Title: Jeff Carpenter


1
WSDOT Design-Build Contracting
Jeff Carpenter State Construction Engineer
Paula Hammond Secretary of Transportation
J.C. Lenzi Assistant Secretary Engineering and
Regional Operations
2011 AASHTO Subcommittee on Construction Virginia
Beach City, VI August 2, 2011
2
WSDOT Design Build Experience
  • Began as One-off Mega projects delivery tool
  • Selection process has been primarily two
    step/short list with stipend
  • Best Value determined as proposal price adjusted
    by technical score
  • WSDOT moving to Strong Owner role, no longer
    Engineer of Record
  • Adapting our design practices to Contract
    Standards

3
WSDOT Design-Build advantages
  • Cost Certainty
  • Scope Control
  • Can drive immediate innovation during procurement
  • Lower owner personnel commitment
  • Design-Build model works well on complex and
    larger projects

4
Roles and Responsibilities - Design
  • Design Builder
  • Prepares and stamps the design Engineer of
    Record
  • Owns risk of design errors no change order for
    plan omissions or survey errors
  • Maintains files and design documentation
  • Accepts quantity/cost risk
  • Performs Construction QC/QA
  • Owner
  • Prepares preliminary design approval document
    used to determine deviations if Design Builder
    makes changes
  • ACCEPTS the design at the end of the project
  • Verifies that the Design Builder is meeting WSDOT
    standards with over-the-shoulder reviews and
    audits
  • Responsible for environmental permitting

4
5
Roles and Responsibilities - Construction
  • Design Builder
  • Performs Quality Control
  • Performs Quality Assurance
  • Responsible for finding solutions to problems
    encountered
  • Responsible for environmental compliance
  • Accepts Constructability Risk of their own design
  • Accepts Schedule Risk
  • Certifies Materials Quality/compliance with
    Federal funding requirements
  • Initial Differing Site Condition Risk is assigned
    to DB via a project deductible
  • Owner
  • Provides Quality Verification
  • Over the shoulder review and comment of
    engineering solutions
  • Administration and payment of contract
  • Assumes responsibility for catastrophic risk

5
6
Ongoing/Future Efforts
  • Outreach/contact with industry
  • AGC/ACEC/WSDOT Design Build Team
  • WAPA
  • Outreach/support/education to projects
  • Incorporate Design Build in a Design Bid Build
    agency
  • Expanded use of DB on mid-sized projects
  • Establishing a consistent selection process for
    DB projects
  • Standardizing the contract template documents
  • Introducing scalability for use on small
    projects
  • Increased use of DB to meet agency resource
    limitations