Title: PBN Performance Based Navigation
1PBNPerformance Based Navigation
ICAO Performance Symposium March 2007
Federal Aviation Administration
Presented by Lex Hendriks, EUROCONTROL
2Elements of PBN Concept
3
1
2
3Elements of PBN Concept
3
1
2
4Elements of PBN Concept- Navaid Infrastructure -
- Ground-based Navigation Aids (Navaids)
- VOR DME (Not NDB)
- Space-based Navaids
- GNSS
- GPS Glonass future Galileo
NAVAID INFRASTRUCTURE
2
1
5Elements of PBN Concept
3
1
2
6Elements of PBN Concept- Navigation
Specification -
International Navigation Specifications published
in Volume II of PBN Manual
Aim is to limit number of Nav. Specs in
global use
- What PERFORMANCE is required of the RNAV system?
- What Functionalities must RNAV system have to
achieve Performance - What Navigation Sensors must be integrated in
RNAV system to achieve Performance - What requirements are placed on the Air crew to
achieve the required Performance from the RNAV
system?
Accuracy Integrity Continuity Availability
NAVIGATION SPECIFICATION
3
2
Document used by State as basis for developing
Certification Operational Approval
7Elements of PBN Concept- Navigation
Specification -
8Elements of PBN Concept- Navigation
Specification -
International NS in Volume II of PBN Manual
NAVIGATION SPECIFICATION
3
2
Document used by State as basis for Certification
Operational Approval
Better Performance
On-Board performance Monitoring and Alerting
9Elements of PBN Concept- Navigation
Specification -
On-Board performance Monitoring and Alerting
- On-board performance monitoring and alerting does
not only refer to containment in the MASPS
Annex 11 or PANS-OPS. - On-board performance monitoring and alerting
allows the air crew to detect that the RNAV
system is not achieving the navigation
performance required of the RNAV system
10Elements of PBN Concept- Navigation
Specification -
ICAO NAVIGATION SPECIFICATIONS
RNAV SPECIFICATIONS
RNP SPECIFICATIONS
International NS in Volume II of PBN Manual
11Elements of PBN Concept- Designation -
1
NAVIGATION APPLICATION
NAVIGATION SPECIFICATION
NAVAID INFRASTRUCTURE
3
2
B-RNP 1
RNAV 10
RNAV 5
RNP APCH
RNP AR APCH
B-RNP 1
RNP APCH
RNAV 10
RNAV 5
RNP AR APCH
X Navigation Accuracy in NM
12Elements of PBN Concept
3
1
2
13Elements of PBN Concept- Navigation Application -
1
NAVIGATION APPLICATION
3
- The APPLICATION (use of) the Navigation
Specification and Navaid Infrastructure - - For example Routes based on RNAV and RNP
Specifications (these rely on the Navaid
Infrastructure) - For example SIDs/STARs based on RNAV and RNP
Specifications - For example Approach procedures based on RNP
Specifications
14Elements of PBN Concept
3
1
2
15Example RNAV 1 Specification
- PERFORMANCE
- Functionalities
- Navigation Sensors
- Air crew requirements
Navigation Sensors
(1) DME/DME/IRU
(1) DME
(2) DME/DME
(2) DME
(3) GNSS
(3) GPS
16E.G RNAV 1 Specification (A)
1
STATE (A) RNAV 1 APPLICATION
State A
3
2
NAVAID INFRASTRUCTURE
STATE (A) RNAV 1 SPECIFICATION
Navigation Sensors
(1) DME/DME/IRU
(1) DME
(3) GNSS
(3) GPS
17E.G RNAV 1 Specification (B)
1
STATE (B) RNAV 1 APPLICATION
State B
3
2
NAVAID INFRASTRUCTURE
STATE (B) RNAV 1 SPECIFICATION
Navigation Sensors
(1) DME/DME/IRU
(1) DME
(2) DME/DME
(2) DME
18Context of PBN
Airspace Concept
Airspace Concept
COM
NAV
ATM
SUR
PBN
19Concept Summary (1)
NAVIGATION APPLICATION
- Use of Navigation Specification Navaid
Infrastructure (together)
PBN
NAVAID INFRASTRUCTURE
NAVIGATION SPECIFICATION
- RNAV SYSTEM PERFORMANCE
- Functionalities
- Navigation Sensors
- Air crew requirements
- Ground Based Navaids
- Space-Based Navaids
20Concept Summary (2)
1
NAVIGATION APPLICATION
(Use of NS NI)
3
2
NAVAID INFRASTRUCTURE
NAVIGATION SPECIFICATION
(Ground- Space-based)
(RNAV System Perf.)
X
X
21Concept Summary (3)
NAVIGATION SPECIFICATION
RNAV
RNP
22Concept Summary (3)
NAVIGATION APPLICATION
RNAV
RNP
23Why Change to PBN?
- PERFORMANCE
- Functionalities
- Navigation Sensors
- Air crew requirements
- Proliferation of national standards
- Wide variety of functional requirements
- Variety of required navigation sensors
- Differing air crew requirements
- Lack of global harmonsiation
Publication of PBN navigation specifications
seeks to limit number of certification standards
24PBN BENEFITS
- Reduction to number of sensor-specific routes
- Allows more efficient use of airspace
- Clarifies how RNAV systems are to be used
- Facilitates operational approval process for
operators by providing limited set of navigation
specifications intended for global use - Provides potential to exploits capabilities of
advanced RNAV systems - Enables navigation applications for Terminal
Airspace
25(No Transcript)