Title: Alternative Method Process


1
Alternative Method Process
  • Glenn Landrum

2
Introduction
  • This is an outline of the Best Practice from
    the Building Department of the City of Houston
  • Glenn Landrum, CBO Senior Staff Analyst

3
Topics of Discussion
  • Our process is divided into three separate but
    related functions. These are powers and duties of
    the Building Official from Section 104 of the
    Building Code. A. Code Interpretations B.
    Modifications due to
    practical difficulties C. Alternative
    materials, design and methods of
    construction and equipment

4
Topic One
  • Code Interpretations must be rendered with
    respect to all available resources
  • Code commentaries of current, past and future
    editions of the Code, any Supplements available
    and opinion from ICC staff.
  • This will produce timely, accurate direction for
    your staff and the jurisdiction that you serve.

5
Topic Two
  • Modifications due to practical difficulties may
    be granted when circumstances of a particular
    building element dont allow strict enforcement
    of Code provisions.
  • A file must be established to document the issue
    and the equivalency of the solution in regard to
    the spirit of the Code.
  • This file must be retained and may be of value in
    the future.

6
Topic Three
  • Alternative Methods verification is time and
    energy intensive process.
  • The responsible person must be knowledgable in
    emerging building technologies and
    multiple-discipline plans examination.
  • This provides superior customer service to your
    staff and jurisdiction through continual
    research, training and a constant flow of
    technical papers pertaining to our most difficult
    issues.

7
Real Life
  • An example of a modification due to practical
    difficulty is the Occupant Load factor in a
    typical Mosque.
  • As our culture continues to diversify there are
    issues of spatial arrangements that are new.

8
What This Means
  • An effective Alternative Method Process is
    central to timely, accurate permit application
    approval and for prompt, wise completion of large
    and complex projects.
  • Remember to be responsive, accountable, accurate
    and helpful.

9
Next Steps
  • Please study Section 104 of your Building Code
    and examine your own process in that light.
  • Feel free to contact me with any Code related
    issue. Thanks GL