PBN Performance Based Navigation - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

PBN Performance Based Navigation

Description:

Elements of PBN Concept - Navaid Infrastructure - Ground-based Navigation Aids ... International Navigation Specifications published in Volume II of PBN Manual ... – PowerPoint PPT presentation

Number of Views:3539
Avg rating:3.0/5.0
Slides: 26
Provided by: icao
Category:

less

Transcript and Presenter's Notes

Title: PBN Performance Based Navigation


1
PBNPerformance Based Navigation
  • Concept Change -

ICAO Performance Symposium March 2007
Federal Aviation Administration
Presented by Lex Hendriks, EUROCONTROL
2
Elements of PBN Concept
3
1
2
3
Elements of PBN Concept
3
1
2
4
Elements of PBN Concept- Navaid Infrastructure -
  • Ground-based Navigation Aids (Navaids)
  • VOR DME (Not NDB)
  • Space-based Navaids
  • GNSS
  • GPS Glonass future Galileo

NAVAID INFRASTRUCTURE
2
1
5
Elements of PBN Concept
3
1
2
6
Elements of PBN Concept- Navigation
Specification -
International Navigation Specifications published
in Volume II of PBN Manual
Aim is to limit number of Nav. Specs in
global use
  • What PERFORMANCE is required of the RNAV system?
  • What Functionalities must RNAV system have to
    achieve Performance
  • What Navigation Sensors must be integrated in
    RNAV system to achieve Performance
  • What requirements are placed on the Air crew to
    achieve the required Performance from the RNAV
    system?

Accuracy Integrity Continuity Availability
NAVIGATION SPECIFICATION
3
2
Document used by State as basis for developing
Certification Operational Approval
7
Elements of PBN Concept- Navigation
Specification -
8
Elements of PBN Concept- Navigation
Specification -
International NS in Volume II of PBN Manual
NAVIGATION SPECIFICATION
3
2
  • RNAV System PERFORMANCE

Document used by State as basis for Certification
Operational Approval
Better Performance
On-Board performance Monitoring and Alerting
9
Elements of PBN Concept- Navigation
Specification -
On-Board performance Monitoring and Alerting
  • On-board performance monitoring and alerting does
    not only refer to containment in the MASPS
    Annex 11 or PANS-OPS.
  • On-board performance monitoring and alerting
    allows the air crew to detect that the RNAV
    system is not achieving the navigation
    performance required of the RNAV system

10
Elements of PBN Concept- Navigation
Specification -
ICAO NAVIGATION SPECIFICATIONS
RNAV SPECIFICATIONS
RNP SPECIFICATIONS
International NS in Volume II of PBN Manual
11
Elements of PBN Concept- Designation -
1
NAVIGATION APPLICATION
NAVIGATION SPECIFICATION
NAVAID INFRASTRUCTURE
3
2
B-RNP 1
RNAV 10
RNAV 5
RNP APCH
RNP AR APCH
B-RNP 1
RNP APCH
RNAV 10
RNAV 5
RNP AR APCH
X Navigation Accuracy in NM
12
Elements of PBN Concept
3
1
2
13
Elements of PBN Concept- Navigation Application -
1
NAVIGATION APPLICATION
3
  • The APPLICATION (use of) the Navigation
    Specification and Navaid Infrastructure -
  • For example Routes based on RNAV and RNP
    Specifications (these rely on the Navaid
    Infrastructure)
  • For example SIDs/STARs based on RNAV and RNP
    Specifications
  • For example Approach procedures based on RNP
    Specifications

14
Elements of PBN Concept
3
1
2
15
Example RNAV 1 Specification
  • PERFORMANCE
  • Functionalities
  • Navigation Sensors
  • Air crew requirements

Navigation Sensors
(1) DME/DME/IRU
(1) DME
(2) DME/DME
(2) DME
(3) GNSS
(3) GPS
16
E.G RNAV 1 Specification (A)
1
STATE (A) RNAV 1 APPLICATION
State A
3
2
NAVAID INFRASTRUCTURE
STATE (A) RNAV 1 SPECIFICATION
Navigation Sensors
(1) DME/DME/IRU
(1) DME
(3) GNSS
(3) GPS
17
E.G RNAV 1 Specification (B)
1
STATE (B) RNAV 1 APPLICATION
State B
3
2
NAVAID INFRASTRUCTURE
STATE (B) RNAV 1 SPECIFICATION
Navigation Sensors
(1) DME/DME/IRU
(1) DME
(2) DME/DME
(2) DME
18
Context of PBN
Airspace Concept
Airspace Concept
COM
NAV
ATM
SUR
PBN
19
Concept Summary (1)
NAVIGATION APPLICATION
  • Use of Navigation Specification Navaid
    Infrastructure (together)

PBN
NAVAID INFRASTRUCTURE
NAVIGATION SPECIFICATION
  • RNAV SYSTEM PERFORMANCE
  • Functionalities
  • Navigation Sensors
  • Air crew requirements
  • Ground Based Navaids
  • Space-Based Navaids

20
Concept Summary (2)
1
NAVIGATION APPLICATION
(Use of NS NI)
3
2
NAVAID INFRASTRUCTURE
NAVIGATION SPECIFICATION
(Ground- Space-based)
(RNAV System Perf.)
X
X
21
Concept Summary (3)
NAVIGATION SPECIFICATION
RNAV
RNP
22
Concept Summary (3)
NAVIGATION APPLICATION
RNAV
RNP
23
Why Change to PBN?
  • PERFORMANCE
  • Functionalities
  • Navigation Sensors
  • Air crew requirements
  • Proliferation of national standards
  • Wide variety of functional requirements
  • Variety of required navigation sensors
  • Differing air crew requirements
  • Lack of global harmonsiation

Publication of PBN navigation specifications
seeks to limit number of certification standards
24
PBN BENEFITS
  • Reduction to number of sensor-specific routes
  • Allows more efficient use of airspace
  • Clarifies how RNAV systems are to be used
  • Facilitates operational approval process for
    operators by providing limited set of navigation
    specifications intended for global use
  • Provides potential to exploits capabilities of
    advanced RNAV systems
  • Enables navigation applications for Terminal
    Airspace

25
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com