1
CS 450 Chapter 2The Software Process
  • 2.1-2.8 Real World Software Engineering--Details
    of Phases
  • 2.9 There is no Silver Bullet
  • 2.10-2.14 Improving the Process

2
The Software Process
  • The way a company produces software.
  • Varies from one company to another.
  • Aim is process improvement -- a better process
    will result in a better product .

3
Three Views of Software
  • Client customer who orders software.
  • User person(s) who will actually use software.
  • Developers producers of software, who attempt to
    meet client specifications and user needs.

4
Planning
  • Original project plan -- general time frame for
    completion of each of the phases and product
    delivery.
  • Planning continues throughout development -- in
    each phase, detailed scheduling of next phase is
    done.
  • personnel assignments
  • completion date for each module
  • integration schedule

5
Requirements Phase
  • Preliminary investigation
  • generally what is wanted
  • what are the constraints (budget, delivery)
  • Successive refinements of requirements
  • Rapid prototyping
  • Requirements testing
  • Software Quality Assurance (SQA) group
  • Verify product will meet client/user needs
  • Manage change

6
Specification Phase
  • Explicitly describes
  • functionality -- what the product will do
  • constraints (e.g. must run on certain hardware,
    timing constraints ...)
  • Project charter or specification document serves
    as contract between developer and client
  • Paragraph numbers for cross reference

7
Specification Testing
  • Check for and correct
  • ambiguities (means different things to different
    people)
  • contradictions (different parts of document state
    different requirements)
  • incompleteness (not all functionality is
    described)
  • Formal review with client

8
Design Phase
  • Architectural Design
  • broken up into modules
  • data structure design
  • operations on data determined
  • interfaces between modules
  • Detailed Design
  • design of each module
  • Aim for modifiability

9
Design Testing
  • SQA Cross reference with requirements to assure
    each one is met.
  • Check for
  • logic faults
  • interface faults
  • missing exception handling
  • Walk-throughs and reviews with development team

10
Implementation and Integration
  • Modules written in self-documenting code and unit
    tested.
  • Modules gradually integrated and integration
    tested.
  • Product tested before release.
  • Acceptance test by client.
  • Possible alpha and beta testing (alpha -- at
    developer site beta -- at selected customer
    site(s)).

11
Maintenance
  • A high quality product is easily maintainable.
  • Maintainability was a factor in design.
  • Documentation is complete and up to date.
  • Maintenance testing
  • Each change is tested
  • Product is regression tested (previous tests run
    again in case new errors introduced)

12
Retirement
  • Legacy code is common and seldom retired.
    Eventually it may be for reasons such as
  • Further maintenance is no longer cost-effective.
  • Software is gradually being upgraded to new
    paradigm.
  • Product has outgrown its usefulness.

13
No Silver Bullet
  • Article by Frederick Brooks
  • ... building software will always be hard due
    to difficulties in its intrinsic nature
    (essence)
  • however, improved process can solve difficulties
    which surround software production and are not
    part of its nature (accidents)

14
Difficulties in Essence of Software
  • complexity due to interaction of components,
    number of possible states grows much faster than
    lines of code.
  • conformity must interface with existing
    systems.
  • changeability must model changing real world,
    increase functionality, run on new hardware.
  • invisibility cannot visualize all aspects at
    once.

15
Breakthroughs that have and will solve accidental
difficulties
  • historical high level languages and time
    sharing
  • software development environments
  • use of off the shelf software and components
  • rapid prototyping
  • incremental development
  • training, encouraging great designers

16
Improving the ProcessCapability Maturity Model
(CMM)
  • Internationally recognized rating of quality of
    an organizations software production process
  • CMM Levels
  • 1 Initial -- no standard process
  • 2 Repeatable -- Measurements from past similar
    projects used.
  • 3 Defined -- Process fully documented
  • 4 Managed -- Goals set for each project
  • 5 Optimizing -- Continuous improvement

17
ISO 9000 and SPICE
  • International Standards Organization industrial
    quality standards
  • Software guidelines are similar, but not
    identical, to CMM
  • International trade may require certification as
    ISO 9000 compliant

18
Homework
  • Read Chapter 2
  • Be prepared to discuss reading and these problems
    pp. 59, 60