Title: M' Sullivan and FJ Decker


1

Beam Current Limits at the end of Run 6
  • M. Sullivan and F-J Decker
  • for the
  • PEP-II Team
  • Machine Advisory Committee Review
  • November 15-17, 2007

2
HER Beam current
  • In the middle of August we developed a vacuum
    leak in the upstream HER beam line from the
    detector. The leak closed when the beam was lost.
  • Limited the HER beam to 1775 mA
  • Then to 1800 mA
  • Gradually pumped out (virtual?) and was not a
    limit near the end of the run

3
HER beam current limit
  • About the same time we lost the power supply for
    LER RF station 4-3 and had to take the power
    supply of HER RF station 4-6.
  • Lowered the maximum possible HER beam current to
    2 A.
  • At the end of August we were now running into
    record breaking territory and decided to not push
    too hard.
  • At the very end of the run HER RF station 12-1
    had to be turned off due to vacuum problems and
    arcing
  • This limited the HER beam current to 1.8 A

4
LER beam current
  • Throughout August the LER beam current stayed at
    about 2.6 A
  • We tried to push up the LER current in the latter
    part of August
  • Luminosity kept going down as the LER current
    went up (Deckers talk)
  • We got up to about 2.75 A
  • Only briefly though and when we pushed the HER
    beam current up to 1.9 A
  • Tried an RF MD to try for 3 A
  • A fairly big jump in total beam current
  • RF system needed more tuning and processing