Title: Port of Los Angeles Environmental Programs
1Port of Los AngelesEnvironmental Programs
- Clean Air Programs
- - No Net Increase
- - Near Term AQ Measures
- - Green Terminals
- Water Quality Programs
- - Clean Marinas
- - Stormwater Management
- Habitat Management
- - Endangered Species
- - Habitat Management
- Site Restoration
- - Source Control Inspection
- - Property Restoration
- - Customer Compliance Monitoring
Resolving Environmental and Maritime Commerce
Issues in a manner that protects the interests
of both.
2Mayors ChallengeNo Net Increase In Air
Emissions
- Environmental Studies
- Baseline 2001
- Conducted Inventory
- Air Monitoring Under Way
- Risk Assessment Next Year
- NNI Task Force
- Immediate Near Term Actions/Measures
3NNI/Air Quality Task Force
- 26 August 2004 Task Force Formed
- Task Force Members/Stakeholders
- - Mayors Office - BNSF/UP/PHL Railroads
- - Port of Los Angeles - NRDC
- - ARB - ILWU
- - SCAQMD - Teamsters
- - U.S. EPA - Pacific Energy Partners
- - PMSA - PCAC Consultants
- - Port Community Advisory Committee (PCAC) (3)
- 7 October 2004 First Task Force Meeting
- - Formed Technical Working Group
- 2,3 March 2005 Preliminary Report
- 30 June, 2005 Final Draft to Mayor
- - Financial Working Group
- - Legal Working Group
4NNI Task Force Control Measures
- Ocean Going Vessels 17
- Harbor Craft 11
- Cargo Handling Equip. 9
- Rail 12
- Heavy Duty Vehicle 19
- 68
- VSR
- AMP
- Clean Fuels
- SECA
- Engine
- Standards
- Retrofit
- AMP
- Clean Fuels
- Engine
- Standards
- Replacement
- Eng. Standard
- Clean Fuel
- Idling Reduction
- EPA Tier 3
- DPF
- Alt. Fuels
- EPA Tier 2
- Diesel-Electric
- LNG
- Clean Fuels
- Electrification
Incentives
5NNI/Air Quality Task Force Forecasts
6Port Clean Air Program
- Emulsified Diesel - Yard Equip.
- Diesel Oxidation Catalysts
- Alternate Fuel Yard Equip.
- Tug Retrofits
- Cargo Vessel Speed Reduction
- Truck Modernization Program
- Alternative Maritime Power
- Inventory, Monitoring, Testing
7Alternative Maritime Power
Connecting Ships to Electric Power While at Berth.
China Shipping Terminal Stern/Barge 660 KV -
440 V
Yusen Terminal Side Mounted 660KV - 660 KV
NYK Atlas August 2004
8Near-Term Measures
- Immediate Control Measures - Through 2008
- Incentive Based Programs 52 Million
- Yard Tractor Replacement ULSD
- Cargo Handling Equipment ULSD
- Ship Auxiliary Engine LS Fuel
- Marine ULSD
- Gateway Cities Truck Replacement
- Truck Diesel Particulate Filters
- Locomotive Switch Engine Replacement
2,657 PM 2.5 truck equivalents removed from the
road.
9Green Terminal ProgramBerth 206-209
Request for Proposals
Green Measures
- 5-Year Occupancy
- Financial Evaluation
- Environmental Evaluation
- 5 Proposals - PO Nedloyd
- 100 VSRP - 40 miles off shore
- 70 AMP by 3rd Year
- Low Sulfur Fuel in Generators
- Maximize On/Near Dock Rail (65)
- Alternative Fuel Yard Tractors
- Other Yard Equip. - DOC ED
- ( Lbs NOx PM10
per TEU) - Other
- Refrigerated Containers - HFG-13a
- EMS or Equivalent
10Infrastructure Improvements
- Air Quality Benefits of Efficient Goods Movement
- Adequate Channel Depth
- Adequate Berthing
- Efficient Backlands
- -Cranes
- -Gates
- -Operations
- Efficient Inland Transportation System
- -Grade Separations
- -Intermodal Facilities
- -24/7 Delivery
11(No Transcript)
12(No Transcript)