Title: Folie 1
1 ZEPB-GTZ Training Course Hazardous Waste
Management in Germany November 2006 Treatment
and Disposal (Part 3) Eckart Schultes HIM
2Topic 4 Unit 2 Treatment and Disposal Content
- 0 Overview
- Mechanical Pre-Treatment
- 2. Physicochemical (Pre-)Treatment
- 3. Thermal (Pre-)Treatment
- Landfill Disposal
3Landfill Classes according to EU Landfill
Directive 1999/31/EC
4General Requirements for All Classes of Landfills
(EU/1999/31/EC)
5General Requirements for All Classes of Landfills
(EU/1999/31/EC)
6General Requirements for All Classes of Landfills
(EU/1999/31/EC)
7General Requirements for All Classes of Landfills
(EU/1999/31/EC)
8Requirements on Landfill in Germany
9Base Seal System in Presence of Geological
Barrier (German DepV)
Base Seal System in Absence of Geological Barrier
(German DepV)
Requirements on Landfill in Germany
10Final Seal System Type Trisopalst
(Bentonite/Polymers)
Final Seal System (German DepV)
Requirements on Landfill in Germany
11Leachate Collection System
Requirements on Landfill in Germany
121. Step Biological Treatment
2. Step Final Treatment
Rework toLeachate Storage
De-Nitrification
Nitrification
Ultra Filtration
Sludge dewatering
Ion Ex- change
Leachate from Storage Tank
Charcoal Adsorption
Waste Water from Storage Tank
To Local Sewage Plant
Leachate Treatment at HazWaste Landfill
Billigheim (HIM)
13Landfill Waste Acceptance Criteria in Germany
14General Landfill Site Arrangement with
InterimStorage, Stabilization, Evaporation Pond
15General Landfill Site Arrangement with Interim
Storage, Stabilization, Evaporation Pond
16Hazardous Waste Landfill of HIM at Billigheim
17Acceptance Office / Weigh Bridge / Sampling /
Waste Identification Laboratory
Waste Acceptance at HazWaste Landfill Billigheim
(HIM)
18Waste Sampling at Hazardous Waste Landfill
Billigheim (HIM)
19Waste Deposition at Hazardous Waste Landfill
Billigheim (HIM)
20Waste Deposition at Hazardous Waste Landfill
Billigheim (HIM)
21Cleaning of Tires and Truck after Waste
Deposition on Landfill
22Moistening and Cleaning of Temporary Landfill
Areas and Roads
23Temporary Surface Cover on Landfill
24Temporary Surface Cover on Landfill
25Rain Water Collection and Inspection/Maintenance
Flange of Leachate Collector
Hazardous Waste Landfill of HIM at Billigheim
26View into a Leachate Collector (with some
incrustations)
27For Further Illustration on Remediation Work
and Post Closure Service of HIMs Mono Landfill
of Stabilized Sewage Sludge from Chemical
Industry Please Refer to refer to separate
file Mono Landfill Asslar.pdf