Transforming El Camino Real - PowerPoint PPT Presentation

1 / 42
About This Presentation
Title:

Transforming El Camino Real

Description:

Transforming El Camino Real – PowerPoint PPT presentation

Number of Views:52
Avg rating:3.0/5.0
Slides: 43
Provided by: prei231
Category:

less

Transcript and Presenter's Notes

Title: Transforming El Camino Real


1
Transforming El Camino Real City of Belmont
City Council Review
2
Transforming El Camino Real Planning Design
Objectives 1 Promote a Smart Growth
Corridor - Link Transportation and Economic
Development along a Revitalized El Camino
Real - Build on Peninsula Corridor Plan and
local initiatives 2 Improve Access to
Caltrain Station Areas - Bus/Shuttle
Facilities - Streetscape Amenities/Crossings 3
Expand Non-Auto Circulation Throughout
Corridor - Pedestrians, Bicycles, Transit
Vehicles - Routes, Crossings,
Destinations 4 Enhance Visual Quality and
Image - Streetscape, Lighting, Signage -
Sidewalks, Median Islands, Gateways
3
City of Palo Alto El Camino Real Master
Schematic Design Plan (Photo Simulation by Urban
Advantage/Steve Price)
4
Peninsula Corridor Plan Belmont El Camino Real
Planning Design Goals Train Station a
Community Public Space on Both Sides
(Pedestrian Plaza on OC Road) Improve ECR
Pedestrian Crossings (Bulb-Outs, etc.)
Green/Buffer Edge along East ECR Frontage
Widen/Repair/Upgrade Frontage Sidewalks
Narrow Lanes for Wider Walks, Pedestrian Refuges
Improve Bus Stops w/Shelters, Seating,
Amenities
5
Belmont Study Area Conditions Diagram
6
Sidewalk Conditions
7
Sidewalk Conditions
8
Sidewalk Conditions
9
Pedestrian Crossings
10
Pedestrian Crossings
11
Pedestrian Crossings
12
Old County Road
13
Transit Facilities
14
El Camino Real - Street Width/Lane Conditions
15
Street Width/Lane Conditions
16
Street Width/Lane Conditions
17
Belmont Study Area Conditions Diagram
18
Belmont Study Area Conditions Diagram
19
Belmont Study Area Conditions Diagram
20
Belmont Study Area Conditions Diagram
21
Belmont Improvements Concept Diagram
22
(No Transcript)
23
Belmont Improvements Concept Diagram
24
(No Transcript)
25
(No Transcript)
26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
(No Transcript)
30
City of Palo Alto El Camino Real Master
Schematic Design Plan Photo Simulation by Urban
Advantage/Steve Price
31
Crosswalk Refuges Before After Condition
32
Street Width/Lane Conditions
33
Wide Lane for Sharrow Bus Stop Condition (With
Parking Zone Trees)
Lane Configurations
34
Street Cross Section
35
Typical Frontage
36
Street Tree in Parking Zone
37
Special Condition South of ONeill
38
Sidewalk Conditions
39
South of ONeill Frontage - Proposed
40
Belmont Improvements Concept Diagram
41
East Side TOD Concept
42
Transforming El Camino Real City of Belmont
City Council Review
Write a Comment
User Comments (0)
About PowerShow.com