Title: Station1 Commissioning


1
Station1 Commissioning
  • Present status
  • Future plans

2
Station1 Commissioning
  • Its done !
  • or almost done

3
Local commissioning
  • mid-july readout of the four CROCUS in a
     local configuration 
  • local LDC with 1 rorc
  • local trigger (generator)
  • pedestal runs, calibration runs and 0-sup runs
    for all ½ chambers
  • ? http//ipnweb.in2p3.fr/alice/Documents.html
  • conclusion few manas died, calibration fails on
    some manus
  • ? about 19 have to be replaced
  • mid-september (last week) readout in semi-local
    configuration
  • CTP emulator
  • absolute bus patch numbering
  • pedestal run with 2 crocus
  • and Sunday late evening

4
Local commissioning
5
Local commissioning
1 Full Chamber absolute bus patch id is now
working
6
Local commissioning
7
Local commissioning
8
Going back to surface.
  • On Monday (24/09), we started to work from ACR
    integration of Station1 in ALICE DAQ
  • 4 fibers/CROCUS are in our LDC (each station has
    it own LDC in CR1)
  • ? be very careful with the mapping
    fiber/rorc/EquipId
  • LC2 rpm delivered to R.Divia who is in charge of
    its installation (muon_trk has an user account
    on LDC, no soft. installation !)
  • All software (Aliroot/mood) are available from
    ACR machine from which you login to the LDC
  • ? Once more DAQ team is giving a full support and
    help.
  • On Tuesday (25/09) Full readout of Station 1
  • 4 CROCUS read at 580 Hz (pedestal runs) ? 540MB/s
  • absolute bus patch numbering
  • CTP emulator
  • 300000 triggers, 1 error seen in the CDH
    (readout kept going on)
  • ? No major problem, no fine tuning it just
    worked and still works

9
Going back to surface. and stay there !
  • The good news
  • parity errors rate seems negligible
  • problem of higher noise with higher frequency has
    simply disappeared
  • DCS (LV, HV and gas -commissioned-) is working
    fine
  • working in ACR is so confortable compared to the
    cavern
  • Still some work to do hardware side
  • 3 GMS platform on chambers 1
  • Temperature sensors to install before air cooling
    test
  • and a few others things (another talk ?) to do
    with extreme care !!
  • Still more work to do DAQ side
  • we need to test 0-sup. and calibration runs
  • use the ECS
  • ? CROCUS code will be frozen and release
    sufficient for cosmic run.