Title: Comic Sans MS size 44
1Comic Sans MS size 44
3/4
- First level bullet (size 32)
- Second level bullet (size 28)
- Third level bullet (size 24)
3/4
3/4
2(No Transcript)
3Oil Shipping Example From Bazarra and Jarvis
- Transport 20,000,000 barrels of oil from Dhahran,
Saudi Arabia to Rotterdam (4 Mil.), Marseilles
(12 Mil) and Naples (4 Mil.) in Europe - Routes
- Ship oil around Africa to
- Rotterdam 1.20/barrel
- Marseilles 1.40/barrel
- Naples 1.40/barrel
- Dhahran -gt Suez -gt Suez Canal -gt Port Said
- 0.30/barrel from Dhahran to Suez
- 0.20/barrel through Suez Canal
- Port Said to
- Rotterdam 0.25
- Marseilles 0.20
- Naples 0.15
4Oil Shipping Example From Bazarra and Jarvis
- Transport 20,000,000 barrels of oil from Dhahran,
Saudi Arabia to Rotterdam (4 Mil.), Marseilles
(12 Mil) and Naples (4 Mil.) in Europe - Route 1 ship oil around Africa to
- Rotterdam (cost 1.20/barrel)
- Marseilles (cost 1.40/barrel)
- Naples (cost 1.40/barrel)
5Oil Shipping Example Continued
- Route 2 Dhahran to Suez then pipeline to
Alexandria - 0.15/barrel through pipeline
- Alexandria to
- Rotterdam (cost 0.22/barrel)
- Marseilles (cost 0.20/barrel)
- Naples (cost 0.15/barrel)
6Oil Shipping Example Continued
- 30 of oil in Dhahran shipped in large tankers
that cant go through the Suez Canal - Pipeline from Suez to Alexandria has a capacity
of 10 million barrels of oil - Formulate as MCNFP
7Network Formulation
R
PS
M
S
D
A
N
8Network Formulation Continued
- Supply Node
- Dharhan has a supply of 20 M
- Demand Nodes
- Rotterdam, Marseilles and Naples have demands of
4 M, 12 M and 4M, respectively - Transshipment Nodes
- Suez, Alexandria and Port Said
9Arcs
Lower bound 0 for all arcs Upper bound
infinity for all arcs except (S,A) 10
million (S,PS) 14 million
10LP Formulation for Oil Shipping Example
11minimize 1.2 XDR 1.4 XDM 1.4 XDN 0.3 XDS
0.2 XSPS 0.15 XSA 0.25 XPSR 0.2 XPSM
0.15 XPSN 0.25 XAR 0.2 XAM 0.15 XAN subject
to XDR XDM XDN XDS 20000000 D XSPS
XSA - XDS 0 S XPSR XPSM XPSN - XSPS
0 PS XAR XAM XAN - XSA 0 PA -XPSR -
XAR - XDR - 4000000 R -XPSM - XAM - XDM -
12000000 M -XPSN - XAN - XDN -
4000000 N XSPS lt 14000000 (At most 70
through canal) XSA lt 10000000 ( Pipeline
capacity)
12Optimal Solution
Cost 13,500,000 Arc Flow XDS
20,000,000 XSPS 10,000,000 XSA
10,000,000 XPSR 4,000,000 XPSM
6,000,000 XAM 6,000,000 XAN 4,000,000