Title: Management Plan
1Management Plan
2Management Plan
3Management
- ANU.
- RSAA.
- RSAA Project Management.
4The Australian National University1998
- 9644 Students.
- Including 1169 PhD Students.
- 3227 Staff.
- Operating Revenue A 498M.
- Including A40M Research Grants and Contracts.
5 6RSAA Statistics
- 25 Academic Staff.
- 50 General Staff.
- 15 PhD Students.
- Annual Budget A6M.
7 Research School of Astronomy and
AstrophysicsTechnical Areas
8RSAA Projects
- Past
- 2.3m Tiptilt.
- CASPIR.
- 50 Inch Telescope Refurbishment.
- 2.3m Telescope.
- Double Beam Spectrograph.
- 2.3m Imager.
- Current
- NIFS CoDS.
- WFI 8k?8k CCD Camera.
- IRIS2g Detector CoDS.
- 6dF CCD System.
9Project Management Principles
- PS, PE, and PM leading the project.
- Estimation by comparison and extrapolation of
past results. - Resourcing with experienced instrument builders.
- New staff allocated to non-critical projects.
- Scheduling using realistic staff availability.
- Quality Management Principle.
- Process Approach with continuing improvement.
- Reporting.
- Quality Assurance.
10NIFS
- Personnel.
- WBS.
- Schedule.
- Cost.
- Risks.
11NIFS Personnel
12 Key Personnel
Peter McGregor Project Scientist Jan van
Harmelen Project Manager John Hart Project
Engineer Peter Conroy Mechanical Design Gabe
Bloxham Optical Design Mark Downing Detector
Systems Martin Mulligan Control System Peter
Young Software Design Kim Sebo Software
Design Mark Jarnyk Software Design
13WBS
14Fast Tracking
- Can we dispense with PDR?
- Duplicate NIRI during CDS, starting immediately.
- Order detector immediately.
- Order Detector Controller soon.
- Have Test Cryostat ready for engineering
detector. - Start optical manufacture before CDR?
- Start mechanical manufacture before CDR?
- Start Spectrograph Trial Assembly as parts become
available. - Optics and Engineering Detector in Cryostat for
first cool-down. - Science Detector in Test Cryostat during NIFS 1st
2nd cool-down.
15Schedule
Work Scope Signed 24 August 1999 Draft Initial
OCDD 14 October 1999 Draft Initial FPRD 14
October 1999 Design Study Outline 01 December
1999 Revised Initial OCDD 14 February
2000 Revised Initial FPRD 14 February
2000 Design Study Documentation 01 March
2000 Conceptual Design Review 15 March
2000 Order Detector 02 May 2000 Critical Design
Review 08 December 2000 Ship to Hawaii 20 June
2002 Project Close-out 20 September 2002
16Milestones
17(No Transcript)
18Cost
- Conceptual Design Study 232k
- Detector 350k
- Labour 711k
- Hardware 266k
- Other 269k
- NIRI Duplication 1750k
- Total 3578k
19Cost Comparison
CoDR Proposal Conceptual Design
Study 232k 232k Detector 350k
250k Labour 711k 630k Hardware
266k 151k Other 269k 166k NIRI
Duplication 1750k 659k Total 3578k
2088k
20Risk Summary
21(No Transcript)
22(No Transcript)
23(No Transcript)
24(No Transcript)
25(No Transcript)
26(No Transcript)
27(No Transcript)
28(No Transcript)
29(No Transcript)
30(No Transcript)