Title: Status of the EURISOL Design Study
1Status of the EURISOL Design Study
- Yorick Blumenfeld
- IPN Orsay
2Changes to the Management proposed by MB
- Y. Blumenfeld interim project leader to replace
G. Fortuna. - G. Fortuna will remain member of the MB at least
until April 2007. - C. Hovaguimian management support at Orsay
- R. Batistella will continue to administer website
at LNL (and assist with specific legal questions) - Changes submitted to SC on November 30.
320 Participants
412 Tasks
5The EURISOL Road Map
- Vigorous scientific exploitation of current ISOL
facilities EXCYT, Louvain, REX/ISOLDE, SPIRAL - Construction of intermediate generation
facilities SPIRAL2, MAFF,HIE-ISOLDE, SPES - Design and prototyping of the most specific and
challenging parts of EURISOL in the framework of
EURISOL_DS.
6UCx target
n-generator
H-
HWRs 176MHz
Elliptical ISCL 704 MHz
3-spoke ISCL 325 MHz
Elliptical ISCL 704 MHz
RFQ 176 MHz
One of several target stations
b 0.03
b 0.78
b 0.047
b 0.65
b 0.09, b 0.15
100 keV
1 ion source
1 GeV/q H-, H, 3He
1.5 MeV/u
60 MeV/q
140 MeV/q
H, D, 3He
gt200 MeV/q D, A/q2
Low-resolution mass-selector
Ion sources
A possible schematic layout for a EURISOL
facility
High-resolution mass-selectors
Secondary fragmentation target
To low-E areas
QWR ISCL 88 MHz
3 QWRs ISCL 88 MHz
8 HWRs ISCL 176 MHz
Spoke ISCL 264 MHz
Bunching RFQ
Charge-breeder
RFQs
To low-E areas
b 0.065
b 0.14
b 0.27
b 0.385
2-150 MeV/u (for Sn-132)
9.3- 62.5 MeV/u
2.1-19.9 MeV/u
To experimental area
To medium-energy experimental areas
7The Main Challenges
- Design a 5MW 1GeV proton driver with additional
capability of 200 AMeV deuterons and A/Q2 Heavy
Ions build and test prototypes of the cavities. - Design a liquid Hg converter which will accept 5
MW of beam power. - Design a UCx target which will make the most
efficient use of the neutrons produced. - Evaluate the safety constraints of the above set
up. - Design an efficient multi-user beam distribution
system. - Design a superconducting HI LINAC capable of
accelerating 132Sn up to 150 AMeV - Investigate technologies for the instrumentation
of the future - Provide a conceptual study for a beta-beam
neutrino facility.
8Gathering the expertise in joint Management-Task
meetings
- User Requirements
- Post accelerator, beam preparation, physics
- Orsay, May 2
- Extended Driver capability
- Direct target, driver, cavities, beam intensity
- GSI, May 5
- High Power target
- Hg converter, fission target
- Legnaro, Oct 4
9Driver accelerator
- 1 GeV 5 MW proton beam
- 3He at 2 GeV,
- deuterons at 250 MeV,
- heavy ions of A/Q2 at 125AMeV
From A. Facco, task 7
10Reference MMW Target Station
Hg converter and secondary fission targets
Hg loop with window 8 UCX targets 40x6x3 cm
Problems Diffusion-Effusion Time Ion Sources
Y. Kadi and L. Tecchio tasks 2 and 4
11Next Joint Meetings
- Ion Sources
- Safety
- Multi-User capability
- .
12Other AchievementsPlease visit www.eurisol.org
- Fully functional dynamic website
- Agenda and Minutes of 71 meetings
- 60 Publications and internal reports
- Official Documents, Annual Reports, Presentations
. - Automatic publication review procedure
- Full compliance by task leaders
- Milestones and deliverables
- Outreach Pages
-
13A Slow Start
- Initial difficulties in recruiting post docs
- Spending for the first year was only 35 of first
advance Second advance delayed by 1 year. - Some delays in milestones
- Pace has picked up strongly in the second year
- Change of expenditure profile will be requested.
- Possible extension of contract by 6 months will
be discussed in Spring 2007.
14EURISOL
Design Study
15Milestone Status
EURISOL
Design Study
(3)
(3)
(1)
(3)
G. Fortuna, PSI JUNE 2006
16Possible Locations?
The Design Study will investigate the
implementation and cost of EURISOL in these 3
hypotheses by putting in place a committee in
Spring 2007, including the MB technical
coordinator experts. Report in Spring 2008
17New research infrastructures in FP7
- Objective To help create new research
infrastructures of pan-European interest (or
major upgrades of existing ones) - - Design studies to support feasibility studies
for new infrastructures through a bottom-up
approach of calls for proposals - - Construction of new infrastructures (incl.
major upgrades) to promote the creation of new
infrastructures through a strategic approach
based on the work conducted by ESFRI on the
development of a European roadmap fro new
research infrastructures - ESFRI European Strategy Forum for Research
Infrastructures
From Alex Mueller
18New research infrastructures in FP7
- Support to Construction via a two-stage process
- The preparatory phase
- - restricted calls targeting priority projects
(based on the work of ESFRI) - ? to support finalisation of construction plans,
legal organisation, financial engineering,
management aspects (Second call in 2009) - The construction phase
- developed following the satisfactory
implementation of the preparatory phase - case by case approach (e.g. use of Article 171)
From Alex Mueller
19You are cordially invited to attend the EURISOL
DS Town Meeting at CERN on Nov.
27-28. Registration is open until Nov. 1 at
www.eurisol.org
For next year we are considering the possibility
of a joint Town meeting with EURONS