Title: Time Management


1
Time Management
  • Ahmed Awad, Ph.D., PMP

2
Time Management
  • It includes the processes required to ensure
    timely completion of the project.
  • Activity Definition.
  • Activity Sequencing.
  • Activity Duration Estimating.
  • Schedule Development.
  • Schedule Control.

3
Time Management
  • Techniques
  • Bar Chart.
  • Line of Balance.
  • Time Location Diagram.
  • Network Analysis (CPM).

4
Time Management
  • Activity List
  • Scope of Work, Specs, and Drawings.
  • CSI Format.
  • Work Breakdown Structure (WBS).
  • Activity List.
  • CSI, WBS, Activity ID, Cost Accounts, Activity
    Codes.

5
Time Management
  • Activity Duration Estimating
  • Quantity Take Off.
  • Resources (Labor, Material, Equipment
    Subcontractors).
  • Productivity Rates.
  • Duration.

6
Network Analysis (Critical Path
Method)(Schedule Development)
7
Network Analysis (Critical Path Method)
8
Network Analysis (Critical Path Method)
9
(No Transcript)
10
  • Early Finish (E.F.) Early Start (E.S.)
    Duration (Forward)
  • Late Start (L..S.) Late Finish (L.F) -
    Duration (Backward)
  • Total Float L.S. E.S.
  • L.F. E.F.
  • If total float (T.F.) 0 (Critical
    Activity)

11
Methods of Presentations
  • Arrow Diagram
  • Precedence Diagram

12
Precedence Diagram
E.S.
ID.
E.F.
Activity Description
L.S.
T.F.
L.F.
13
Relationships Types
  • FS Finish - Start
  • SS Start - Start
  • FF Finish - Finish
  • SF Start - Finish

14
Schedule Control
  • Target Schedule (Time Base Line, Original T. S.,
    Rev. 0.)
  • Current Schedule (Actual Schedule, Updated
    Schedule, Rev.1, 2..)
  • Comparison (Target vs. Current)
  • Reasons.
  • Corrective Action.
  • Change Orders.