptions with detail breakdowns
  • EE measures
  • savings and investment costs
  • status of implementation
  • Impact assessment of the VAs (sectoral)
  • Various other EE related information
  • Data available for all kind of analysis

6 Branch Associations
VA Database since 1999
Motiva
  • approx.
  • 5.800 buildings
  • 30.000 measures
  • 350.000-400.000
  • individual numbers
  • stored in database

Annual inputs 30...200 figures per report total
of 30.000 figures per year
VA Resources - Monitoring and reporting total
2,1 man years in 2003 - System development costs
approx. 150 k
Total content some 150.000 figures
Energy Audit Database
4
What shall, should or may the MS do
  • Monitoring systems for EAs and VAs are now
    serving 100 national needs
  • major schemes needs to be monitored no
    results, no financing
  • for small schemes and minor activities impact
    assessment is enough
  • Total government expenditure on EAs and VAs is
    approx. 4 M/a
  • - 200.000 (5 ) is spent annually on
    monitoring and reporting
  • Are these monitoring systems in compliance with
    the Annex IV ?
  • full scale onsite third-party verification for
    EAs would cost roughly 12 M/a
  • (based on the 24 MV costs still acceptable
    with EPC)
  • Cost-efficiency of decreasing uncertainty an
    interesting topic to be discussed