Title: District Boundaries
1(No Transcript)
2District Boundaries
3Buffalo District Program
FY 01 (000s) Work Allowance (WA)
FY 02 (000s) WA Expected
General Investigations 1,018
1,808 Construction General
(Construction) 1,235 6,716 Construction General
(Small Projects) 2,044 2,545 Operations
Maintenance 25,166 21,635 General
Regulatory 3,490 3,500 FUSRAP 48,659 33,322 Misce
llaneous 4,132 5,144 Total 79,412 71,168
4Operation Maintenance
FY 02 (000s) WA Expected
FY 01 (000s) WA Expected
Navigation Dredging 8,103
7,874 Structure Repair 5,555 4,380 Flood Control
326 1,025 In-house O M
11,182 8,354 Total 25,166 21,633
5FY 01 Construction Contracts
- Paint Lock Gates
- Hazardous Pipeline Removal
- Flood Protection Revetment
- Debris Removal
- Asbestos Abatement
- Maintenance Dredging
- Beach Nourishment
- Breakwater Repairs
- Lock wall Repairs
- SSP Bulkhead
- Erosion Control
6Construction Projects(FY02)
7Dredging Projects(FY02)
8FY03 and Beyond
9http//www.lrb.usace.army.mil/
http//www.lrb.usace.army.mil/
10Essayons!