Water Power Peer Review Risk Analysis of the Potential Ecological Impacts of MHK Arrays M. Grippo and I. Hlohowskyj MHK MA\Categorizing and Evaluating the Effects of ... – PowerPoint PPT presentation

Number of Views:87
Avg rating:3.0/5.0
Slides: 11
Provided by: www1EereE
Category:

less

Transcript and Presenter's Notes

Title: Water Power Peer Review


1
Water Power Peer Review
Risk Analysis of the Potential Ecological Impacts
of MHK Arrays
  • M. Grippo and I. Hlohowskyj
  • MHK MA\Categorizing and Evaluating the Effects of
    Stressors
  • Argonne National Lab
  • mgrippo_at_anl.gov
  • November 2011

2
Purpose, Objectives, Integration
  • Ecological impacts are a major concern in the
    regulatory review of MHK projects and uncertainty
    about biological impacts will slow the pace of
    field deployments.
  • Ecological risk analysis of MHK deployments
  • Single deployment
  • Array of devices
  • Cumulative Impacts
  • - The incremental increases in impacts from a
    single
  • MHK device to large-scale commercial
    developments
  • - Interaction of the MHK device with existing
  • impacts from other anthropogenic stressors

3
Purpose, Objectives, Integration
  • Objectives
  • Aid developers in meeting NEPA requirements by
    addressing concerns of regulatory and management
    agencies
  • Identify the highest risk impacts that will
    likely require mitigation
  • Identify data gaps that need to be investigated
    to reduce uncertainty
  • Integration
  • Incorporate the results of field and laboratory
    studies conducted by partner labs into our risk
    analysis
  • Suggest new endpoints for other labs to evaluate
    experimentally

4
Technical Approach
  • Widely accepted EPA Risk Assessment Framework
    problem
  • formulation, analysis, and risk characterization
  • Problem formulation-Conceptual models (CM)
  • Identifies MHK stressor-receptor relationships
  • -Stakeholder communication, data gaps, prediction
  • -Readily modified as new data become available
  • Address Risk
  • -MHK Operations Collision, noise, EMF habitat
    alteration
  • -MHK Structure Habitat alteration reef effect
  • -Population and Ecosystem level risks

5
Plan, Schedule, Budget
  • Schedule
  • Initiation date 9/1/2009
  • Planned completion date 9/30/2012
  • FY10 Milestones Report documenting the
    preliminary CMs and their application to benthic
    habitat alteration at proposed development sites
  • FY11 Milestones Report documenting revised CMs
    and the summary of recent environmental research
    on MHK deployments
  • FY12 Milestones Risk analysis and CMs
    incorporating the most recent studies of the
    ecological effects of MHK deployments
    (9/20/2012).
  • Budget
  • Approximately 61 of the total project funding
    has been spent to date

Budget History Budget History Budget History Budget History Budget History Budget History
FY2009 FY2009 FY2010 FY2010 FY2011 FY2011
DOE Cost-share DOE Cost-share DOE Cost-share
307K - 61K - 244K -
6
Accomplishments and Results
  • FY10
  • 1. Developed CMs of risks associated with a
    single device and MHK arrays based on existing
    literature
  • 2. Developed framework for cumulative impact
    analysis
  • 3. Applied CMs to benthic ecosystems at four
    locations considered for MHK deployment

7
Accomplishments and Results
  • FY11
  • 1. Submitted CMs for review to multiple resource
    agencies
  • 2. Revised CM report incorporating agency
    comments
  • 3. Currently in the Analysis Phase
  • -Evaluating MHK monitoring studies currently
    available
  • -Working with USACE on using individual based
    models quantify exposure probabilities

8
Accomplishments and Results
Habitat mediated impact routes from MHK
arrays Higher order interactions more difficult
to address CM shows POTENTIAL EFFECTS
9
Challenges to Date
  • Lack of data to inform the risk analysis held up
    2011 work
  • Few MHK deployments
  • Inconclusive results from available monitoring
    studies
  • Resources and potential impacts vary by
    technology and project location
  • Challenging to evaluate cumulative impacts
  • Cumulative impacts analysis requires
    understanding of MHK device impacts
  • Working with developers to design monitoring
    plans that will effectively address high priority
    ecological risks

10
Next Steps
  • FY12
  • 1. Continue analysis phase of risk assessment
  • -Incorporate new studies and data generated by
    partner labs
  • 2. Characterization of Exposure
  • -Contact with ecological receptors based on
    species life history
  • -Empirical or mechanistic models of animal
    movement to quantitatively
  • evaluate exposure risk
  • 3. Revise CMs based on new data
  • Milestones and Deliverables
  • Risk analysis report and conceptual models (CM)
    integrating most current risk information on MHK
    devices
  • Future Work
  • Ongoing incorporation of new data into CM
  • Development of targeted individual based models
Write a Comment
User Comments (0)
About PowerShow.com